← Back
Walk-up apt, over six families with stores
2142 5 AVENUE
MANHATTAN · BIN 1053849
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
R7-2Zoning
10,315 sfGross Floor Area
10Units
Rent Stabilized14 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 131ST STREET REALTY LLC · 2,750 sf lot · 3.75 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof4p · 1 filing · 8 docs
Cellar7p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIMA PROPERTY GROUP2807/08/2026
131ST STREET REALTY LLC203/22/2026
CITY OF NEW YORK DEPT OF HPD303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.901/20/2023
PAUL PERDEK, PROF. ENG. PLLC111/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FLINT MECHANICAL CORPPlumbing407/08/2026
ACE CHIMNEY & FIREPLACEGeneral Contractor107/08/2026
EMPIRE NY INSTALLATIONS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808212/27/2022
Building Lifecycle
All (86)Filed (10)Permit Issued (6)Signed Off (1)Violation (60)Inspection (3)Special Inspection (6)
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
A
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
C
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
C
09/07/2026
Violation issued (HPD, open)
B
06/10/2026
Violation issued (HPD, closed)
C
05/13/2026
Violation issued (HPD, open)
B
05/13/2026
Violation issued (HPD, closed)
C
05/13/2026
Violation issued (HPD, closed)
C
05/13/2026
Violation issued (HPD, open)
A
05/13/2026
Violation issued (HPD, open)
C
05/13/2026
Violation issued (HPD, closed)
C
02/17/2024
Violation issued (HPD, closed)
C
02/17/2024
Violation issued (HPD, closed)
C
01/04/2024
Violation issued (HPD, closed)
A
01/04/2024
Violation issued (HPD, closed)
B
05/01/2023
Violation issued (HPD, closed)
B
05/01/2023
Violation issued (HPD, closed)
C
04/07/2023
Violation issued (HPD, closed)
C
04/07/2023
Violation issued (HPD, closed)
B
01/21/2023
Violation issued (HPD, closed)
B
01/21/2023
Violation issued (HPD, closed)
C
01/21/2023
Violation issued (HPD, closed)
C
01/21/2023
Violation issued (HPD, closed)
B
01/21/2023
Violation issued (HPD, closed)
B
01/21/2023
Violation issued (HPD, closed)
B
01/21/2023
Violation issued (HPD, closed)
B
01/21/2023
Violation issued (HPD, closed)
B
01/20/2023
Filed — Alteration
INSTALL REPLACEMENT GAS PIPING FOR TWO (2) REPLACEMENT DIRECT VENT GAS-FIRED BOILERS. INSTALL NEW INDIRECT STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00494321-P2
01/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
12/28/2022
Special inspection requirement — Mechanical Systems
Joseph Bazini
12/28/2022
Special inspection requirement — Final
Joseph Bazini
12/27/2022
Filed — Alteration
INSTALL EXHAUST VENTS AND AIR INTAKE VENTS FOR TWO (2) REPLACEMENT DIRECT VENT GAS-FIRED BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00494388-P1
12/27/2022
Filed — Alteration
INSTALL REPLACEMENT GAS PIPING FOR TWO (2) REPLACEMENT DIRECT VENT GAS-FIRED BOILERS. INSTALL NEW INDIRECT STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00494321-P1
12/27/2022
Filed — Alteration
REPLACE ONE (1) MODULAR GAS-FIRED BOILER WITH TWO (2) DIRECT VENT GAS-FIRED BOILERS. THIS APPLICATION IS FOR ONE (1) REPLACEMENT UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00494295-P1
12/27/2022
Filed — Alteration
REPLACE ONE (1) MODULAR GAS-FIRED BOILER WITH TWO (2) DIRECT VENT GAS-FIRED BOILERS. THIS APPLICATION IS FOR ONE (1) NEW UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00494307-P1
12/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
12/07/2022
Permit issued — Boiler Equipment
M00494307-I1-BE
11/29/2022
Permit issued — Mechanical Systems
M00494388-I1-MS
11/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
11/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
11/23/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/21/2022
Permit issued — Plumbing
M00494321-I1-PL
11/18/2022
Permit issued — Boiler Equipment
M00494295-I1-BE
11/16/2022
Violation issued (HPD, closed)
B
11/16/2022
Violation issued (HPD, closed)
B
11/16/2022
Violation issued (HPD, closed)
C
11/16/2022
Violation issued (HPD, closed)
C
03/29/2022
Violation issued (HPD, closed)
C
03/29/2022
Violation issued (HPD, closed)
B
03/29/2022
Violation issued (HPD, closed)
C
03/29/2022
Violation issued (HPD, closed)
C
03/29/2022
Violation issued (HPD, closed)
B
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offFLINT MECHANICAL CORP12/07/2022
DOB NOWMechanical SystemsPermit IssuedACE CHIMNEY FIREPLACE11/29/2022
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP11/21/2022
DOB NOWBoiler EquipmentSigned-offFLINT MECHANICAL CORP11/18/2022
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I11/23/2021
DOB NOWBoiler EquipmentSigned-offFLINT MECHANICAL CORP05/12/2021
BISPLISSUEDLINDEN PLUMBING & HEATING INC11/04/1994
BIS—ISSUEDHARWIN PROSPECT ASSOC12/23/1993
BISEQISSUEDHARWIN PROSPECT ASSOC03/17/1993
BISPLISSUEDL.T. MECHANICAL06/12/1992
BISEQISSUEDHARWIN PROSPECT ASSOC03/06/1992
BIS—ISSUEDHARWIN PROSPECT ASSOC03/06/1992
1 project · most recent 12/27/2022
Others
FiledStatusContractorScope
12/27/2022Permit IssuedACE CHIMNEY & FIREPLACEOthers
1 project · most recent 01/20/2023
Gas
FiledStatusContractorScope
01/20/2023Signed-offARTEMIS PLUMBING LLCGas
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2023Pass-Final Boiler Equipment InspectionPassView ↗
11/23/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/28/2022HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
12/28/2022Mechanical SystemsJoseph Bazinispecial
12/28/2022FinalJoseph Baziniprogress
12/27/2022HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
11/28/2022HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
11/28/2022HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00494307-I1Request digital key ↗
09/03/2026M00494307-P1Request digital key ↗
09/03/2026M00625877-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00494307-I1Open ↗
09/03/2026M00625877-I1Open ↗
09/01/2026M00494321-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026M00494295-I1Open ↗
08/26/2026M00494295-P1Open ↗
08/26/2026M00494388-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026M00494388-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/03/2026M00494307-I1Open ↗
09/01/2026M00494321-P1Open ↗
09/01/2026M00494321-P2Open ↗
Showing 3 of 9 on file for this type