Combined-Bay Terrace Shopping Center 1-4 Campus
213-25 26TH AVENUE · BIN 4619943
💬 Discuss this project
1961Year Built
2Stories
K6Building Class
C4-1Zoning
198,298 sfGross Floor Area
47Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: 21245 26 Ave · 606,761 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofClub StudioUnder Construction25p · 4 filings · 20 docs
Floor 2Club StudioUnder Construction12p · 7 filings · 20 docs
Floor 1Club StudioUnder Construction12p · 8 filings · 20 docs
Site & exteriorClub StudioUnder Construction18p · 5 filings · 14 docs
Filed — no permit issuedAdd second story and gym tenant space1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cord Meyer Development3910/15/2026
Cord Meyer/McO/Citizens Development1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SBLM Architects610/14/2026
Dmitry Levin410/14/2026
AG Engineering209/21/2026
MG Engineering306/05/2026
Studio 222 Architects303/05/2026
FL&M Engineering Design & Inspection210/09/2025
Johnson Wilbur Adams105/01/2025
RTM Engineering Consultants204/29/2025
GEI Consultants101/06/2025
Bohler Engineering NY109/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Approvals1003/21/2026
Bohler Engineering103/21/2026
SBLM203/21/2026
J.A.M. Associates1203/21/2026
Geiger E A Group403/21/2026
Sol Building Consulting Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.E. Gleeson ConstructorsGeneral Contractor709/23/2026
Titan Builders & ConstructionGeneral Contractor407/08/2026
Brook Plumbing & HeatingPlumbing307/08/2026
A1 SpecializedSign hanger209/23/2026
MC SuperstructureScaffold204/08/2026
A & F Fire Protection CoFire Protection209/09/2026
Brook Plumbing & HeatingFire Protection207/08/2026
Lakewood GroupGeneral Contractor107/08/2026
Lakewood GroupScaffold107/08/2026
Drilon Plumbing & HeatingPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Whitestone Associates Engineering8144910/14/2026
Big Apple Group NY A Rma9168706/05/2026
Building Lifecycle
All (177)Filed (25)Permit Issued (25)Signed Off (3)Violation (5)Inspection (10)Objection (79)Special Inspection (30)
10/15/2026
Objection raised — Energy
10/15/2026
Objection resolved — Resolved
10/15/2026
Objection raised — Admin
10/15/2026
Objection resolved — Resolved
10/14/2026
Filed — Alteration CO
RENOVATE EXIST. 1 STORY COMM SPACE WITH HIGH CEILING. ADD 2ND STORY TO BLDG WITHOUT CHANGING BULK/EXIST HEIGHT. NEW GROUND FLR SLAB, NEW ROOF INSULATION & MEMBRANE.FACADE WORK.CHANGE USE FOR NEW GYM TENANT.FILING TO CHANGE ALTCONBEE #Q01154016-I1 TO ALTCO
Q01467520-I1
10/14/2026
Filed — Alteration
Install new manual wet standpipe system, including piping, roof manifold, hose valves, FDC, backflow preventer, and connection to existing water service, as shown on plans. No change in use, egress, or occupancy.
Q01439989-P1
10/13/2026
Filed — Alteration
Q01327014-P1
09/22/2026
Permit issued — Mechanical Systems
Q01178353-S1-MS
09/22/2026
Permit issued — Sign
Q01456979-I1-SG
09/22/2026
Permit issued — Sign
Q01456993-I1-SG
09/21/2026
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING "CLUB STUDIO"
Q01456993-I1
09/21/2026
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN REAGING "CLUB STUDIO"
Q01456979-I1
09/08/2026
Permit issued — Standpipe
Q01439989-I1-EW-SD
09/08/2026
Special inspection requirement — Final
ARIEL GOLSHAN
09/08/2026
Special inspection requirement — Final
ARIEL GOLSHAN
09/01/2026
Filed — Alteration
Install new manual wet standpipe system, including piping, roof manifold, hose valves, FDC, backflow preventer, and connection to existing water service, as shown on plans. No change in use, egress, or occupancy.
Q01439989-I1
08/05/2026
Permit issued — General Construction
Q01178353-I1-GC
08/03/2026
Special inspection requirement — Standpipe Systems
Mudar Khantamr
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Fenestration air leakage
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Air barrier - visual inspection
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Insulation placement and R values
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Electrical motors and elevators
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Preliminary
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Exterior lighting power
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Fenestration areas
SOORJBALLY HARILALL
07/22/2026
Special inspection requirement — Masonry
SOORJBALLY HARILALL
07/13/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01198828-I1
06/29/2026
Special inspection requirement — Duct leakage testing, insulation and design
SOORJBALLY HARILALL
06/29/2026
Special inspection requirement — Shutoff dampers
SOORJBALLY HARILALL
06/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
06/29/2026
Special inspection requirement — Electrical motors and elevators
SOORJBALLY HARILALL
06/29/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
06/29/2026
Special inspection requirement — Exterior lighting power
06/29/2026
Special inspection requirement — Final
SOORJBALLY HARILALL
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
06/29/2026
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
06/29/2026
Special inspection requirement — Lighting controls
SOORJBALLY HARILALL
06/29/2026
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
06/23/2026
Permit issued — Structural
Q01178353-S3-ST
06/23/2026
Permit issued — General Construction
Q01178353-I1-GC
06/23/2026
Objection raised — Energy
06/05/2026
Filed — Alteration
Q01154031-P1
06/05/2026
Permit issued — Sprinklers
Q01154044-I1-PL
06/05/2026
Special inspection requirement — Exterior lighting power
05/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
EXCAVATE SLAB ON GROUND FOR NEW CONCRETE FOOTING & 1ST FL SLAB INSTALLATION. BACKFILL AS REQUIRED.INSTALL REINFORCED MASONRY WALLS, NEW STEEL FRAMING. INSTALL 2ND FL CONCRETE SLABNEW EXIT STAIRWAYS, DOORWAYS, AND WINDOW FRAMING, ROOFTOP CURBS PER PLANS.
Q01154016-P2
05/11/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/08/2026
Permit issued — General Construction
Q01154016-I1-GC
05/07/2026
Permit issued — Structural
Q01178353-S3-ST
04/27/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
EXCAVATE SLAB ON GROUND FOR NEW CONCRETE FOOTING & 1ST FL SLAB INSTALLATION. BACKFILL AS REQUIRED.INSTALL REINFORCED MASONRY WALLS, NEW STEEL FRAMING. INSTALL 2ND FL CONCRETE SLABNEW EXIT STAIRWAYS, DOORWAYS, AND WINDOW FRAMING, ROOFTOP CURBS PER PLANS.
Q01154016-S1
04/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
03/25/2026
Permit issued — General Construction
Q01178353-I1-GC
03/05/2026
Filed — Alteration
INTERIOR TENANT BUILD-OUT RELATED TO PROPOSED WORKOUT FACILITY.
Q01178353-P2
02/25/2026
Violation issued (ECB, closed)
Unknown
02/25/2026
Violation issued (ECB, closed)
Site Safety
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedC.E. Gleeson Constructors09/22/2026
DOB NOWSignPermit IssuedMad Signs09/22/2026
DOB NOWSignPermit IssuedMad Signs09/22/2026
DOB NOWStandpipePermit IssuedA & F Fire Protection Co09/08/2026
DOB NOWGeneral ConstructionPermit IssuedC.E. Gleeson Constructors08/05/2026
DOB NOWStructuralSigned-offC.E. Gleeson Constructors06/23/2026
DOB NOWGeneral ConstructionPermit IssuedC.E. Gleeson Constructors06/23/2026
DOB NOWPlumbingPermit IssuedBrook Plumbing & Heating06/05/2026
DOB NOWGeneral ConstructionPermit IssuedTitan Builders & Construction05/08/2026
DOB NOWStructuralSigned-offC.E. Gleeson Constructors05/07/2026
DOB NOWGeneral ConstructionPermit IssuedC.E. Gleeson Constructors03/25/2026
DOB NOWSprinklersPermit IssuedAdvanced Automatic Sprinkler Co12/08/2025
DOB NOWPlumbingPermit IssuedDrilon Plumbing & Heating11/25/2025
DOB NOWGeneral ConstructionPermit IssuedC.E. Gleeson Constructors10/07/2025
DOB NOWSupported ScaffoldSigned-offMC Superstructure09/19/2025
DOB NOWSupported ScaffoldSigned-offMC Superstructure09/19/2025
DOB NOWPlumbingPermit IssuedBrook Plumbing & Heating08/15/2025
DOB NOWGeneral ConstructionPermit IssuedTitan Builders & Construction05/14/2025
DOB NOWPlumbingPermit IssuedBrook Plumbing & Heating03/26/2025
DOB NOWStandpipePermit IssuedSharp Plumbing03/26/2025
DOB NOWSprinklersSigned-offSharp Plumbing03/26/2025
DOB NOWMechanical SystemsPermit IssuedTitan Builders & Construction03/13/2025
DOB NOWStructuralSigned-offTitan Builders & Construction03/12/2025
DOB NOWGeneral ConstructionSigned-offLakewood Group09/15/2023
DOB NOWConstruction FencePermit IssuedLakewood Group09/11/2023
1 project · most recent 03/05/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/05/2026Permit IssuedC.E. Gleeson ConstructorsHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Lennox LGT092H5E 95,000 BTU · Rooftop Unit ×2
LGT240H5M 267,200 BTU · Rooftop Unit ×2
LGT072H5E 73,200 BTU · Rooftop Unit ×1
LGT102H5E 100,900 BTU · Rooftop Unit ×1
LGT120H5E 121,600 BTU · Rooftop Unit ×1
LGT180H5M 183,700 BTU · Rooftop Unit ×1
Heating
— AAON/ RN-011-B-A-8 4,000 CFM · Rooftop Unit ×1
Indeeco 932U03000D WCI 160 CFM · Electric Heater ×1
1 project · most recent 01/06/2025
FiledStatusContractorScope
01/06/2025Permit IssuedBrook Plumbing & Heating—
3 projects · most recent 10/14/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/14/2026———
03/05/2026Permit IssuedDrilon Plumbing & HeatingWater/Sanitary
01/06/2025Permit IssuedBrook Plumbing & HeatingGas, Water/Sanitary
3 projects · most recent 03/10/2026
General Wiring
FiledStatusContractorScope
03/10/2026CompleteSalvatore Campisi & SonsGeneral Wiring
11/03/2025Permit IssuedL&B Electrical InternationalGeneral Wiring
08/28/2025CompleteNash Electric Services—
2 projects · most recent 05/28/2026
Steel Concrete
FiledStatusContractorScope
05/28/2026Permit IssuedTitan Builders & ConstructionSteel, Concrete
03/05/2026Permit IssuedC.E. Gleeson ConstructorsSteel, Concrete
2 projects · most recent 10/09/2025
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
10/09/2025Signed-offMC SuperstructureScaffold, Sidewalk Shed
09/08/2023Permit IssuedLakewood GroupFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/11/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/15/2026Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
01/15/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/11/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
12/01/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
09/08/2026FinalARIEL GOLSHANprogress
09/08/2026FinalARIEL GOLSHANprogress
08/03/2026Standpipe SystemsMudar Khantamrspecial
07/22/2026Structural Stability – Alterations of existing buildingsSOORJBALLY HARILALLspecial
07/22/2026Post-installed AnchorsSOORJBALLY HARILALLspecial
07/22/2026MasonrySOORJBALLY HARILALLspecial
07/22/2026PreliminarySOORJBALLY HARILALLprogress
07/22/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
07/22/2026Electrical motors and elevatorsSOORJBALLY HARILALLenergy_progress
07/22/2026Air barrier - visual inspectionSOORJBALLY HARILALLenergy_progress
07/22/2026Fenestration and door U-factor and product ratingsSOORJBALLY HARILALLenergy_progress
07/22/2026Exterior lighting powerSOORJBALLY HARILALLenergy_progress
07/22/2026Insulation placement and R valuesSOORJBALLY HARILALLenergy_progress
07/22/2026Fenestration air leakageSOORJBALLY HARILALLenergy_progress
07/22/2026Fenestration areasSOORJBALLY HARILALLenergy_progress
07/22/2026Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
07/22/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
06/29/2026Mechanical SystemsSOORJBALLY HARILALLspecial
06/29/2026Post-installed AnchorsSOORJBALLY HARILALLspecial
06/29/2026FinalSOORJBALLY HARILALLprogress
06/29/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
06/29/2026Lighting controlsSOORJBALLY HARILALLenergy_progress
06/29/2026Electrical motors and elevatorsSOORJBALLY HARILALLenergy_progress
06/29/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
06/29/2026Exterior lighting power—energy_progress
Latest 25 of 95.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Club StudioFitness / RecreationFloors 1, 2
Project Q01456979 Alteration · Permit Entire · 09/21/2026
Project Q01456993 Alteration · Permit Entire · 09/21/2026
Project Q01178353 Alteration · Permit Entire · 04/15/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch22
10/15/2026Q01467520-I1Request digital key ↗
10/04/2026Q01456979-I1Request digital key ↗
10/04/2026Q01456993-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/18/2026Q01323764-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWHouse Number Verification: TOPO Stamp4
10/15/2026Q01467520-I1Open ↗
08/16/2026Q01154016-P1Open ↗
08/15/2026Q01154016-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
10/15/2026Q01467520-I1Open ↗
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature23
10/15/2026Q01467520-I1Open ↗
10/03/2026Q01439989-I1Open ↗
09/23/2026Q01456993-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026Q01154016-I1Open ↗
09/02/2026Q01154016-I1Open ↗
09/01/2026Q01178353-S3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026Q01154016-I1Open ↗
09/01/2026Q01178353-S3Open ↗
09/01/2026Q01154016-P2Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
10/15/2026Q01467520-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
10/15/2026Q01467520-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
10/15/2026Q01467520-I1Open ↗
10/03/2026Q01439989-I1Open ↗
08/24/2026Q00908806-I1Open ↗
Showing 3 of 16 on file for this type
▸Other Documents10
▸DOB NOWSite Survey: Initial4
10/15/2026Q01467520-I1Open ↗
08/16/2026Q01154016-P1Open ↗
08/15/2026Q01154016-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
10/15/2026Q01467520-I1Open ↗
08/16/2026Q01154016-P1Open ↗
08/15/2026Q01154016-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
10/15/2026Q01467520-I1Open ↗
▸DOB NOWPlot Diagram1
10/15/2026Q01467520-I1Open ↗