213 EAST 83RD STREET
MANHATTAN · BIN 1048696
💬 Discuss this project
1917Year Built
4Stories
M1Building Class
R8BZoning
7,444 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Church, synagogue, chapel · Owner of record: 213 Yorkville · 5,193 sf lot · 1.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTemporary engineered enclosed system86p · 5 filings · 16 docs
Bulkhead3p · 1 filing · 16 docs
Floor 776p · 1 filing · 16 docs
Floor 677p · 1 filing · 16 docs
Floor 576p · 1 filing · 16 docs
Floor 4213 Yorkville LLC87p · 4 filings · 16 docs
Floor 3213 Yorkville LLC87p · 5 filings · 16 docs
Floor 2213 Yorkville LLC87p · 4 filings · 16 docs
Floor 1213 Yorkville LLC87p · 5 filings · 16 docs
Cellar77p · 2 filings · 16 docs
Basement213 Yorkville LLC1p · 1 filing · 4 docs
Sub-Basement213 Yorkville LLC10p · 2 filings · 8 docs
Site & exteriorTemporary engineered enclosed system15p · 5 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
213 Yorkville3909/13/2026
GRGS3103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Yaker Engineering1208/05/2026
Paul Perdek, Prof. Engineering403/18/2026
Levin Engineering311/20/2025
Soni Engineering Consulting210/02/2025
Kindo111/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1003/21/2026
Project Factory NYC503/21/2026
Reliable Expediting503/21/2026
LBS Consulting Services203/21/2026
Levin Engineering603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold407/08/2026
Omni BuildGeneral Contractor408/05/2026
Perciballi IndustriesGeneral Contractor204/09/2026
Omni BuildScaffold207/08/2026
Shelby ElectricalElectrical103/22/2026
Prime Piping & HeatingPlumbing107/22/2026
Prime Piping & HeatingFire Protection107/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tecnico Special Inspectio5939808/05/2026
Yaker Engineering4892210/03/2024
Building Lifecycle
All (100)Filed (22)Permit Issued (8)Signed Off (6)Violation (3)Objection (31)Special Inspection (30)
08/21/2026
Special inspection requirement — Final
LEONID SEGAL
08/21/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
LEONID SEGAL
08/21/2026
Special inspection requirement — Subgrade Inspections
LEONID SEGAL
08/21/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
08/21/2026
Special inspection requirement — Concrete - Cast-In-Place
LEONID SEGAL
08/21/2026
Special inspection requirement — Post-installed Anchors
LEONID SEGAL
08/21/2026
Special inspection requirement — Footing and Foundation
LEONID SEGAL
08/05/2026
Filed — New Building
Support of excavation for proposed new residential 7 story building
M01104623-P3
08/05/2026
Filed — New Building
Support of excavation for proposed new residential 7 story building
M01104623-P4
07/10/2026
Filed — New Building
Support of excavation for proposed new residential 7 story building
M01104623-S7
07/07/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
07/07/2026
Special inspection requirement — Footing and Foundation
LEONID SEGAL
07/07/2026
Special inspection requirement — Final
LEONID SEGAL
07/07/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
LEONID SEGAL
07/07/2026
Special inspection requirement — Subgrade Inspections
LEONID SEGAL
07/07/2026
Special inspection requirement — Post-installed Anchors
LEONID SEGAL
07/07/2026
Special inspection requirement — Concrete - Cast-In-Place
LEONID SEGAL
05/26/2026
Signed off — Alteration
Partial demolition work in conjunction with full demolition work M01092559-I1
M01119685-I1
05/26/2026
Special inspection requirement — Final
LEONID SEGAL
05/26/2026
Special inspection requirement — Concrete - Cast-In-Place
LEONID SEGAL
05/26/2026
Special inspection requirement — Masonry
LEONID SEGAL
05/26/2026
Special inspection requirement — Post-installed Anchors
LEONID SEGAL
05/26/2026
Special inspection requirement — Structural Cold-Formed Steel
LEONID SEGAL
05/19/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSED SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01310024-I1
05/19/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01295200-I1
05/19/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01298497-I1
05/19/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01295737-I1
05/15/2026
Violation issued (ECB, closed)
Construction
05/12/2026
Signed off — Full Demolition
FULL DEMOLITION OF 4 STORY HOUSE OF WORSHIP BLDG
M01092559-I1
04/14/2026
Objection resolved — Addressed
03/18/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01298497-P2
12/21/2025
Objection raised — Other
12/19/2025
Objection resolved — Addressed
12/19/2025
Objection resolved — Addressed
12/15/2025
Objection resolved — Addressed
12/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01298497-P1
12/12/2025
Permit issued — Full Demolition
M01092559-I1-FD
12/12/2025
Objection raised — Other
12/12/2025
Objection raised — Other
12/12/2025
Objection raised — Other
11/26/2025
Filed — New Building
Support of excavation for proposed new residential 7 story building
M01104623-S2
11/20/2025
Filed — New Building
Support of excavation for proposed new residential 7 story building
M01104623-S5
11/19/2025
Filed — New Building
Support of excavation for proposed new residential 7 story building
M01104623-S6
11/19/2025
Filed — New Building
Support of excavation for proposed new residential 7 story building
M01104623-S4
11/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LEONID SEGAL
11/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LEONID SEGAL
11/13/2025
Special inspection requirement — Maintenance information
LEONID SEGAL
11/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
LEONID SEGAL
11/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
LEONID SEGAL
10/31/2025
Permit issued — Protection and Mechanical Methods
M01310024-I1-PMM
10/30/2025
Filed — Alteration
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSED SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01310024-I1
10/27/2025
Permit issued — Supported Scaffold
M01298497-I1-SF
10/27/2025
Permit issued — Sidewalk Shed
M01295737-I1-SH
10/27/2025
Permit issued — Protection and Mechanical Methods
M01295200-I1-PMM
10/24/2025
Objection resolved — Addressed
10/17/2025
Objection raised — Other
10/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01298497-I1
10/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01295200-I1
10/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01295737-I1
09/23/2025
Permit issued — Structural
M01119685-I1-ST
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offPerciballi Industries12/12/2025
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems10/31/2025
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems10/27/2025
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems10/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems10/27/2025
DOB NOWStructuralSigned-offPerciballi Industries09/23/2025
DOB NOWStructuralSigned-offOmni Build12/13/2024
DOB NOWConstruction FencePermit IssuedOmni Build10/28/2024
BISEQISSUEDRockledge Scaffold06/18/2012
BISEQISSUED1937 Contracting Co11/17/2011
BISEQISSUEDRockledge Scaffold07/05/2011
BISEQISSUEDColgate Scaffolding06/18/1992
2 projects · most recent 10/13/2025
FiledStatusContractorScope
10/13/2025CompleteSolas Electrical—
10/13/2025CompleteSolas Electrical—
1 project · most recent 10/03/2024
FiledStatusContractorScope
10/03/2024Signed-offPerciballi Industries1 scope_items
2 projects · most recent 03/18/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/18/2026Signed-offCore Scaffold SystemsScaffold
10/02/2025Signed-offCore Scaffold SystemsSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
08/21/2026FinalLEONID SEGALprogress
08/21/2026Subsurface Conditions – Fill Placement & In-Place DensityLEONID SEGALspecial
08/21/2026Subgrade InspectionsLEONID SEGALspecial
08/21/2026Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
08/21/2026Concrete - Cast-In-PlaceLEONID SEGALspecial
08/21/2026Post-installed AnchorsLEONID SEGALspecial
08/21/2026Footing and FoundationLEONID SEGALprogress
07/07/2026Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
07/07/2026Footing and FoundationLEONID SEGALprogress
07/07/2026FinalLEONID SEGALprogress
07/07/2026Subsurface Conditions – Fill Placement & In-Place DensityLEONID SEGALspecial
07/07/2026Subgrade InspectionsLEONID SEGALspecial
07/07/2026Post-installed AnchorsLEONID SEGALspecial
07/07/2026Concrete - Cast-In-PlaceLEONID SEGALspecial
05/26/2026FinalLEONID SEGALprogress
05/26/2026Concrete - Cast-In-PlaceLEONID SEGALspecial
05/26/2026MasonryLEONID SEGALspecial
05/26/2026Post-installed AnchorsLEONID SEGALspecial
05/26/2026Structural Cold-Formed SteelLEONID SEGALspecial
11/13/2025Fire-Resistant Penetrations and JointsLEONID SEGALspecial
11/13/2025HVAC-R and service water piping design and insulationLEONID SEGALenergy_progress
11/13/2025Maintenance informationLEONID SEGALenergy_progress
11/13/2025HVAC-R and service water heating system controlsLEONID SEGALenergy_progress
11/13/2025HVAC-R and service water heating equipmentLEONID SEGALenergy_progress
09/23/2025Excavations - Sheeting, Shoring, and BracingLEONID SEGALspecial
Latest 25 of 39.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/26/2026M01092559-P1Request digital key ↗
08/26/2026M01092559-I1Request digital key ↗
08/26/2026M01094192-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
06/20/2012120746880Open ↗
11/21/2011120859721Open ↗
07/08/2011120746880Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/24/2011120859721Open ↗
07/08/2011120746880Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M01104623-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026M01104623-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M01104623-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/26/2026M01092559-I1Open ↗
08/26/2026M01092559-P1Open ↗
08/21/2026M01310024-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026M01104623-S3Open ↗
08/31/2026M01104623-S1Open ↗
08/31/2026M01104623-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026M01104623-S1Open ↗
08/29/2026M01104623-S4Open ↗
08/29/2026M01104623-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/24/2011120859721Open ↗
07/08/2011120746880Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/24/2011120859721Open ↗
07/08/2011120746880Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/24/2011120859721Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026M01092559-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026M01092559-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026M01092559-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026M01092559-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026M01104623-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026M01092559-I1Open ↗
08/13/2026M01119685-I1Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
07/08/2011120746880Open ↗
▸DOB NOWRodent Control1
08/13/2026M01092559-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/20/2026M01104623-S7Open ↗
08/20/2026M01104623-P4Open ↗
08/13/2026M01104623-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/20/2026M01104623-S7Open ↗
08/15/2026M01104623-S1Open ↗
▸DOB NOWTR4: Test Report and Plot Diagram1
08/13/2026M01104623-S1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
10/24/2011120859721Open ↗
▸BISSHED LETTER1
06/20/2012120746880Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
10/24/2011120859721Open ↗
07/08/2011120746880Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification3
08/26/2026M01092559-I1Open ↗
08/26/2026M01092559-P1Open ↗
08/15/2026M01104623-I1Open ↗
▸DOB NOWStructure Photographs2
08/13/2026M01092559-I1Open ↗
08/13/2026M01092559-P1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026M01092559-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026M01104623-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M01104623-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M01104623-S3Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026M01092559-I1Open ↗
▸DOB NOWPro Cert Restriction Exception (LL158/17)1
08/13/2026M01106040-I1Open ↗