← Back
BuildNYC
Five to six families
214-16 42ND AVENUE
QUEENS · Bayside · BIN 4138321
💬 Discuss this project
1931Year Built
2Stories
C2Building Class
R4Zoning
3,300 sfGross Floor Area
6Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Five to six families · Owner of record: Cre Realty · 8,750 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exterior2p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cre Realty603/22/2026
Stone Properties Group407/08/2026
Parker Greenfield103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MDG Design Group110/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M-Dis Design Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C&M Drywall & Acousticspecialty_contractor107/08/2026
Disano DemolitionGeneral Contractor211/19/2013
Senid PL & HeatingPlumbing111/01/2013
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sead Engineering2665110/20/2021
Building Lifecycle
01/18/2023
Signed off — Alteration
Q00609821-I1
01/17/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/16/2022
Permit issued — General Construction
Q00609821-I1-GC
10/20/2021
Filed — Alteration
Q00609821-I1
10/13/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
INHWAN CHANG
9 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offC&M Drywall & Acoustic12/16/2022
BISOTISSUEDDisano Demolition11/19/2013
BISPLISSUEDSenid PL & Heating11/01/2013
BISOTISSUEDDisano Demolition10/30/2013
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/17/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/13/2021Structural Stability – Alterations of existing buildingsINHWAN CHANGspecial
10/11/2021Concrete - Cast-In-PlaceINHWAN CHANGspecial
10/11/2021MasonryINHWAN CHANGspecial
57 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account