2143 58TH STREET
BROOKLYN · BIN 3429917
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R5Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned residential, not Manhattan · Owner of record: BH 2145 58TH ST LLC · 1,954 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction32p · 2 filings · 20 docs
Floor 3Under Construction32p · 2 filings · 20 docs
Floor 2Under Construction32p · 2 filings · 20 docs
Floor 1Under Construction31p · 2 filings · 20 docs
CellarUnder Construction36p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A PLUS 1 MANAGEMENT3209/13/2026
MNK ENTERPRISES509/13/2026
OWNERS REP304/09/2026
UPSTRATE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
AVALON DESIGNS803/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UPSTRATE INCGeneral Contractor507/08/2026
STRUCTURELINE INCGeneral Contractor404/09/2026
MNK ENTERPRISES LLCGeneral Contractor104/09/2026
YCK DEVELOPERS LLCGeneral Contractor107/08/2026
PLUMBING NYC INCPlumbing107/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616808/04/2026
Building Lifecycle
All (159)Filed (14)Permit Issued (14)Signed Off (4)Violation (1)Inspection (16)Objection (80)Special Inspection (30)
08/04/2026
Filed — New Building
Structural and foundation work in conjunction with GC filing B01100641-I1
B01100641-P4
08/03/2026
Filed — New Building
Structural and foundation work in conjunction with GC filing B01100641-I1
B01100641-P5
07/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/02/2026
Permit issued — General Construction
B01100641-I1-GC
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/17/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/17/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/17/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
06/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/11/2026
Permit issued — Mechanical Systems
B01100641-S2-MS
06/08/2026
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01239721-I1
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/03/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/03/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/03/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
06/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
06/03/2026
Special inspection requirement — Electric vehicle service equipment requirements
FAHAD FATEH
06/03/2026
Special inspection requirement — Metering
FAHAD FATEH
06/03/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/03/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
06/03/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
06/03/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
06/03/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/03/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/02/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/01/2026
Objection resolved — Addressed
05/26/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01339625-I1
05/26/2026
Objection raised — Accessibility
05/20/2026
Filed — New Building
Structural and foundation work in conjunction with GC filing B01100641-I1
B01100641-P3
05/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/12/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/11/2026
Filed — New Building
Structural and foundation work in conjunction with GC filing B01100641-I1
B01100641-P2
05/11/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/07/2026
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/07/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/07/2026
Special inspection requirement — Final
FAHAD FATEH
05/07/2026
Special inspection requirement — Shutoff dampers
FAHAD FATEH
05/07/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
05/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
04/30/2026
Signed off — Alteration
B01305575-I1
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/03/2026
Permit issued — Sprinklers
B80695757-S3-PL
03/27/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01339625-P1
03/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/02/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/29/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01339625-I1
12/29/2025
Permit issued — Supported Scaffold
B01339625-I1-SF
12/23/2025
Signed off — New Building
Structural and foundation work in conjunction with GC filing B01100641-I1
B01100641-S4
12/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUPSTRATE INC07/02/2026
DOB NOWMechanical SystemsSigned-offUPSTRATE INC06/11/2026
DOB NOWSprinklersPermit IssuedPLUMBING WORKS NYC INC04/03/2026
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES LLC12/29/2025
DOB NOWSprinklersPermit IssuedA M B MECHANICAL INC12/11/2025
DOB NOWSprinklersPermit IssuedPRIME PIPING & HEATING IN12/11/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/22/2025
DOB NOWFoundationPermit IssuedSTRUCTURELINE INC07/17/2025
DOB NOWSupport of ExcavationSigned-offSTRUCTURELINE INC07/17/2025
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURELINE INC07/07/2025
DOB NOWConstruction FenceSigned-offYCK DEVELOPERS LLC06/12/2025
DOB NOWStructuralPermit IssuedUPSTRATE INC03/20/2025
DOB NOWSupport of ExcavationSigned-offUPSTRATE INC03/19/2025
DOB NOWGeneral ConstructionPermit IssuedUPSTRATE INC03/19/2025
1 project · most recent 08/04/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2026Permit IssuedUPSTRATE INCHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Daikin RXSQ48TBVJUA 4,800 BTU · Vrf Outdoor ×3
RXSQ36TBVJUA 36,000 BTU · Vrf Outdoor ×1
RXTA48AAVJU 48,000 BTU · Vrf Outdoor ×3
RXTA24AAVJU 24,000 BTU · Vrf Outdoor ×1
RXTA36AAVJU 36,000 BTU · Vrf Outdoor ×1
General Electric AZ65H07DAD 7,000 BTU · Ptac ×2
Heating
King LPW1227 10,500 BTU · Electric Heater ×2
W1215 5,120 BTU · Electric Heater ×2
Qmark MUH0381 3 kW · Electric Heater ×2
1 project · most recent 08/04/2026
Sprinkler System
FiledStatusContractorScope
08/04/2026Permit IssuedPRIME PIPING & HEATING INSprinkler System
1 project · most recent 08/04/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/04/2026Permit IssuedA M B MECHANICAL INCGas, Storm, Water/Sanitary
3 projects · most recent 08/04/2026
General Wiring
FiledStatusContractorScope
08/04/2026Permit IssuedS&R ELECTRICAL & MECHANICGeneral Wiring
10/27/2025CompleteSOLAS ELECTRICAL CORP—
09/08/2025Permit IssuedS&R ELECTRICAL & MECHANIC—
1 project · most recent 08/04/2026
Steel
FiledStatusContractorScope
08/04/2026Permit IssuedUPSTRATE INCSteel
2 projects · most recent 03/27/2026
Scaffold Fence
FiledStatusContractorScope
03/27/2026Signed-offMNK ENTERPRISES LLCScaffold
06/11/2025Signed-offYCK DEVELOPERS LLCFence
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
07/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/02/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/11/2026Pass-Final PL - UndergroundPassView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/02/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/06/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
06/17/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/17/2026Post-installed AnchorsFAHAD FATEHspecial
06/17/2026Sprinkler SystemsFAHAD FATEHspecial
06/17/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/17/2026Maintenance informationFAHAD FATEHenergy_progress
06/17/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/17/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/03/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/03/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
06/03/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/03/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
06/03/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/03/2026Permanent certificateFAHAD FATEHenergy_progress
06/03/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/03/2026Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
06/03/2026MeteringFAHAD FATEHenergy_progress
06/03/2026Fenestration air leakageFAHAD FATEHenergy_progress
06/03/2026Air barrier — testing FAHAD FATEHenergy_progress
06/03/2026Fenestration areasFAHAD FATEHenergy_progress
06/03/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
06/03/2026Interior lighting powerFAHAD FATEHenergy_progress
06/03/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
05/07/2026Ventilation and air distribution systemFAHAD FATEHenergy_progress
05/07/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/07/2026Mechanical SystemsFAHAD FATEHspecial
Latest 25 of 49.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/23/2026B01100641-P2Request digital key ↗
08/23/2026B01100641-P1Request digital key ↗
08/23/2026B01100641-S4Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation2
02/26/2025340915166Open ↗
01/08/2025340915166Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)3
08/23/2026B01100641-I1Open ↗
08/23/2026B01100641-P5Open ↗
08/14/2026B01100641-P3Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/23/2026B01100641-I1Open ↗
08/23/2026B01100641-P5Open ↗
08/14/2026B01100641-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/23/2026B01100641-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/23/2026B01100641-S4Open ↗
08/23/2026B01100641-S3Open ↗
08/23/2026B01100641-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026B01100641-P2Open ↗
08/27/2026B01100641-P2Open ↗
08/25/2026B01100641-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026B01100641-P2Open ↗
08/25/2026B01100641-P4Open ↗
08/23/2026B01100641-S1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/06/2025340915166Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/23/2026B01100641-S1Open ↗
08/23/2026B01100641-I1Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist4
08/23/2026B01100641-S1Open ↗
08/23/2026B01100641-I1Open ↗
08/23/2026B01100641-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off2
08/23/2026B01100641-S1Open ↗
08/23/2026B01100641-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/23/2026B01100641-S1Open ↗
08/23/2026B01100641-I1Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/19/2025340915166Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/19/2025340915166Open ↗
▸BISSTREET TREE CHECKLIST1
01/08/2025340915166Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/23/2026B01100641-S1Open ↗
▸DOB NOWSOIL REPORT1
08/23/2026B01100641-S1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/06/2025340915166Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial4
08/23/2026B01100641-S1Open ↗
08/23/2026B01100641-I1Open ↗
08/23/2026B01100641-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/23/2026B01100641-S1Open ↗
08/23/2026B01100641-I1Open ↗
08/23/2026B01100641-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/23/2026B01100641-I1Open ↗
08/23/2026B01100641-P5Open ↗
08/14/2026B01100641-P3Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/08/2025340915166Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/06/2025340915166Open ↗
▸DOB NOWAdjoining Owners Notification1
08/23/2026B01100641-S4Open ↗