← Back
BuildNYC
Single or multiple dwelling with stores or offices
2135 2ND AVENUE
MANHATTAN · BIN 1052443
💬 Discuss this project
1900Year Built
4Stories
S9Building Class
R9AZoning
5,616 sfGross Floor Area
8Units
Rent Stabilized23 Active Violations 22 unresolved · 1 paperwork only ▸
Single or multiple dwelling with stores or offices · Owner of record: Pareh Realty · 1,971 sf lot · 2.85 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Yasmeh Realty LLCUnder Construction43p · 1 filing · 20 docs
CellarYasmeh Realty LLCUnder Construction47p · 1 filing · 20 docs
BasementYasmeh Realty LLCUnder Construction5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Yasmeh Realty1108/05/2026
Pareh Realty203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kieran Patrick Spillane412/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York403/21/2026
K & M Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.A.C. IndustriesGeneral Contractor208/05/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106312/22/2025
Building Lifecycle
All (97)Filed (4)Permit Issued (2)Violation (57)Objection (4)Special Inspection (30)
08/04/2026
Permit issued — Foundation
M00943321-I1-FO
02/11/2026
Permit issued — Structural
M00943321-S1-GC-CX
01/05/2026
Special inspection requirement — Demolition
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Vertical Masonry Foundation Elements
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
12/30/2025
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
12/30/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
12/30/2025
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
12/30/2025
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
12/30/2025
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
GEORGE GHEBRYAL
12/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
12/30/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
KIERAN SPILLANE
12/30/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
12/30/2025
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
12/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
12/30/2025
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
12/30/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
12/22/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo underpinning work on property. Including but not limited to repair/strengthen of existing foundation walls and columns.
M00943321-P3
12/22/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo underpinning work on property. Including but not limited to repair/strengthen of existing foundation walls and columns.
M00943321-P1
11/24/2025
Special inspection requirement — Footing and Foundation
11/24/2025
Special inspection requirement — Final
11/24/2025
Special inspection requirement — Vertical Masonry Foundation Elements
11/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/24/2025
Special inspection requirement — Structural Steel - Details
11/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/24/2025
Special inspection requirement — Post-installed Anchors
09/15/2025
Violation issued (HPD, open)
C
09/15/2025
Violation issued (HPD, open)
B
09/15/2025
Violation issued (HPD, open)
B
09/15/2025
Violation issued (HPD, open)
A
03/28/2024
Objection resolved — Addressed
03/20/2024
Objection resolved — Addressed
02/14/2024
Objection raised — Other
02/09/2024
Objection raised — Other
02/08/2024
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo underpinning work on property. Including but not limited to repair/strengthen of existing foundation walls and columns.
M00943321-S1
02/08/2024
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo underpinning work on property. Including but not limited to repair/strengthen of existing foundation walls and columns.
M00943321-I1
03/15/2023
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
07/14/2017
Violation issued (HPD, closed)
A
07/14/2017
Violation issued (HPD, closed)
A
07/14/2017
Violation issued (HPD, closed)
C
07/14/2017
Violation issued (HPD, closed)
B
07/14/2017
Violation issued (HPD, closed)
B
07/14/2017
Violation issued (HPD, closed)
B
07/14/2017
Violation issued (HPD, closed)
C
07/14/2017
Violation issued (HPD, closed)
B
07/14/2017
Violation issued (HPD, closed)
B
07/14/2017
Violation issued (HPD, closed)
B
07/14/2017
Violation issued (HPD, closed)
A
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedC.A.C. Industries08/04/2026
DOB NOWStructuralPermit IssuedC.A.C. Industries02/11/2026
BISFPISSUEDMaster Fire Systems09/04/2008
BISFPISSUEDNew York Business Fire System07/09/2004
BISMHISSUEDUniversal Group of NY06/09/2004
BISPLISSUEDWynne Plumbing & Heating04/24/2001
BISOTISSUEDPDC Interior Construciton03/30/2001
BISFPISSUEDNew York Business Fire System03/07/2001
1 project · most recent 12/22/2025
Steel Concrete
FiledStatusContractorScope
12/22/2025Permit IssuedC.A.C. IndustriesSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
01/05/2026DemolitionGEORGE GHEBRYALspecial
01/05/2026FinalGEORGE GHEBRYALprogress
01/05/2026Footing and FoundationGEORGE GHEBRYALprogress
01/05/2026Vertical Masonry Foundation ElementsGEORGE GHEBRYALspecial
01/05/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
01/05/2026Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
01/05/2026Post-installed AnchorsGEORGE GHEBRYALspecial
01/05/2026MasonryGEORGE GHEBRYALspecial
01/05/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
01/05/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
01/05/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
12/30/2025Footing and FoundationGEORGE GHEBRYALprogress
12/30/2025Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
12/30/2025Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
12/30/2025Structural Steel - WeldingGEORGE GHEBRYALspecial
12/30/2025Underpinning and alternate methods of support of buildings and adjacent propertyGEORGE GHEBRYALspecial
12/30/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
12/30/2025Subsurface Investigations (Borings/Test Pits)KIERAN SPILLANEspecial
12/30/2025Structural Steel - DetailsGEORGE GHEBRYALspecial
12/30/2025Deep Foundation ElementsGEORGE GHEBRYALspecial
12/30/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/30/2025Subgrade InspectionsGEORGE GHEBRYALspecial
12/30/2025FinalGEORGE GHEBRYALprogress
11/24/2025Footing and Foundation—progress
11/24/2025Final—progress
Latest 25 of 34.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026M00943321-P3Request digital key ↗
08/20/2026M00943321-P1Request digital key ↗
08/15/2026M00943321-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
09/09/2008110325318Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/23/2008110325318Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00943321-I1Open ↗
09/01/2026M00943321-I1Open ↗
09/01/2026M00943321-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026M00943321-S1Open ↗
08/20/2026M00943321-I1Open ↗
08/20/2026M00943321-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/23/2008110325318Open ↗
08/23/2008110325318Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00943321-I1Open ↗
08/25/2026M00943321-S1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/23/2008110325318Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026M00943321-P3Open ↗
08/20/2026M00943321-P1Open ↗
08/15/2026M00943321-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
08/23/2008110325318Open ↗
08/23/2008110325318Open ↗
08/23/2008110325318Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026M00943321-P1Open ↗
08/13/2026M00943321-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026M00943321-I1Open ↗
▸DOB NOWTR4: Test Report and Plot Diagram1
08/13/2026M00943321-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
08/23/2008110325318Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/23/2008110325318Open ↗
▸Other Documents6
▸DOB NOWGeotechnical Peer Review Report (BC 1818)4
08/13/2026M00943321-P1Open ↗
08/13/2026M00943321-S1Open ↗
08/13/2026M00943321-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)2
08/13/2026M00943321-P1Open ↗
08/13/2026M00943321-I1Open ↗