← Back
Two stories - detached, small or mid-size
213-02 29 AVENUE
QUEENS · Bayside · BIN 4134658
💬 Discuss this project
1995Year Built
2Stories
A1Building Class
R2AZoning
2,400 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,613 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
General
Roof1p · 1 filing · 11 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/26/2019$1.2M—— → —$481/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC203/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRIOT ENERGY SOLUTIONS CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PATRIOT ENERGY SOL COGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116203/05/2025
Building Lifecycle
All (22)Filed (2)Permit Issued (1)Signed Off (1)Objection (8)Special Inspection (10)
05/13/2025
Signed off — Alteration
rooftop solar panel installation
Q00972176-I1
04/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
04/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
04/03/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
04/03/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
04/03/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
03/26/2025
Objection resolved — Addressed
03/24/2025
Objection raised — Other
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/14/2025
Objection raised — Other
03/14/2025
Objection raised — Other
03/05/2025
Filed — Alteration
rooftop solar panel installation
Q00972176-P1
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
02/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
02/12/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
02/12/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
02/12/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
01/08/2024
Permit issued — Solar
Q00972176-I1-SL
12/27/2023
Objection resolved — Addressed
12/26/2023
Objection raised — Other
12/07/2023
Filed — Alteration
rooftop solar panel installation
Q00972176-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offPATRIOT ENERGY SOL CO01/08/2024
BISMHISSUEDPICO DESIGN AND CONSTRUCTION INC01/23/1996
BISMHISSUEDPICO DESIGN AND CONSTRUCTION INC01/23/1996
BIS—ISSUEDPICO DESIGN & CONST11/20/1995
BISPLRE-ISSUEDJ & H/J.A.PLG AND HEATING07/31/1995
BISEQISSUEDPICO DESIGN & CONST05/16/1995
BIS—ISSUEDPICO DESIGN & CONST05/16/1995
BISEQISSUEDTRAINGLE CONTAINER SERVICES INC05/10/1995
1 project · most recent 12/06/2023
FiledStatusContractorScope
12/06/2023CompleteMAK ELECTRICAL CONTR CORP1 meters
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/03/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
04/03/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
04/03/2025FinalVYACHESLAV NECHAYEVprogress
04/03/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
04/03/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
02/12/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
02/12/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
02/12/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
02/12/2025FinalVYACHESLAV NECHAYEVprogress
02/12/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00972176-I1Request digital key ↗
08/14/2026Q00972176-P1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q00972176-P1Open ↗
08/25/2026Q00972176-P1Open ↗
08/22/2026Q00972176-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q00972176-P1Open ↗
08/13/2026Q00972176-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00972176-P1Open ↗
08/22/2026Q00972176-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00972176-I1Open ↗