← Back
Single or multiple dwelling with stores or offices
2133 2 AVENUE
MANHATTAN · BIN 1052442
💬 Discuss this project
1900Year Built
4Stories
S9Building Class
R9AZoning
5,616 sfGross Floor Area
8Units
Rent Stabilized4 Open Violations ▸
Single or multiple dwelling with stores or offices · Owner of record: TOGON REALTY CORP. · 1,971 sf lot · 2.85 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction13p · 1 filing · 20 docs
CellarUnder Construction53p · 1 filing · 20 docs
Sub-BasementUnder Construction3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOGON REALTY808/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KIERAN PATRICK SPILLANE403/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.A.C. INDUSTRIES, INCGeneral Contractor208/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106303/23/2026
Building Lifecycle
All (53)Filed (4)Permit Issued (2)Violation (13)Objection (4)Special Inspection (30)
08/21/2026
Permit issued — Foundation
M00908750-I1-FO
05/13/2026
Permit issued — General Construction
M00908750-S1-GC-CX
04/20/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
04/20/2026
Special inspection requirement — Demolition
GEORGE GHEBRYAL
03/23/2026
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & building strengthening/protection. Replacement of existing entrance with new reinforced concrete walls, steel post, and slab for new cellar hatch with vertical ladder.
M00908750-P3
01/26/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
01/26/2026
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
01/26/2026
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
01/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
KIERAN SPILLANE
01/26/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
GEORGE GHEBRYAL
01/26/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
01/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
01/26/2026
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
01/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
01/26/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
01/26/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
01/26/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
01/26/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
12/18/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & building strengthening/protection. Replacement of existing entrance with new reinforced concrete walls, steel post, and slab for new cellar hatch with vertical ladder.
M00908750-P1
12/09/2025
Special inspection requirement — Demolition
GEORGE GHEBRYAL
12/09/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
12/09/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
12/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
12/09/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
12/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
12/09/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
01/03/2024
Objection resolved — Addressed
01/02/2024
Objection resolved — Addressed
11/15/2023
Violation issued (HPD, closed)
I
09/29/2023
Objection raised — Scope
09/29/2023
Objection raised — Scope
09/19/2023
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & building strengthening/protection. Replacement of existing entrance with new reinforced concrete walls, steel post, and slab for new cellar hatch with vertical ladder.
M00908750-I1
09/19/2023
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & building strengthening/protection. Replacement of existing entrance with new reinforced concrete walls, steel post, and slab for new cellar hatch with vertical ladder.
M00908750-S1
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
I
10/25/2019
Violation issued (HPD, closed)
I
10/05/2018
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/27/2014
Violation issued (HPD, closed)
B
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedC.A.C. INDUSTRIES, INC08/21/2026
DOB NOWGeneral ConstructionPermit IssuedC.A.C. INDUSTRIES, INC05/13/2026
1 project · most recent 03/23/2026
Steel Concrete
FiledStatusContractorScope
03/23/2026Permit IssuedC.A.C. INDUSTRIES, INCSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
04/20/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
04/20/2026FinalGEORGE GHEBRYALprogress
04/20/2026Footing and FoundationGEORGE GHEBRYALprogress
04/20/2026Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
04/20/2026Post-installed AnchorsGEORGE GHEBRYALspecial
04/20/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
04/20/2026MasonryGEORGE GHEBRYALspecial
04/20/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
04/20/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
04/20/2026DemolitionGEORGE GHEBRYALspecial
01/26/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
01/26/2026Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
01/26/2026Deep Foundation ElementsGEORGE GHEBRYALspecial
01/26/2026Subsurface Investigations (Borings/Test Pits)KIERAN SPILLANEspecial
01/26/2026Underpinning and alternate methods of support of buildings and adjacent propertyGEORGE GHEBRYALspecial
01/26/2026Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
01/26/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
01/26/2026Structural Steel - WeldingGEORGE GHEBRYALspecial
01/26/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
01/26/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
01/26/2026Subgrade InspectionsGEORGE GHEBRYALspecial
01/26/2026FinalGEORGE GHEBRYALprogress
01/26/2026Footing and FoundationGEORGE GHEBRYALprogress
12/09/2025DemolitionGEORGE GHEBRYALspecial
12/09/2025FinalGEORGE GHEBRYALprogress
Latest 25 of 46.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026M00908750-I1Request digital key ↗
08/29/2026M00908750-P3Request digital key ↗
08/29/2026M00908750-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026M00908750-P1Open ↗
08/29/2026M00908750-I1Open ↗
08/29/2026M00908750-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026M00908750-S1Open ↗
08/25/2026M00908750-I1Open ↗
08/25/2026M00908750-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026M00908750-S1Open ↗
08/25/2026M00908750-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026M00908750-P1Open ↗
08/29/2026M00908750-S1Open ↗
08/29/2026M00908750-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026M00908750-I1Open ↗
08/13/2026M00908750-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/29/2026M00908750-I1Open ↗
▸Other Documents8
▸DOB NOWGeotechnical Peer Review Report (BC 1818)4
08/13/2026M00908750-P1Open ↗
08/13/2026M00908750-I1Open ↗
08/13/2026M00908750-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)4
08/13/2026M00908750-P3Open ↗
08/13/2026M00908750-S1Open ↗
08/13/2026M00908750-P1Open ↗
Showing 3 of 4 on file for this type