← Back
Walk-up apt, over six families with stores
2137 2 AVENUE
MANHATTAN · BIN 1052444
💬 Discuss this project
1900Year Built
4Stories
C7Building Class
R9AZoning
4,980 sfGross Floor Area
8Units
Rent Stabilized24 Open Violations 23 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: HASHMAT MGT CORP · 1,460 sf lot · 3.41 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 1Under Construction10p · 1 filing · 20 docs
CellarUnder Construction11p · 1 filing · 20 docs
Sub-BasementUnder Construction10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SASSON REALTY MGT608/26/2026
HASHMAT MGT CORP1103/22/2026
C O SASSON REALTY MGMT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KIERAN PATRICK SPILLANE412/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PINNACLE ENVIRONMENTAL COElectrical203/21/2026
C.A.C. INDUSTRIES, INCGeneral Contractor208/26/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106203/08/2024
Building Lifecycle
All (96)Filed (4)Permit Issued (2)Violation (60)Special Inspection (30)
07/13/2026
Permit issued — Foundation
M00942962-I1-FO
05/27/2026
Permit issued — General Construction
M00942962-S1-GC-CX
04/29/2026
Violation issued (HPD, open)
A
01/05/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Demolition
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Preliminary
KIERAN SPILLANE
01/05/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
01/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
12/23/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo underpinning work on property. Including but not limited to repair/strengthen of existing foundation walls and columns.
M00942962-P2
12/23/2025
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo underpinning work on property. Including but not limited to repair/strengthen of existing foundation walls and columns.
M00942962-P1
12/18/2025
Violation issued (HPD, closed)
C
12/18/2025
Violation issued (HPD, closed)
C
12/18/2025
Violation issued (HPD, closed)
C
12/06/2025
Violation issued (HPD, open)
C
12/06/2025
Violation issued (HPD, closed)
B
12/06/2025
Violation issued (HPD, closed)
B
12/06/2025
Violation issued (HPD, closed)
A
12/06/2025
Violation issued (HPD, closed)
B
12/06/2025
Violation issued (HPD, closed)
B
12/06/2025
Violation issued (HPD, closed)
C
12/06/2025
Violation issued (HPD, closed)
C
12/06/2025
Violation issued (HPD, open)
C
12/06/2025
Violation issued (HPD, closed)
A
12/06/2025
Violation issued (HPD, closed)
C
12/06/2025
Violation issued (HPD, closed)
B
12/06/2025
Violation issued (HPD, closed)
C
12/06/2025
Violation issued (HPD, closed)
A
12/06/2025
Violation issued (HPD, closed)
B
12/06/2025
Violation issued (HPD, open)
C
12/06/2025
Violation issued (HPD, closed)
B
12/06/2025
Violation issued (HPD, closed)
B
12/06/2025
Violation issued (HPD, closed)
C
11/24/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
11/24/2025
Special inspection requirement — Demolition
11/24/2025
Special inspection requirement — Masonry
11/24/2025
Special inspection requirement — Post-installed Anchors
11/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/24/2025
Special inspection requirement — Final
11/24/2025
Special inspection requirement — Footing and Foundation
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
03/08/2024
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo underpinning work on property. Including but not limited to repair/strengthen of existing foundation walls and columns.
M00942962-S1
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedC.A.C. INDUSTRIES, INC07/13/2026
DOB NOWGeneral ConstructionPermit IssuedC.A.C. INDUSTRIES, INC05/27/2026
BISPLISSUEDADVANTAGE PLBG & MECH.COR07/17/2013
BISBLISSUEDJACK PICCINI, INC03/14/2013
BISPLISSUEDADVANTAGE PLBG & MECH.COR09/20/2011
BIS—ISSUEDNURUL AMIN08/23/2011
BISFBISSUEDIRVING BAVALITSKY09/05/2001
BIS—ISSUEDNORTH SHORE NEON SIGN CO.,INC.08/26/1992
BIS—ISSUEDNORTH SHORE NEON SIGN CO.,INC.08/26/1992
1 project · most recent 03/22/2022
FiledStatusContractorScope
03/22/2022CompleteJOSEPH WEINSTEIN ELECTRIC1 meters
1 project · most recent 12/23/2025
FiledStatusContractorScope
12/23/2025Permit IssuedC.A.C. INDUSTRIES, INC5 scope_items
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
01/05/2026FinalGEORGE GHEBRYALprogress
01/05/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
01/05/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
01/05/2026Structural Steel - WeldingGEORGE GHEBRYALspecial
01/05/2026Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
01/05/2026Underpinning and alternate methods of support of buildings and adjacent propertyGEORGE GHEBRYALspecial
01/05/2026Subgrade InspectionsGEORGE GHEBRYALspecial
01/05/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
01/05/2026Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
01/05/2026Deep Foundation ElementsGEORGE GHEBRYALspecial
01/05/2026Footing and FoundationGEORGE GHEBRYALprogress
01/05/2026Post-installed AnchorsGEORGE GHEBRYALspecial
01/05/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
01/05/2026DemolitionGEORGE GHEBRYALspecial
01/05/2026MasonryGEORGE GHEBRYALspecial
01/05/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
01/05/2026Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
01/05/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
01/05/2026Footing and FoundationGEORGE GHEBRYALprogress
01/05/2026PreliminaryKIERAN SPILLANEprogress
01/05/2026FinalGEORGE GHEBRYALprogress
01/05/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
11/24/2025Construction Operations Influencing Adjacent Structures—special
11/24/2025Demolition—special
11/24/2025Masonry—special
Latest 25 of 32.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026M00942962-P2Request digital key ↗
08/27/2026M00942962-S1Request digital key ↗
08/27/2026M00942962-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
03/14/2013140061144Open ↗
03/14/2013140061144Open ↗
10/07/2011120682270Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
03/14/2013140061144Open ↗
11/12/2011120682270Open ↗
05/10/2011120682270Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026M00942962-P2Open ↗
08/27/2026M00942962-P1Open ↗
08/27/2026M00942962-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/29/2013140061144Open ↗
05/10/2011120682270Open ↗
06/23/2011120682270Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M00942962-S1Open ↗
08/22/2026M00942962-I1Open ↗
08/22/2026M00942962-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00942962-S1Open ↗
09/01/2026M00942962-S1Open ↗
08/22/2026M00942962-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/14/2013140061144Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/14/2013140061144Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/14/2013140061144Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE6
12/24/2013120682270Open ↗
12/06/2013120682270Open ↗
02/14/2013120682270Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING1
11/12/2011120682270Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/14/2013140061144Open ↗
▸Safety & Tenant Protection1
▸BISST-1 Street Tree Checklist1
06/28/2011120682270Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/27/2026M00942962-S1Open ↗
08/27/2026M00942962-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/10/2011120682270Open ↗
▸Energy Compliance3
▸BISEN2 - As Built Energy Analysis1
08/29/2013140061144Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/29/2013140061144Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/14/2013140061144Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/29/2013140061144Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/29/2013140061144Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
05/10/2011120682270Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/29/2013140061144Open ↗
03/14/2013140061144Open ↗
05/10/2011120682270Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISeFiling Job Application Cover Sheet2
05/10/2011120682270Open ↗
03/14/2013140061144Open ↗
▸Other Documents6
▸DOB NOWGeotechnical Peer Review Report (BC 1818)4
08/13/2026M00942962-I1Open ↗
08/13/2026M00942962-P1Open ↗
08/13/2026M00942962-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)2
08/13/2026M00942962-I1Open ↗
08/13/2026M00942962-P1Open ↗