← Back
Miscellaneous two family
213 24 STREET
BROOKLYN · BIN 3009522
💬 Discuss this project
1910Year Built
2Stories
B9Building Class
M1-2DZoning
1,620 sfGross Floor Area
2Units
Miscellaneous two family · Owner of record: BROOKLYN BROWNSTONE HOME GROUP LLC · 1,878 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Floor 22p · 1 filing · 20 docs
Floor 1
Cellar6p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/23/2025$930K—Private party → BROOKLYN BROWNSTONE HOME GROUP LLC$574/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AARON MCDONALD ARCHITECT604/02/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor104/09/2026
PIPESTYLISTS, INCPlumbing107/08/2026
W.R. PLBG AND HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC DESIGN INC9758104/02/2026
AARON MCDONALD ARCHITECT5118107/30/2025
Building Lifecycle
All (40)Filed (6)Permit Issued (3)Signed Off (2)Inspection (5)Special Inspection (24)
07/28/2026
Signed off — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01261610-S1
04/07/2026
Signed off — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01261610-I1
04/06/2026
Special inspection requirement — Mechanical Systems
Aaron McDonald
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
04/06/2026
Special inspection requirement — Final
Aaron McDonald
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Aaron McDonald
04/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Aaron McDonald
04/06/2026
Special inspection requirement — Maintenance information
Aaron McDonald
04/06/2026
Special inspection requirement — Air barrier - visual inspection
Aaron McDonald
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Aaron McDonald
04/06/2026
Special inspection requirement — Fenestration air leakage
Aaron McDonald
04/06/2026
Special inspection requirement — Insulation placement and R values
Aaron McDonald
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Aaron McDonald
04/06/2026
Special inspection requirement — Interior lighting power
Aaron McDonald
04/06/2026
Special inspection requirement — Fenestration areas
Aaron McDonald
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Aaron McDonald
04/06/2026
Special inspection requirement — Ventilation and air distribution system
Aaron McDonald
04/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Aaron McDonald
04/02/2026
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01261610-P1
04/02/2026
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01261610-P4
02/03/2026
Permit issued — Plumbing
B01261610-S1-PL
01/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/26/2025
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01261610-P3
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
11/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
11/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
11/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
11/21/2025
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01261610-P2
11/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
11/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
11/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
11/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
09/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/28/2025
Permit issued — Plumbing
B01261610-S1-PL
08/05/2025
Permit issued — General Construction
B01261610-I1-GC-CX
07/30/2025
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01261610-S1
07/30/2025
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01261610-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP02/03/2026
DOB NOWPlumbingSigned-offT & T PLUMBING INC08/28/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY08/05/2025
1 project · most recent 04/02/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/02/2026Signed-offCUBE BUILDERS GROUP NYAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-3C24NA 25,000 BTU · Heat Pump Outdoor ×4
MXZ-3C30NA 36,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 04/02/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/02/2026Signed-offW.R. PLBG AND HTG CORPGas, Water/Sanitary
1 project · most recent 07/16/2026
General Wiring
FiledStatusContractorScope
07/16/2026CompleteINTERSTATE ELECTRIC, LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/06/2026Mechanical SystemsAaron McDonaldspecial
04/06/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
04/06/2026FinalAaron McDonaldprogress
04/06/2026Energy Code Compliance InspectionsAaron McDonaldprogress
04/06/2026Fire-Resistance Rated ConstructionAaron McDonaldprogress
04/06/2026Maintenance informationAaron McDonaldenergy_progress
04/06/2026Air barrier - visual inspectionAaron McDonaldenergy_progress
04/06/2026HVAC-R and service water piping design and insulationAaron McDonaldenergy_progress
04/06/2026Fenestration air leakageAaron McDonaldenergy_progress
04/06/2026Insulation placement and R valuesAaron McDonaldenergy_progress
04/06/2026HVAC-R and service water heating system controlsAaron McDonaldenergy_progress
04/06/2026Interior lighting powerAaron McDonaldenergy_progress
04/06/2026Fenestration areasAaron McDonaldenergy_progress
04/06/2026HVAC-R and service water heating equipmentAaron McDonaldenergy_progress
04/06/2026Ventilation and air distribution systemAaron McDonaldenergy_progress
04/06/2026Fenestration and door U-factor and product ratingsAaron McDonaldenergy_progress
11/25/2025Energy Code Compliance InspectionsEric Sunprogress
11/25/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
11/25/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
11/25/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
11/20/2025Energy Code Compliance InspectionsEric Sunprogress
11/20/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
11/20/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
11/20/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B01261610-P4Request digital key ↗
08/21/2026B01261610-P3Request digital key ↗
08/21/2026B01261610-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/21/2026B01261610-P4Open ↗
08/21/2026B01261610-S1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01261610-P3Open ↗
08/21/2026B01261610-P2Open ↗
08/21/2026B01261610-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026B01261610-P2Open ↗
08/31/2026B01261610-P2Open ↗
08/27/2026B01261610-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B01261610-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026B01261610-P3Open ↗
08/21/2026B01261610-P2Open ↗
08/21/2026B01261610-P1Open ↗
Showing 3 of 6 on file for this type