← Back
Two stories - detached, small or mid-size
214-33 36 AVENUE
QUEENS · BIN 4136557
💬 Discuss this project
1901Year Built
2.5Stories
A1Building Class
R3XZoning
1,695 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR112/03/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281112/03/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Inspection (1)Special Inspection (5)
05/18/2026
Signed off — Alteration
installation of solar panels, rooftop, railed, grid-tied, 26 modules, 11.18 KW
Q01327880-I1
01/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/05/2025
Permit issued — Solar
Q01327880-I1-SL
12/03/2025
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 26 modules, 11.18 KW
Q01327880-I1
12/03/2025
Special inspection requirement — Final
Mina Makar
12/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/03/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR12/05/2025
3 projects · most recent 06/17/2026
FiledStatusContractorScope
06/17/2026CompleteLIT MODE ELECL CONTG INC1 meters
12/26/2025CompleteISLAND ELECTRIC CORP—
12/03/2025Permit IssuedISLAND ELECTRIC CORP—
1 project · most recent 12/03/2025
FiledStatusContractorScope
12/03/2025Signed-offMOMENTUM SOLAR26 panels, 11.18 kw, 457 roof_area_sqft
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/03/2025FinalMina Makarprogress
12/03/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
12/03/2025Fire-Resistant Penetrations and JointsMina Makarspecial
12/03/2025Energy Code Compliance InspectionsMina Makarprogress
12/03/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01327880-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01327880-I1Open ↗
09/01/2026Q01327880-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01327880-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q01327880-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01327880-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026Q01327880-I1Open ↗