← Back
Two family converted from one family
214-21 35 AVENUE
QUEENS · Bayside · BIN 4443774
💬 Discuss this project
1940Year Built
2.5Stories
B3Building Class
R3XZoning
2,796 sfGross Floor Area
2Units
3 Open Violations ▸FDNY Report ↗
Two family converted from one family · 3,743 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 8 docs
Cellar4p · 3 filings · 17 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/08/2023$1.4M—Private party → Private party$486/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.512/15/2023
FIRST HEC DESIGN INC.201/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM CONSULTANT STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPER POWER CONSTRUCTIONGeneral Contractor603/21/2026
L&J PLG & HTG CO OF NY INPlumbing307/08/2026
TRI STATE PLBG & HTG INCPlumbing307/08/2026
AERO ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613512/15/2023
Building Lifecycle
All (63)Filed (7)Permit Issued (8)Signed Off (2)Violation (12)Inspection (13)Objection (6)Special Inspection (15)
01/24/2024
Signed off — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: Q00837818. CAP & REMOVE PLUMBING FIXTURES & INSTALL NEW PLUMBING FIXTURES AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00837833-I1
01/23/2024
Signed off — Alteration
RENOVATE CELLAR, 1ST, 2ND FLOOR & ATTIC FOR AN EXISTING 2 FAMILY HOUSE. NEW PARTITION & DOOR, COSMETIC & STRUCTURE WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNow JOB #: Q00837833. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00837818-I1
12/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
12/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
12/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
12/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
12/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
12/15/2023
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: Q00837818. CAP & REMOVE PLUMBING FIXTURES & INSTALL NEW PLUMBING FIXTURES AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00837833-P2
12/15/2023
Filed — Alteration
RENOVATE CELLAR, 1ST, 2ND FLOOR & ATTIC FOR AN EXISTING 2 FAMILY HOUSE. NEW PARTITION & DOOR, COSMETIC & STRUCTURE WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNow JOB #: Q00837833. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00837818-P1
12/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
12/15/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
12/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
12/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
11/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/09/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/03/2023
Permit issued — Plumbing
Q00837833-I1-PL
08/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2023
Permit issued — Plumbing
Q00837833-I1-PL
07/28/2023
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: Q00837818. CAP & REMOVE PLUMBING FIXTURES & INSTALL NEW PLUMBING FIXTURES AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00837833-P1
07/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
07/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
07/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
07/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
07/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
05/31/2023
Permit issued — Plumbing
Q00837833-I1-PL
05/19/2023
Permit issued — General Construction
Q00837818-I1-ST
05/19/2023
Permit issued — General Construction
Q00837818-I1-GC
04/14/2023
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: Q00837818. CAP & REMOVE PLUMBING FIXTURES & INSTALL NEW PLUMBING FIXTURES AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00837833-I1
04/06/2023
Objection raised — Zoning
04/06/2023
Objection resolved — Addressed
04/06/2023
Objection raised — Structural
04/06/2023
Objection resolved — Addressed
04/06/2023
Objection raised — Mechanical
04/06/2023
Objection resolved — Addressed
03/30/2023
Filed — Alteration
RENOVATE CELLAR, 1ST, 2ND FLOOR & ATTIC FOR AN EXISTING 2 FAMILY HOUSE. NEW PARTITION & DOOR, COSMETIC & STRUCTURE WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNow JOB #: Q00837833. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00837818-I1
10/21/2022
Violation issued (HPD, open)
B
10/21/2022
Violation issued (HPD, open)
B
01/24/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/06/2022
Filed — Alteration
-FILE PLUMBING WORK TYPE IN CONJUNCTION WITH ALT 2 INTERIOR RENOVATION (#421885106)TO CURE ECB VIOLATION 39021325Y;39021326XNO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00352574-S1
11/22/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/09/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/22/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/14/2021
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
10/01/2021
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
09/29/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2021
Permit issued — Plumbing
Q75989311-I1-PL
09/01/2021
Permit issued — Plumbing
Q75649987-I1-PL
05/11/2021
Violation issued (ECB, closed)
Construction
02/01/2021
Permit issued — Plumbing
Q00352574-I1-PL
12/08/2020
Filed — Alteration
-FILE PLUMBING WORK TYPE IN CONJUNCTION WITH ALT 2 INTERIOR RENOVATION (#421885106)TO CURE ECB VIOLATION 39021325Y;39021326XNO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00352574-I1
11/24/2020
Violation issued (ECB, closed)
Construction
10/29/2020
Violation issued (ECB, closed)
Construction
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/20/2020
Violation issued (ECB, closed)
Construction
04/20/2020
Violation issued (ECB, closed)
Unknown
03/09/2020
Violation issued (HPD, open)
B
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC11/03/2023
DOB NOWPlumbingSigned-offDW PLUMBING INC07/29/2023
DOB NOWPlumbingSigned-offDW PLUMBING INC05/31/2023
DOB NOWGeneral ConstructionSigned-offSUPER POWER CONSTRUCTION05/19/2023
DOB NOWGeneral ConstructionSigned-offSUPER POWER CONSTRUCTION05/19/2023
DOB NOWPlumbingPermit IssuedL&J PLG & HTG CO OF NY IN09/16/2021
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN09/01/2021
DOB NOWPlumbingPermit IssuedL&J PLG & HTG CO OF NY IN02/01/2021
BISOTISSUEDAMERGY SOLAR INC07/18/2023
BISOTISSUEDGENESIS NYC CONSTRUCTION12/28/2020
1 project · most recent 01/06/2022
Gas Water/Sanitary
FiledStatusContractorScope
01/06/2022Permit IssuedL&J PLG & HTG CO OF NY INGas, Water/Sanitary
2 projects · most recent 08/04/2023
General Wiring
FiledStatusContractorScope
08/04/2023CompleteI.P. ELECTRIC INC—
02/11/2021CompleteAERO ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
11/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/09/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/22/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/09/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/22/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2021No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/01/2021No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
09/29/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
12/27/2023Fire-Resistant Penetrations and JointsFran Huangspecial
12/27/2023Energy Code Compliance InspectionsFran Huangprogress
12/27/2023HVAC-R and service water piping design and insulationFran Huangenergy_progress
12/27/2023HVAC-R and service water heating equipmentFran Huangenergy_progress
12/27/2023HVAC-R and service water heating system controlsFran Huangenergy_progress
12/15/2023HVAC-R and service water heating equipmentFran Huangenergy_progress
12/15/2023Fire-Resistant Penetrations and JointsFran Huangspecial
12/15/2023Energy Code Compliance InspectionsFran Huangprogress
12/15/2023HVAC-R and service water heating system controlsFran Huangenergy_progress
12/15/2023HVAC-R and service water piping design and insulationFran Huangenergy_progress
07/27/2023Fire-Resistant Penetrations and JointsFran Huangspecial
07/27/2023Energy Code Compliance InspectionsFran Huangprogress
07/27/2023HVAC-R and service water heating system controlsFran Huangenergy_progress
07/27/2023HVAC-R and service water piping design and insulationFran Huangenergy_progress
07/27/2023HVAC-R and service water heating equipmentFran Huangenergy_progress
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/26/2026Q00352574-S1Request digital key ↗
08/25/2026Q00837818-P1Request digital key ↗
08/24/2026Q00837833-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/26/2026Q00352574-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
07/13/2023440793642Open ↗
07/28/2020421885106Open ↗
▸BISWORK PERMIT APPLICATION2
07/18/2023440793642Open ↗
12/28/2020421885106Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWRestrictive Declaration/Easement 17
08/24/2026Q00837833-P1Open ↗
08/24/2026Q00837833-I1Open ↗
08/13/2026Q00352574-S1Open ↗
Showing 3 of 7 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
06/19/2020421885106Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
07/15/2020421885106Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature12
08/28/2026Q00837833-P2Open ↗
08/28/2026Q00837833-P2Open ↗
08/28/2026Q00837833-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00837833-P1Open ↗
08/24/2026Q00837833-I1Open ↗
08/13/2026Q00352574-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026Q00837833-P2Open ↗
08/26/2026Q00837833-I1Open ↗
08/23/2026Q00837833-P1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/13/2023440793642Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/13/2023440793642Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/13/2023440793642Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES1
06/19/2020421885106Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
07/18/2023440793642Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00352574-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026Q00837833-P1Open ↗
08/24/2026Q00837833-I1Open ↗
08/13/2026Q00837818-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/13/2023440793642Open ↗
06/19/2020421885106Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
12/03/2023440793642Open ↗
11/30/2023440793642Open ↗
07/13/2023440793642Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
07/15/2020421885106Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/03/2023440793642Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/16/2021421885106Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/13/2023440793642Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
12/03/2023440793642Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/13/2023440793642Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY14
12/03/2023440793642Open ↗
11/30/2023440793642Open ↗
07/13/2023440793642Open ↗
Showing 3 of 14 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/04/2023440793642Open ↗
04/16/2021421885106Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/04/2023440793642Open ↗
11/30/2023440793642Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT3
07/13/2023440793642Open ↗
04/16/2021421885106Open ↗
09/04/2020421885106Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/03/2023440793642Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
06/19/2020421885106Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
06/19/2020421885106Open ↗
06/02/2020421885106Open ↗
▸BISBOROUGH INTAKE FORM1
06/02/2020421885106Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/13/2023440793642Open ↗