← Back
Elevator apt, semi-fireproof with stores
2130 ADAM C POWELL BLVD
MANHATTAN · Harlem (North) · BIN 1087804
💬 Discuss this project
2007Year Built
7Stories
D7Building Class
R7-2Zoning
72,957 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized5 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: COMMONWEALTH LOCAL DEVELOPMENT CORP. · 11,791 sf lot · 6.19 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 2 filings · 19 docs
Floor 11p · 1 filing · 2 docs
Cellar2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CEPRINE CONSTRUCTION407/08/2026
GREYSTAR507/08/2026
HUBB NYC PROPERTIES804/09/2026
COMMONWEALTH LOCAL DEVELOPMENT CORP.103/22/2026
KNICKERBOCKER CONSTR 11 L103/22/2026
K 2 CONSTRUCTION203/22/2026
COMMON WEALTH HOLDING COM103/22/2026
2130 ACP BLVD INVESTORS1103/21/2026
COLGATE ENTERPRISE203/21/2026
COGSWELL REALTY GROUP203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/26/2015$2.9M—HARLEM COMMONWEALTH COUNCIL, INC. → COMMONWEALTH LOCAL DEVELOPMENT CORP.$39/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIMKUS NEW YORK PLLC101/14/2026
NEW YORK DESIGN ARCHITECTS, LLP212/06/2023
KZ ENGINEERING, P.C104/28/2022
FSI ARCHITECTURE PC204/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIMKUS NEW YORK PLLC203/21/2026
NEW YORK DESIGN ARCHITECT LLP403/21/2026
EAST COAST EXPEDITING103/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRIAN MONTGOMERYElectrical103/21/2026
GREGORY PAPANTONIOUElectrical103/21/2026
CEPRINE CONSTRUCTION INCGeneral Contractor107/08/2026
HENRY RESTORATION LTDGeneral Contractor107/08/2026
NYC BUILDING SOLUTIONS COGeneral Contractor104/09/2026
RGA MECHANICAL CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIMKUS NEW YORK, PLLC8123101/14/2026
AKS ARCHITECTURAL & ENGIN1957112/06/2023
FSI ARCHITECTURE, PC354204/08/2022
Building Lifecycle
All (91)Filed (6)Permit Issued (4)Signed Off (4)Facade (FISP) (10)Violation (48)Special Inspection (19)
06/08/2026
Violation issued (HPD, open)
A
05/08/2026
Signed off — Alteration
Reconstruction repairs in existing accessory parking garage as necessary including walls, floors & ceiling and per plans filed. No change in use, occupancy or egress proposed under this application.
M01329605-I1
05/08/2026
Violation issued (HPD, open)
A
02/10/2026
Permit issued — General Construction
M01329605-I1-GC
01/31/2026
Violation issued (HPD, closed)
C
01/31/2026
Violation issued (HPD, closed)
C
01/31/2026
Violation issued (HPD, closed)
C
01/14/2026
Filed — Alteration
Reconstruction repairs in existing accessory parking garage as necessary including walls, floors & ceiling and per plans filed. No change in use, occupancy or egress proposed under this application.
M01329605-I1
12/05/2025
Special inspection requirement — Masonry
WILLIAM DAVIS
12/05/2025
Special inspection requirement — Sprayed fire-resistant materials
WILLIAM DAVIS
12/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM DAVIS
12/05/2025
Special inspection requirement — Final
WILLIAM DAVIS
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DAVIS
11/17/2025
Violation issued (HPD, closed)
I
09/04/2025
Violation issued (HPD, open)
B
09/04/2025
Violation issued (HPD, open)
B
11/22/2024
Violation issued (HPD, closed)
I
04/17/2024
Violation issued (HPD, closed)
A
12/06/2023
Filed — Alteration
Propose exterior and interior renovation for the removal of an existing residential revolving door. Area of work to include new vestibule with new exterior and interior floor, ceiling, & wall finishes all as per plans filed herewith. No change in use, or
M00970236-I1
12/06/2023
Filed — Alteration
APPLICATION IS FILED FOR A TEMPORARY FENCE
M00970048-I1
11/15/2023
Violation issued (HPD, closed)
I
05/31/2023
Cycle 9 facade report submitted
05/31/2023
Cycle 9 facade report signed — SAFE
04/27/2023
Cycle 9 facade inspection completed
02/24/2023
Signed off — Alteration
M00603283-I1
11/08/2022
Signed off — Alteration
M00726904-I1
10/25/2022
Cycle 9 facade report submitted
10/18/2022
Signed off — Alteration
Rooftop unit replacement. No change in occupancy, use or egress.
M00489415-I1
08/30/2022
Cycle 9 facade inspection completed
05/26/2022
Permit issued — General Construction
M00603283-I1-GC
05/03/2022
Permit issued — Sidewalk Shed
M00726904-I1-SH
04/28/2022
Filed — Alteration
M00726904-I1
04/08/2022
Filed — Alteration
M00603283-I1
10/27/2021
Permit issued — Mechanical Systems
M00489415-I1-MS
09/30/2021
Special inspection requirement — Energy Code Compliance Inspections
James Cicalo
09/30/2021
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
James Cicalo
09/30/2021
Special inspection requirement — Masonry
James Cicalo
09/30/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Cicalo
09/30/2021
Special inspection requirement — Final
James Cicalo
05/14/2021
Filed — Alteration
Rooftop unit replacement. No change in occupancy, use or egress.
M00489415-I1
04/07/2021
Special inspection requirement — Energy Code Compliance Inspections
James Cicalo
03/19/2021
Special inspection requirement — Final
James Cicalo
03/19/2021
Special inspection requirement — Electrical motors and elevators
James Cicalo
03/19/2021
Special inspection requirement — HVAC-R and service water heating equipment
James Cicalo
03/19/2021
Special inspection requirement — Duct leakage testing, insulation and design
James Cicalo
03/19/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
James Cicalo
03/19/2021
Special inspection requirement — HVAC-R and service water heating system controls
James Cicalo
03/19/2021
Special inspection requirement — Mechanical Systems
James Cicalo
03/19/2021
Special inspection requirement — Maintenance information
James Cicalo
10/04/2020
Cycle 9 facade report signed — SWARMP
09/30/2020
Cycle 9 facade report submitted
09/03/2020
Cycle 9 facade inspection completed
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/20/2019
Cycle 8 facade report submitted
01/19/2019
Cycle 8 facade inspection completed
11/19/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/19/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNYC BUILDING SOLUTIONS CO02/10/2026
DOB NOWGeneral ConstructionSigned-offHENRY RESTORATION LTD05/26/2022
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC05/03/2022
DOB NOWMechanical SystemsSigned-offRGA MECHANICAL CORP10/27/2021
BISMHISSUEDD & T RESTORATION INC03/21/2019
BISOTISSUEDD & T RESTORATION INC03/21/2019
BISSPISSUEDUNIVERSAL FIRE SPR LLC08/27/2018
BISPLISSUEDCOCHRANE PLBG & HTG08/08/2018
BISOTISSUEDD & T RESTORATION INC06/27/2018
BISMHISSUEDD & T RESTORATION INC06/27/2018
BISPLISSUEDADVANTAGE PLBG & MECH.COR01/04/2017
BISBLISSUEDWAWEL PLBG AND HTG CORP08/12/2015
BISOTISSUEDEVCO MECHANICAL CORP04/08/2015
BISPLISSUEDWAWEL PLBG AND HTG CORP04/08/2015
BISPLISSUEDPETER PLUMBING ASSOC. INC.07/16/2014
BISOTISSUEDDADA 10 INC06/06/2014
BISEQISSUEDCOLGATE ENTERPRISE CORP10/25/2012
BISOTISSUEDBERN COMPANIES INC08/01/2012
BISOTISSUEDUNITED RESTORATION & DEV06/08/2011
BISEQISSUEDROCK SCAFFOLDING CORP05/09/2011
BISEQISSUEDKNICKERBOCKER CONST II LL12/22/2008
BISSDISSUEDRO-SAL PLBG HTG INC09/19/2008
BISPLISSUEDRO-SAL PLUMBING & HTG INC INC.08/25/2008
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIP.CORP04/24/2008
BISOTISSUEDKNICKBOCKER CONSTRUCTION 11 LLC04/22/2008
BISMHISSUEDKNICKERBOCKER CONSTRUCTION 11 LL04/22/2008
BIS—ISSUEDKNICKERBOCKER CONSTRUCTION II LL04/22/2008
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIP.CORP03/28/2008
BISEQISSUEDWALISON CORP01/18/2008
BIS—ISSUEDKNICKERBOCKER CONSTRUCTION II LL12/21/2007
BISEQISSUEDKNICKERBOCKER CONSTRUCTION II LL12/21/2007
BISOTISSUEDEURO EXCAVATION12/20/2007
BISBLISSUEDRO-SAL PLUMBING & HTG INC INC.08/27/2007
BISPLISSUEDRO-SAL PLUMBING & HTG INC INC.08/27/2007
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIP.CORP08/24/2007
BISEQISSUEDKNICKERBOCKER CONSTRUCTION II LL05/23/2007
3 projects · most recent 05/02/2022
General Wiring
FiledStatusContractorScope
05/02/2022CompleteBOROWIDE ELECT'L CONTR'S—
04/27/2022CompleteMONTGOMERY ELEC'L CONTR'GGeneral Wiring
04/09/2019CompleteMARTINEZ ELECTRICAL CONTGeneral Wiring
1 project · most recent 12/06/2023
Fence
FiledStatusContractorScope
12/06/2023——Fence
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
12/05/2025MasonryWILLIAM DAVISspecial
12/05/2025Sprayed fire-resistant materialsWILLIAM DAVISspecial
12/05/2025Tenant Protection Plan ComplianceWILLIAM DAVISspecial
12/05/2025FinalWILLIAM DAVISprogress
12/05/2025Fire-Resistant Penetrations and JointsWILLIAM DAVISspecial
09/30/2021Energy Code Compliance InspectionsJames Cicaloprogress
09/30/2021Exterior Insulation and Finish Systems (EIFS)James Cicalospecial
09/30/2021MasonryJames Cicalospecial
09/30/2021Structural Stability – Alterations of existing buildingsJames Cicalospecial
09/30/2021FinalJames Cicaloprogress
04/07/2021Energy Code Compliance InspectionsJames Cicaloprogress
03/19/2021FinalJames Cicaloprogress
03/19/2021Electrical motors and elevatorsJames Cicaloenergy_progress
03/19/2021HVAC-R and service water heating equipmentJames Cicaloenergy_progress
03/19/2021Duct leakage testing, insulation and designJames Cicaloenergy_progress
03/19/2021HVAC-R and service water piping design and insulationJames Cicaloenergy_progress
03/19/2021HVAC-R and service water heating system controlsJames Cicaloenergy_progress
03/19/2021Mechanical SystemsJames Cicalospecial
03/19/2021Maintenance informationJames Cicaloenergy_progress
▾Documents — 223 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00489415-I1Request digital key ↗
09/02/2026M00603283-I1Request digital key ↗
09/02/2026M00726904-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION30
09/17/2019123579537Open ↗
06/13/2019123579537Open ↗
03/15/2019123579537Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION19
03/22/2019123579537Open ↗
03/22/2019123579537Open ↗
08/28/2018123419014Open ↗
Showing 3 of 19 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/21/2015122024193Open ↗
▸Seals & Professional Certifications72
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
06/27/2018123579537Open ↗
06/27/2018123579537Open ↗
06/22/2018123579537Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
06/25/2018123579537Open ↗
06/19/2018123419014Open ↗
12/19/2016122968217Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/26/2026M00489415-I1Open ↗
08/26/2026M00489415-I1Open ↗
08/26/2026M00489415-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
11/05/2012121411551Open ↗
11/05/2012121411551Open ↗
11/05/2012121411551Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/22/2018123579537Open ↗
06/22/2018123579537Open ↗
06/19/2018123419014Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00603283-I1Open ↗
08/28/2026M00970048-I1Open ↗
08/28/2026M00970236-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/26/2026M00489415-I1Open ↗
08/23/2026M01329605-I1Open ↗
08/23/2026M00603283-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPC FULL REPORT2
01/16/2008110074687Open ↗
12/14/2007110064634Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/07/2015140328679Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/07/2015140328679Open ↗
▸Trade Schedules & Equipment24
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
06/13/2019123579537Open ↗
03/15/2019123579537Open ↗
03/13/2019123579537Open ↗
Showing 3 of 17 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
09/15/2015140328679Open ↗
04/27/2015122024193Open ↗
08/20/2014122024193Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/07/2015140328679Open ↗
▸BISSCHEDULE B - PLUMBING1
04/07/2015140328679Open ↗
▸BISEQUIPMENT USE PERMITS1
05/14/2015122024193Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/21/2015122024193Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
06/22/2018123579537Open ↗
06/19/2018123419014Open ↗
12/19/2016122968217Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
06/03/2014122024193Open ↗
07/31/2012121162142Open ↗
05/11/2011120682822Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
06/22/2018123579537Open ↗
06/19/2018123419014Open ↗
06/14/2018123577977Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
06/03/2014122024193Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
06/27/2018123579537Open ↗
06/22/2018123579537Open ↗
12/19/2016122968217Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/07/2015140328679Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/21/2015122024193Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/07/2015140328679Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00489415-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/07/2015140328679Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS7
11/05/2012121411551Open ↗
07/31/2012121162142Open ↗
05/11/2011120682822Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/21/2015122024193Open ↗
07/01/2009110074687Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
06/22/2018123579537Open ↗
06/22/2018123579537Open ↗
06/19/2018123419014Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms21
▸BISEFILING COVER SHEET11
06/22/2018123579537Open ↗
06/22/2018123579537Open ↗
06/19/2018123419014Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION5
06/14/2017122968217Open ↗
11/19/2015140328679Open ↗
07/24/2015140328679Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
06/13/2019123579537Open ↗
02/11/2019123579537Open ↗
08/28/2018123419014Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/07/2015140328679Open ↗