Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofConsolidated EdisonUnder Construction8p · 1 filing · 15 docs
ArchitectureDMMechanicalStructural
Issued Permit Scope
General Construction
Project M01244671Permit Issued · 02/04/2026
FILING HEREWITH NEW HEAT PUMP WATER HEATER AND STORAGE TANKS TO REPLACE THE TWO EXISTING 76MBH & 199 MBH NATURAL GAS FIRED WATER HEATERS. DISCONNECT AND REMOVE NATURAL GAS PIPING FOR EQUIPMENT TO BE DEMOLISHED
On file for this project
24 documents
Floor 2Consolidated EdisonUnder Construction12p · 1 filing · 15 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Project M01244671Permit Issued · 02/04/2026
FILING HEREWITH NEW HEAT PUMP WATER HEATER AND STORAGE TANKS TO REPLACE THE TWO EXISTING 76MBH & 199 MBH NATURAL GAS FIRED WATER HEATERS. DISCONNECT AND REMOVE NATURAL GAS PIPING FOR EQUIPMENT TO BE DEMOLISHED
On file for this project
24 documents
Floor 1Consolidated EdisonUnder Construction18p · 1 filing · 15 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Project M01244671Permit Issued · 02/04/2026
FILING HEREWITH NEW HEAT PUMP WATER HEATER AND STORAGE TANKS TO REPLACE THE TWO EXISTING 76MBH & 199 MBH NATURAL GAS FIRED WATER HEATERS. DISCONNECT AND REMOVE NATURAL GAS PIPING FOR EQUIPMENT TO BE DEMOLISHED
On file for this project
24 documents
Filed — no permit issuedConsolidated Edison5p · 1 filing · 3 docs
ArchitectureGeneral
Project M01463043Approved
Replace perimeter fence as per plans. No change in use, egress, or occupancy.
On file for this project
3 documents