← Back
Single or multiple dwelling with stores or offices
2131 2 AVENUE
MANHATTAN · BIN 1052441
💬 Discuss this project
1900Year Built
4Stories
S9Building Class
R9AZoning
5,600 sfGross Floor Area
8Units
Rent Stabilized5 Open Violations 1 unresolved · 4 paperwork only ▸
Single or multiple dwelling with stores or offices · 1,965 sf lot · 2.85 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction43p · 1 filing · 20 docs
CellarUnder Construction45p · 1 filing · 20 docs
Sub-BasementUnder Construction43p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOGON REALTY1108/06/2026
TOGAN REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KIERAN PATRICK SPILLANE412/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.A.C. INDUSTRIES, INCGeneral Contractor208/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106312/09/2025
Building Lifecycle
All (52)Filed (4)Permit Issued (2)Violation (16)Objection (6)Special Inspection (24)
08/05/2026
Permit issued — Foundation
M00908759-I1-FO
07/14/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
07/14/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
GEORGE GHEBRYAL
07/14/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
07/14/2026
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
07/14/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
07/14/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
07/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
07/14/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
07/14/2026
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
07/14/2026
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
07/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
07/14/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
07/01/2026
Objection resolved — Addressed
05/27/2026
Objection raised — Other
05/07/2026
Permit issued — Structural
M00908759-S1-GC-CX
12/22/2025
Violation issued (HPD, closed)
C
12/09/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault removal. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder.
M00908759-P1
12/09/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault removal. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder.
M00908759-P2
10/24/2025
Violation issued (HPD, closed)
C
09/15/2025
Special inspection requirement — Deep Foundation Elements
09/15/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
09/15/2025
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
01/02/2024
Objection resolved — Addressed
01/02/2024
Objection resolved — Addressed
12/29/2023
Violation issued (ECB, open)
Construction
12/29/2023
Violation issued (ECB, open)
Construction
12/29/2023
Violation issued (ECB, open)
Construction
12/29/2023
Violation issued (ECB, open)
Construction
11/15/2023
Violation issued (HPD, closed)
I
09/27/2023
Objection raised — Scope
09/27/2023
Objection raised — Scope
09/22/2023
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault removal. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder.
M00908759-I1
09/22/2023
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault removal. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder.
M00908759-S1
11/02/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
I
10/25/2019
Violation issued (HPD, closed)
I
10/05/2018
Violation issued (HPD, closed)
I
01/27/2014
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedC.A.C. INDUSTRIES, INC08/05/2026
DOB NOWStructuralPermit IssuedC.A.C. INDUSTRIES, INC05/07/2026
BISSPISSUEDEXPERT FIRE SPRINKLER,LLC04/22/2009
BISPLISSUEDCAPE PLUMBING INC12/24/2007
BIS—ISSUEDR & L GENERAL CONTRACTING CORP03/12/2007
BISPLISSUEDS & L PLUMBING INC03/21/1991
BIS—ISSUEDCHAN KIN SHING CONSTRUCTION CORP02/11/1991
1 project · most recent 12/09/2025
Steel Concrete
FiledStatusContractorScope
12/09/2025Permit IssuedC.A.C. INDUSTRIES, INCSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
07/14/2026FinalGEORGE GHEBRYALprogress
07/14/2026Underpinning and alternate methods of support of buildings and adjacent propertyGEORGE GHEBRYALspecial
07/14/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
07/14/2026Structural Steel - WeldingGEORGE GHEBRYALspecial
07/14/2026Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
07/14/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
07/14/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
07/14/2026Subgrade InspectionsGEORGE GHEBRYALspecial
07/14/2026Deep Foundation ElementsGEORGE GHEBRYALspecial
07/14/2026Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
07/14/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
07/14/2026Footing and FoundationGEORGE GHEBRYALprogress
09/15/2025Deep Foundation Elements—special
09/15/2025Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
09/15/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
09/15/2025Structural Steel - DetailsGEORGE GHEBRYALspecial
09/15/2025Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
09/15/2025Structural Steel - WeldingGEORGE GHEBRYALspecial
09/15/2025Subgrade InspectionsGEORGE GHEBRYALspecial
09/15/2025Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
09/15/2025Underpinning and alternate methods of support of buildings and adjacent propertyGEORGE GHEBRYALspecial
09/15/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
09/15/2025FinalGEORGE GHEBRYALprogress
09/15/2025Footing and FoundationGEORGE GHEBRYALprogress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026M00908759-S1Request digital key ↗
08/29/2026M00908759-P2Request digital key ↗
08/15/2026M00908759-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
03/13/2009110468066Open ↗
04/25/2008110014966Open ↗
04/23/2008110014966Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
04/22/2009110468066Open ↗
12/24/2007110014966Open ↗
▸Seals & Professional Certifications13
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
07/30/2009110468066Open ↗
05/05/2009110014966Open ↗
03/13/2009110468066Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026M00908759-S1Open ↗
08/29/2026M00908759-I1Open ↗
08/29/2026M00908759-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00908759-I1Open ↗
09/01/2026M00908759-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/21/2007110014966Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/21/2007110014966Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026M00908759-I1Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE4
07/10/2009110468066Open ↗
07/02/2009110468066Open ↗
09/17/2008110014966Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
04/22/2009110468066Open ↗
04/25/2008110014966Open ↗
04/23/2008110014966Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/05/2009110014966Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026M00908759-S1Open ↗
08/29/2026M00908759-P2Open ↗
08/15/2026M00908759-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/21/2007110014966Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026M00908759-P1Open ↗
08/13/2026M00908759-I1Open ↗
▸BISHYDRO FLOW TEST LETTER1
04/22/2009110468066Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
12/21/2007110014966Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/30/2009110468066Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/05/2009110014966Open ↗
04/22/2009110468066Open ↗
12/24/2007110014966Open ↗
▸Other Documents8
▸DOB NOWGeotechnical Peer Review Report (BC 1818)4
08/13/2026M00908759-P1Open ↗
08/13/2026M00908759-S1Open ↗
08/13/2026M00908759-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)4
08/13/2026M00908759-S1Open ↗
08/13/2026M00908759-P1Open ↗
08/13/2026M00908759-P2Open ↗
Showing 3 of 4 on file for this type