Rent Stabilized2 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 2131 HOLDINGS LLC · 2,000 sf lot · 2.1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction10p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BERKOWITS REALTY1708/26/2026
THEGARDENBOND1007/08/2026
INFINITY COLLECTIVE903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/01/2021$2.3M—— → —$548/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TREND NEW YORK ARCHITECTURE D.P.C.402/19/2026
CAMERON ENGINEERING403/30/2023
AZSK ARCHITECTS PC308/04/2022
HC ARCHITECT, PC103/24/2022
M.ARCH ARCHITECTS202/16/2022
BGM ENGINEERING107/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JP EXPEDITE203/21/2026
A1 EXPEDITING SERVICE CORP.1203/21/2026
SUNSHINE PLAZA LLC403/21/2026
BUILDINGS REPRISENTATIVE LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BERKOWITS REALTY LLCGeneral Contractor708/26/2026
DARREN CONSTRUCTION INDUSGeneral Contractor603/21/2026
JSB WORKS INCGeneral Contractor207/08/2026
TRI CAM ELECL VENTURES LLElectrical103/22/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
COPPER PLUMBING INCPlumbing107/08/2026
SIGNS CADScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394302/19/2026
HRF SERVICES CORP5616102/05/2026
MARCH CHADWICK, ARCHITECT2253403/30/2023
BGM ENGINEERING, LLC1514408/04/2022
Building Lifecycle
All (150)Filed (15)Permit Issued (10)Signed Off (7)Violation (60)Inspection (3)Objection (25)Special Inspection (30)
08/25/2026
Permit issued — General Construction
B01351879-I1-GC
08/18/2026
Objection raised — Other
08/10/2026
Objection resolved — Resolved
06/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
04/13/2026
Objection resolved — Addressed
04/10/2026
Objection raised — Fire_Protection
04/10/2026
Objection raised — Other
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/12/2026
Objection raised — Admin
03/12/2026
Objection raised — Admin
03/12/2026
Objection raised — Fire_Protection
03/12/2026
Objection raised — Fire_Protection
02/19/2026
Filed — Alteration CO
Sprinkler work in conjunction to the ALT-CO application B01351879-I1.
B01351879-S2
02/19/2026
Filed — Alteration CO
Sprinkler work in conjunction to the ALT-CO application B01351879-I1.
B01351879-S4
02/19/2026
Filed — Alteration CO
Sprinkler work in conjunction to the ALT-CO application B01351879-I1.
B01351879-S3
02/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
Paul Raymond
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
02/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
Paul Raymond
02/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
02/19/2026
Special inspection requirement — Post-installed Anchors
Paul Raymond
02/19/2026
Special inspection requirement — Shutoff dampers
Paul Raymond
02/19/2026
Special inspection requirement — Maintenance information
Paul Raymond
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
02/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
02/18/2026
Special inspection requirement — Sprinkler Systems
Paul Raymond
02/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
02/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
02/18/2026
Special inspection requirement — Mechanical Systems
Paul Raymond
02/18/2026
Special inspection requirement — Final
Paul Raymond
02/05/2026
Filed — Alteration CO
Sprinkler work in conjunction to the ALT-CO application B01351879-I1.
B01351879-I1
01/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
01/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
01/28/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
01/28/2026
Special inspection requirement — Lighting controls
Paul Raymond
01/28/2026
Special inspection requirement — Interior lighting power
Paul Raymond
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2023
Signed off — Alteration
Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
B00499906-I1
05/03/2023
Signed off — Alteration
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B00499900-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/30/2023
Filed — Alteration
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
B00499900-P1
03/30/2023
Filed — Alteration
Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
B00499906-P1
03/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MARCH CHADWICK
03/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
MARCH CHADWICK
03/30/2023
Special inspection requirement — Final
MARCH CHADWICK
03/30/2023
Special inspection requirement — Energy Code Compliance Inspections
MARCH CHADWICK
03/30/2023
Special inspection requirement — Mechanical Systems
MARCH CHADWICK
03/30/2023
Special inspection requirement — Maintenance information
MARCH CHADWICK
03/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
MARCH CHADWICK
03/01/2023
Special inspection requirement — Final
MARCH CHADWICK
03/01/2023
Special inspection requirement — Energy Code Compliance Inspections
MARCH CHADWICK
03/01/2023
Special inspection requirement — Mechanical Systems
MARCH CHADWICK
08/29/2022
Signed off — Alteration
Plumbing work type filed in conjunction with Alt 2 application #B00564815
B00569162-I1
08/16/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/11/2022
Signed off — Alteration
B00564815-I1
08/04/2022
Filed — Alteration
Plumbing work type filed in conjunction with Alt 2 application #B00564815
B00569162-P1
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBERKOWITS REALTY LLC08/25/2026
DOB NOWGeneral ConstructionSigned-offBERKOWITS REALTY LLC04/01/2022
DOB NOWStructuralSigned-offBERKOWITS REALTY LLC04/01/2022
DOB NOWSignSigned-offSIGNS CAD CORP03/25/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING08/24/2021
DOB NOWGeneral ConstructionSigned-offJSB WORKS INC08/23/2021
DOB NOWStructuralSigned-offJSB WORKS INC08/05/2021
DOB NOWGeneral ConstructionSigned-offDARREN CONSTRUCTION INDUS04/23/2021
DOB NOWMechanical SystemsSigned-offDARREN CONSTRUCTION INDUS04/20/2021
DOB NOWPlumbingSigned-offCOPPER MECHANICAL INC04/16/2021
BISMHISSUEDROLEX CONSTRUCTION LLC05/29/2007
1 project · most recent 02/19/2026
Sprinkler System
FiledStatusContractorScope
02/19/2026——Sprinkler System
1 project · most recent 02/19/2026
FiledStatusContractorScope
02/19/2026———
3 projects · most recent 06/22/2021
General Wiring
FiledStatusContractorScope
06/22/2021CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
04/19/2021Permit IssuedTRI CAM ELECL VENTURES LLGeneral Wiring
02/22/2021Permit IssuedDMMP ELECTRIC CONSTR. INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/16/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
06/30/2026Energy Code Compliance InspectionsPaul Raymondprogress
02/19/2026Tenant Protection Plan CompliancePaul Raymondspecial
02/19/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
02/19/2026Tenant Protection Plan CompliancePaul Raymondspecial
02/19/2026Energy Code Compliance InspectionsPaul Raymondprogress
02/19/2026Post-installed AnchorsPaul Raymondspecial
02/19/2026Shutoff dampersPaul Raymondenergy_progress
02/19/2026Maintenance informationPaul Raymondenergy_progress
02/19/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
02/18/2026HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
02/18/2026Sprinkler SystemsPaul Raymondspecial
02/18/2026HVAC-R and service water heating system controlsPaul Raymondenergy_progress
02/18/2026HVAC-R and service water heating equipmentPaul Raymondenergy_progress
02/18/2026Mechanical SystemsPaul Raymondspecial
02/18/2026FinalPaul Raymondprogress
01/28/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
01/28/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
01/28/2026Lighting in dwelling unitsPaul Raymondenergy_progress
01/28/2026Lighting controlsPaul Raymondenergy_progress
01/28/2026Interior lighting powerPaul Raymondenergy_progress
03/30/2023HVAC-R and service water piping design and insulationMARCH CHADWICKenergy_progress
03/30/2023HVAC-R and service water heating equipmentMARCH CHADWICKenergy_progress
03/30/2023FinalMARCH CHADWICKprogress
03/30/2023Energy Code Compliance InspectionsMARCH CHADWICKprogress
03/30/2023Mechanical SystemsMARCH CHADWICKspecial
Latest 25 of 54.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Optimum Store Service and Experience CenterRetailFloor 1
Project B00499906 Alteration · LOC Issued · 04/15/2021
alticeRetailFloor 1
Project B00499894 Alteration · LOC Issued · 04/14/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/01/2026B00499894-I1Request digital key ↗
09/01/2026B00499894-P1Request digital key ↗
09/01/2026B00499906-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/18/2026B01351879-I1Open ↗
▸Seals & Professional Certifications53
▸DOB NOWProgress Inspector Seal & Signature28
09/27/2026B01351879-I1Open ↗
09/27/2026B01351879-I1Open ↗
09/25/2026B00564815-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00499894-I1Open ↗
09/01/2026B00499894-P1Open ↗
09/01/2026B00499906-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/27/2026B01351879-I1Open ↗
09/25/2026B00564815-I1Open ↗
09/05/2026B00552899-I1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/18/2026B01351879-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00499894-P1Open ↗
09/01/2026B00499894-I1Open ↗
09/01/2026B00499906-P1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00499900-I1Open ↗
08/13/2026B00499894-I1Open ↗
08/13/2026B00564815-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/18/2026B01351879-I1Open ↗