← Back
Office with commercial, 1-6 stories
Ensemble for the Romantic Century
214 WEST 50 STREET · Midtown-Times Square · BIN 1024803
💬 Discuss this project
1920Year Built
5Stories
O5Building Class
C6-7TZoning
7,550 sfGross Floor Area
6Units
Rent Stabilized5 Open Violations ▸
Office with commercial, 1-6 stories · Owner of record: 214 WEST 50TH STREET, LLC · 2,008 sf lot · 3.76 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
214 WEST 50TH STREET503/22/2026
214 W. 50TH ST.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
FALCON GROUP203/21/2026
NEW YORK ENGINEERING ASSOCIATES P403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOHO CONTRACTING CORPGeneral Contractor507/08/2026
JASON GILSTONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FALCON ENGINEERING CO.LLC5649110/09/2024
NEW YORK ENGINEERING ASSO851204/02/2021
Building Lifecycle
All (41)Filed (5)Permit Issued (4)Signed Off (4)Violation (17)Special Inspection (11)
05/22/2025
Signed off — Alteration
M01110727-I1
05/22/2025
Signed off — Alteration
ERECT, MAINTAIN & DISMANTLE OF SIDEWALK SHED FOR FACADE REPAIRS PER DRAWINGS ATTACHED HEREWITH.
M01023808-I1
05/02/2025
Signed off — Alteration
Repairs to North Facade. No change in occupancy, use, or egress.
M01080683-I1
11/01/2024
Permit issued — General Construction
M01080683-I1-GC
10/09/2024
Filed — Alteration
Repairs to North Facade. No change in occupancy, use, or egress.
M01080683-I1
09/30/2024
Permit issued — Supported Scaffold
M01110727-I1-SF
09/26/2024
Filed — Alteration
M01110727-I1
08/20/2024
Special inspection requirement — Final
Anthony Volpe
08/20/2024
Special inspection requirement — Air barrier - visual inspection
Anthony Volpe
08/20/2024
Special inspection requirement — Masonry
Anthony Volpe
04/05/2024
Filed — Alteration
ERECT, MAINTAIN & DISMANTLE OF SIDEWALK SHED FOR FACADE REPAIRS PER DRAWINGS ATTACHED HEREWITH.
M01023808-I1
04/05/2024
Permit issued — Sidewalk Shed
M01023808-I1-SH
04/20/2021
Signed off — Alteration
Replace boiler and oil burner.
M00391880-I1
04/02/2021
Filed — Alteration
Replace boiler and oil burner.
M00391880-P1
04/02/2021
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
04/02/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
04/02/2021
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
04/02/2021
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
04/02/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
04/02/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
04/02/2021
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
04/02/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
10/07/2020
Filed — Alteration
Replace boiler and oil burner.
M00391880-I1
10/07/2020
Permit issued — Boiler Equipment
M00391880-I1-BE
10/26/2016
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
02/03/2015
Violation issued (HPD, closed)
I
07/11/2014
Violation issued (ECB, closed)
Unknown
07/11/2014
Violation issued (ECB, closed)
Unknown
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/18/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/07/2000
Violation issued (HPD, open)
B
09/02/1999
Violation issued (ECB, closed)
Construction
09/02/1999
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/06/1996
Violation issued (HPD, closed)
A
04/11/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/19/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/29/1993
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSOHO CONTRACTING CORP11/01/2024
DOB NOWSupported ScaffoldSigned-offSOHO CONTRACTING CORP09/30/2024
DOB NOWSidewalk ShedSigned-offSOHO CONTRACTING CORP04/05/2024
DOB NOWBoiler EquipmentSigned-offMMI MECHANICAL INC10/07/2020
BISEQISSUEDROCKLEDGE SCAFFOLD CORP11/14/2006
BIS—ISSUEDNEW YORK SIGN CITY INC05/07/2004
BISPLISSUEDTHE PLUMB CO INC.04/26/2004
BISMHISSUEDMICHELLE KUO CORP04/09/2004
BISFSISSUEDJACK PICCINI, INC12/02/1999
BISFPISSUEDIDEAL FIRE CONTROL05/20/1999
BISOTISSUEDCOOK & KRUPA INC02/03/1999
BISBLISSUEDUNFLAT & PERTOTTO ASSO03/22/1995
1 project · most recent 03/12/2024
FiledStatusContractorScope
03/12/2024CompletePALANT ELEC'L CONTR'G COR—
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/20/2024FinalAnthony Volpeprogress
08/20/2024Air barrier - visual inspectionAnthony Volpeenergy_progress
08/20/2024MasonryAnthony Volpespecial
04/02/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
04/02/2021Heating SystemsLOUIS ARENAspecial
04/02/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
04/02/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
04/02/2021Heating SystemsLOUIS ARENAspecial
04/02/2021Maintenance informationLOUIS ARENAenergy_progress
04/02/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
04/02/2021Maintenance informationLOUIS ARENAenergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/27/2026M01023808-I1Request digital key ↗
08/26/2026M01110727-I1Request digital key ↗
08/26/2026M01080683-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/03/2026M00391880-I1Request digital key ↗
08/15/2026M00391880-P1Request digital key ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
08/25/2026M00391880-P1Open ↗
08/25/2026M00391880-P1Open ↗
08/25/2026M00391880-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026M00391880-P1Open ↗
09/03/2026M00391880-I1Open ↗
08/26/2026M01110727-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026M00391880-P1Open ↗
08/24/2026M00391880-I1Open ↗
08/22/2026M01080683-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/03/2026M00391880-P1Open ↗
09/03/2026M00391880-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01080683-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00391880-I1Open ↗