Miscellaneous two family
214 19 STREET
BROOKLYN · BIN 3009184
💬 Discuss this project
1910Year Built
2Stories
B9Building Class
R6BZoning
2,891 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 1,878 sf lot · 1.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 2 filings · 20 docs
Floor 2Under Construction44p · 2 filings · 20 docs
Floor 1Under Construction43p · 1 filing · 20 docs
BasementUnder Construction43p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANTHONY HATZIIOANNOU ARCHITECT PC810/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUMMIT CONSULTING & EXPEDITING1203/21/2026
EDGE + CO ARCHITECTURE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIJI HOME IMPROV & HANDYGeneral Contractor1207/08/2026
MOD CONSULTANTS LLCGeneral Contractor607/08/2026
FANTASTIC RENOVATIONS &General Contractor303/21/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SGM ENGINEERING2366204/08/2024
C.M. TESTING LABORATORY,1352112/21/2021
Building Lifecycle
All (124)Filed (8)Permit Issued (12)Violation (4)Inspection (6)Objection (64)Special Inspection (30)
01/07/2026
Permit issued — General Construction
B00629314-S7-GC
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2025
Objection resolved — Addressed
11/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
11/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
11/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
10/23/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSE ADDITIONAL 2 STORY HORIZONTAL ANDVERTICAL EXTENSION. INTERIOR RENOVATION TO EXISTING BUILDING AND REMOVE EXISTING GARAGE.
B00629314-P2
10/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
10/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
10/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
10/02/2025
Objection raised — Energy
09/29/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSE ADDITIONAL 2 STORY HORIZONTAL ANDVERTICAL EXTENSION. INTERIOR RENOVATION TO EXISTING BUILDING AND REMOVE EXISTING GARAGE.
B00629314-S7
09/29/2025
Special inspection requirement — Air barrier — testing
Younes Abouyaala
09/29/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
09/29/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
09/29/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
09/29/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
09/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
09/29/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
06/03/2025
Permit issued — General Construction
B00629314-S1-GC
03/06/2025
Permit issued — General Construction
B00629314-S1-GC
03/06/2025
Permit issued — Structural
B00629314-S3-ST
03/04/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/27/2025
Permit issued — Construction Fence
B00629314-S5-FN
02/27/2025
Permit issued — Plumbing
B00629314-S6-PL
10/15/2024
Objection resolved — Addressed
10/15/2024
Objection resolved — Addressed
08/23/2024
Objection raised — Energy
08/05/2024
Objection raised — Scope
07/30/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSE ADDITIONAL 2 STORY HORIZONTAL ANDVERTICAL EXTENSION. INTERIOR RENOVATION TO EXISTING BUILDING AND REMOVE EXISTING GARAGE.
B00629314-S6
07/22/2024
Permit issued — Construction Fence
B00629314-S5-FN
07/18/2024
Objection resolved — Addressed
07/17/2024
Objection raised — Other
07/15/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSE ADDITIONAL 2 STORY HORIZONTAL ANDVERTICAL EXTENSION. INTERIOR RENOVATION TO EXISTING BUILDING AND REMOVE EXISTING GARAGE.
B00629314-S5
06/20/2024
Permit issued — Structural
B00629314-S3-ST
05/23/2024
Permit issued — Structural
B00629314-S3-ST
05/23/2024
Permit issued — General Construction
B00629314-S1-GC
05/01/2024
Permit issued — Structural
B00629314-S3-ST
04/22/2024
Objection resolved — Addressed
04/19/2024
Objection raised — Scope
04/17/2024
Objection resolved — Addressed
04/12/2024
Objection raised — Scope
04/11/2024
Permit issued — General Construction
B00629314-S1-GC
04/11/2024
Objection resolved — Addressed
04/10/2024
Objection raised — Other
04/08/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSE ADDITIONAL 2 STORY HORIZONTAL ANDVERTICAL EXTENSION. INTERIOR RENOVATION TO EXISTING BUILDING AND REMOVE EXISTING GARAGE.
B00629314-S3
04/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/29/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/14/2024
Violation issued (ECB, closed)
Construction
03/14/2024
Violation issued (ECB, closed)
Construction
03/14/2024
Violation issued (ECB, closed)
Construction
03/14/2024
Violation issued (ECB, closed)
Construction
11/08/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSE ADDITIONAL 2 STORY HORIZONTAL ANDVERTICAL EXTENSION. INTERIOR RENOVATION TO EXISTING BUILDING AND REMOVE EXISTING GARAGE.
B00629314-S1
01/14/2022
Objection raised — Zoning
01/14/2022
Objection resolved — Addressed
12/27/2021
Objection raised — Zoning
12/27/2021
Objection resolved — Addressed
12/27/2021
Objection raised — Zoning
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMOD CONSULTANTS LLC01/07/2026
DOB NOWGeneral ConstructionPermit IssuedMOD CONSULTANTS LLC06/03/2025
DOB NOWGeneral ConstructionPermit IssuedMOD CONSULTANTS LLC03/06/2025
DOB NOWStructuralPermit IssuedMOD CONSULTANTS LLC03/06/2025
DOB NOWConstruction FencePermit IssuedFANTASTIC RENOVATIONS &02/27/2025
DOB NOWPlumbingPermit IssuedJVR PLBG AND HEATING INC02/27/2025
DOB NOWConstruction FencePermit IssuedRIJI HOME IMPROV & HANDY07/22/2024
DOB NOWStructuralPermit IssuedRIJI HOME IMPROV & HANDY06/20/2024
DOB NOWStructuralPermit IssuedRIJI HOME IMPROV & HANDY05/23/2024
DOB NOWGeneral ConstructionPermit IssuedRIJI HOME IMPROV & HANDY05/23/2024
DOB NOWStructuralPermit IssuedRIJI HOME IMPROV & HANDY05/01/2024
DOB NOWGeneral ConstructionPermit IssuedRIJI HOME IMPROV & HANDY04/11/2024
1 project · most recent 10/23/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/23/2025Permit IssuedJVR PLBG AND HEATING INCGas, Water/Sanitary
3 projects · most recent 07/22/2026
General Wiring
FiledStatusContractorScope
07/22/2026CompleteCADISU ELECTRIC INC3 meters, 1 new_meters
08/01/2024Permit IssuedCADISU ELECTRIC INCGeneral Wiring
05/22/2024Permit IssuedDANICK ELEC'L CONTR'G CORGeneral Wiring
1 project · most recent 10/23/2025
Steel Concrete
FiledStatusContractorScope
10/23/2025Permit IssuedMOD CONSULTANTS LLCSteel, Concrete
1 project · most recent 10/23/2025
Fence
FiledStatusContractorScope
10/23/2025Permit IssuedMOD CONSULTANTS LLCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/04/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/29/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
11/25/2025HVAC-R and service water heating system controlssteven Giammonaenergy_progress
11/25/2025HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
11/25/2025HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
10/22/2025HVAC-R and service water heating system controlssteven Giammonaenergy_progress
10/22/2025HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
10/22/2025HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
09/29/2025Air barrier — testing Younes Abouyaalaenergy_progress
09/29/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
09/29/2025Fenestration areasYounes Abouyaalaenergy_progress
09/29/2025Fenestration air leakageYounes Abouyaalaenergy_progress
09/29/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
09/29/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
09/29/2025Permanent certificateYounes Abouyaalaenergy_progress
11/11/2021Post-installed Anchorssteven Giammonaspecial
11/11/2021Structural Stability – Alterations of existing buildingssteven Giammonaspecial
11/11/2021Concrete - Cast-In-Placesteven Giammonaspecial
11/11/2021Excavations - Sheeting, Shoring, and BracingJOHN SEMIOLIspecial
11/11/2021Exterior Insulation and Finish Systems (EIFS)steven Giammonaspecial
11/11/2021Fire-Resistant Penetrations and Jointssteven Giammonaspecial
11/11/2021Masonrysteven Giammonaspecial
11/11/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsteven Giammonaspecial
11/11/2021Energy Code Compliance Inspectionssteven Giammonaprogress
11/11/2021Fire-Resistance Rated Constructionsteven Giammonaprogress
11/11/2021Fenestration areassteven Giammonaenergy_progress
11/11/2021Fenestration and door U-factor and product ratingssteven Giammonaenergy_progress
Latest 25 of 47.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026B00629314-S7Request digital key ↗
08/20/2026B00629314-P2Request digital key ↗
08/20/2026B00629314-S6Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00629314-I1Open ↗
08/13/2026B00544531-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature14
08/29/2026B00629314-S7Open ↗
08/29/2026B00629314-S6Open ↗
08/29/2026B00629314-S6Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/23/2026B00629314-I1Open ↗
08/23/2026B00629314-I1Open ↗
08/23/2026B00629314-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026B00629314-P2Open ↗
08/20/2026B00629314-S7Open ↗
08/20/2026B00629314-S6Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00544531-I1Open ↗
08/13/2026B00629314-S1Open ↗
08/13/2026B00629314-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B00544531-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/20/2026B00629314-P2Open ↗
08/20/2026B00629314-S7Open ↗
08/20/2026B00629314-S6Open ↗
Showing 3 of 7 on file for this type
▸Other Documents10
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00629314-I1Open ↗
08/13/2026B00629314-S1Open ↗
08/13/2026B00544531-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026B00629314-S1Open ↗
08/13/2026B00629314-S7Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B00629314-I1Open ↗
▸DOB NOWSURVEY: INITIAL1
08/13/2026B00544531-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00629314-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00544531-I1Open ↗