ECB02/24/2026GC # 625243///////BC 3303.4.1.1-FAILURE TO MAINTAIN PUBLIC AREA-AT THE TIME OF MY INSPECTION I OBSERVED BIG AMOUNT OF SNOW ON SIDEWALK IN FRONT OF CONSTRUCTION FENCE AT EXP#1-NOT CLEARED AS REQUIRED-MAKING IT$10K due
ECB01/20/2026AT THE TIME OF MY INSPECTION OF A PROPOSED 3-STORY BUILDING, NO ACTIVE CONSTRUCTION WORK WAS OBSERVED. THE CONSTRUCTION FENCE AT THE EXP1 WAS NOT MAINTAINED, WITH LOOSE PANELS CREATING A CONDITION THAT ALLOWED$5K due
DOB12/10/2024BGM ENGNRNG, EOR RQSTD MONTHLY OPTICAL MONITORING OF SITE & ADJOINING BLDGS @ END OF EMERGENCY WRK. REMEDY: RETAIN NYS SURVEYOR 2 PERFORM MONTHLY MONITORNG & SUBMT RPTS 2 DOB. SUBMIT UPDATED RPT BY 12/17/24 & @ 4 WKS THEREAFTER
DOB02/14/2024BGM ENGNRNG, EOR RQSTD MONTHLY OPTICAL MONITORING OF SITE &ADJ BLDGS @ END OF EMERGENCY WRK REMEDY: RETAIN NYS SURVEYOR TO PERFORM MONTHLY MONITORING & SUBMT RPTS TO DOB. 1ST RPT BY 2/19/24 & @ 4 WKS THEREAFTER
DOB11/21/2023PEER REVIEW OF ALL SOE/UNDERPINNING/SUBGRAGE IMPROVEMENT/PERMEANT.FDN SYSTEMS FILED UNDER ALL RELEVANT APPLICATIONS. REMEDY: COMPLY WITH PREVIOUS DOB ORDER. SUBMIT PEER REVIEW REPORT BY 12/21/23
DOB10/04/2023FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/14/2023DOB DIDN'T RECEIVE THE REQUESTED CONFORMANCE/ACCEPTANCE RPTS & AMENDED STABILIZATION DWGS FOR THE EMERGENCY WORK, (ORDER #062823FEU30501PN) REMEDY: SUBMIT SIA REPORTS, EOR ACCEPTANCE REPORT & AMENDED STABLZTN DWGS W/ EVIDENCE OF PERMIT BY 10/2/23
DOB08/07/2023EMERGENCY WORK.REAR HALF OF 211 ESSEX WAS UNDERMINED.211BLDG WAS LEANNG&RACKD W/INTERIOR CRCKS FRM CELLAR TO 2NDFL.EXP4WALL&FLOORJOISTS INADEQUATELY SUPPORTED.213 ESSEX STRCTRLLY COMPROMISED.IMMED COMPLY W/ THE COMMISSIONER'S ORDER 343052(062823FEU30501PN)TO STBILIZE&WTHRPRF THE 211 ESSEX ST BLDG
DOB06/28/2023EMERGENCY WORK.REAR HALF OF 211 ESSEX WAS UNDERMINED.211BLDG WAS LEANNG&RACKD W/INTERIOR CRCKD FRM CELLAR TO 2NDFL.EXP4WALL&FLOOR JOISTS INADEQUATELY SUPPORTED.213ESSEX STRCTRLLY COMPROMISED.OWNR TO RTAIN NYS PE&LIC'D GC TO IMMED 1.INSTALL TEMP SHORNG/BRACNG@THE211 ESSEX,EXP4 WALL&FDN TO STBILIZE TO 211BLDG
DOB01/27/2023V-DOB VIOLATION - ACTIVE
DOB01/04/2023V-DOB VIOLATION - ACTIVE
DOB09/07/2022V-DOB VIOLATION - ACTIVE
DOB04/13/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/03/2022V-DOB VIOLATION - ACTIVE
ECB04/16/2025FAILURE TO COMOLY WITH THE COMMISSIONER'S ORDER CONTAINED IN VIOLATION#121024CE30501PW(CONTROL #358997) ISSUED ON 12/10/24 WHICH MANDATED THE RESPONDENT TO SUBMIT THE UPDATED OPTICAL MONITORING REPORTS AND ASSONothing owed — awaiting certificate of correction
ECB08/23/2023AT TIME OF INSPECTION OF A SITE UNDER AN EMERGENCY DECLARATION TO WORK EVERYDAY AND BRACE AND SHORE THE ADJACENT WALL OF BUILDING THAT WAS IMPACTED BY CONSTRUCTION OPERATIONS; I OBSERVED THAT THE SITE WAS CLOSEHearing held — result not yet published$12K proposed
ECB02/16/2023AT TIME OF INSPECTION, SITE IS CLOSED AND INACTIVE. UPON RESEARCH ON BIS, IT APPEARS THAT THE RESPONDENT FAILED TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OFNothing owed — awaiting certificate of correction
ECB12/06/2022BC3304.2 DEFICIENT SDE DRAWINGS-RESPONENT REGISTERD DESIGN PROFESSIONAL FAIED TO MEET MIN REQUIREMENTS SET FORTH IN BC3304.2 BC3304.2 STATES THAT SUPPORT OF EXCAVATION (SDE) DRAWINGS SHALL BE SITE SPECIFIC & SHNothing owed — awaiting certificate of correction
ECB01/10/2022FOR CONSTRUCTION SURVEY.NOTE:AT THE TIME MY INSPECTION AT A 3 STORY BUILDING EXCAVATION LEVEL UNDER CONSTRUCTION.I OBSERVED EXCAVATION DEEP MORE THEN 10 FEET WITH WORKERS WORKING INSIDE THE EXCAVATION POURED CONothing owed — awaiting certificate of correction