← Back
BuildNYC
Two stories - detached, small or mid-size
213-17 NASHVILLE BOULEVARD
QUEENS · Cambria Heights · BIN 4240040
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3AZoning
1,024 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,400 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 17 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/16/2017$510K—HOLDING DAPCO LLC → Private party$498/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Etrecte203/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patriot Energy Solutions403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mak Electrical ContractingElectrical103/22/2026
Patriot Energy Sol CoGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Etrecte8116203/04/2025
Building Lifecycle
05/13/2025
Signed off — Alteration
ROOFTOP SOLAR PANNEL INSTALLATION
Q01078650-I1
03/04/2025
Filed — Alteration
ROOFTOP SOLAR PANNEL INSTALLATION
Q01078650-P1
03/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
03/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
03/04/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
14 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offPatriot Energy Sol Co07/23/2024
1 project · most recent 07/17/2024
FiledStatusContractorScope
07/17/2024CompleteMak Electrical Contracting—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/04/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
03/04/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
03/04/2025FinalVYACHESLAV NECHAYEVprogress
03/04/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
03/04/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
10/18/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
10/18/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
10/18/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
10/18/2024FinalVYACHESLAV NECHAYEVprogress
10/18/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
17 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account