← Back
Stand-alone food establishment
2143 FLATBUSH AVENUE
BROOKLYN · BIN 3427520
💬 Discuss this project
2025Year Built
1Stories
K5Building Class
R3-2Zoning
2,950 sfGross Floor Area
1Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Stand-alone food establishment · Owner of record: KASADA, LLC · 17,450 sf lot · 0.17 FAR built · Flood zone X500
Locations of Work
ArchitectureElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 8 docs
Floor 11 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GEMSTAR CONSTRUCTION303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/27/2023$7.3M—BHRAGS HOME CARE, CORP. → KASADA, LLC— not available
11/05/2019$4.6M—Private party → BHRAGS HOME CARE, CORP.— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PR208/17/2026
SHREMSHOCK801/26/2026
S.E. CONSULTANTS, INC.111/03/2025
BOHLER ENGINEERING NY PLLC.910/07/2025
TITAN ENGINEERS PC207/24/2025
ASHRAF CORP209/13/2024
BOHLER ENGINEERING NY PLLC304/02/2024
TOWER CONSULTING ENGINEERS101/16/2024
SHIRK & O'DONOVAN CONSULTING ENGINE206/19/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEMSTAR CONSTRUCTION CORP.General Contractor108/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WHITESTONE ASSOCIATES ENG81441808/17/2026
Building Lifecycle
All (192)Filed (30)Permit Issued (20)Signed Off (15)Violation (3)Inspection (14)Objection (80)Special Inspection (30)
08/19/2026
Permit issued — Solar
B01318847-I1-SL
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Mudar Khantamr
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mudar Khantamr
08/18/2026
Special inspection requirement — Final
Mudar Khantamr
08/17/2026
Filed — Alteration
FILING HEREWITH INSTALLATION OF SOLAR PANELS ON CANOPY ROOF AS INDICATED ON PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY
B01318847-P1
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mudar Khantamr
08/17/2026
Special inspection requirement — Final
Mudar Khantamr
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Mudar Khantamr
05/05/2026
Signed off — Alteration
FILING HEREWITH DRIVE THRU CANOPY AS INDICATED ON PLANS.
B01306596-I1
03/30/2026
Permit issued — Structural
B01306596-I1-ST
02/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/05/2026
Signed off — New Building
FILING HEREWITH INSTALLATION OF MECHANICAL SYSTEMS WITH ASSOCIATED PIPING AND DUCTWORK
B00889056-S1
01/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Mudar Khantamr
01/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
Mudar Khantamr
01/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
Mudar Khantamr
01/28/2026
Special inspection requirement — Mechanical Systems
Mudar Khantamr
01/28/2026
Special inspection requirement — Final
Mudar Khantamr
01/28/2026
Special inspection requirement — Shutoff dampers
Mudar Khantamr
01/26/2026
Filed — New Building
FILING HEREWITH INSTALLATION OF MECHANICAL SYSTEMS WITH ASSOCIATED PIPING AND DUCTWORK
B00889056-P2
01/21/2026
Special inspection requirement — Air barrier - visual inspection
Mudar Khantamr
01/21/2026
Special inspection requirement — Exterior lighting power
Mudar Khantamr
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Mudar Khantamr
01/21/2026
Special inspection requirement — Vestibules
Mudar Khantamr
01/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Mudar Khantamr
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mudar Khantamr
01/21/2026
Special inspection requirement — Lighting controls
Mudar Khantamr
01/21/2026
Special inspection requirement — Interior lighting power
Mudar Khantamr
01/21/2026
Special inspection requirement — Fenestration air leakage
Mudar Khantamr
01/21/2026
Special inspection requirement — Fenestration areas
Mudar Khantamr
01/21/2026
Special inspection requirement — Maintenance information
Mudar Khantamr
01/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Mudar Khantamr
01/21/2026
Special inspection requirement — Protection of exposed foundation insulation
Mudar Khantamr
01/21/2026
Special inspection requirement — Air barrier continuity plan testing
Mudar Khantamr
01/21/2026
Special inspection requirement — Insulation placement and R values
Mudar Khantamr
01/13/2026
Signed off — Alteration
FILING HEREWITH INSTALLATION OF SPRINKLER SYSTEM AND ASSOCIATED PIPING AS INDICATED ON PLANS.
B00985115-I1
01/09/2026
Filed — New Building
FILING HEREWITH INSTALLATION OF MECHANICAL SYSTEMS WITH ASSOCIATED PIPING AND DUCTWORK
B00889056-P3
01/07/2026
Signed off — Alteration
Filing plans herewith for sitework including pavement, grading and striping. No change to use, egress, or occupancy.
B00889731-I1
12/30/2025
Signed off — Alteration
Filing herewith plans for the installation of sign foundation. No change in use, egress, or occupancy.
B00890065-I1
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mudar Khantamr
12/30/2025
Special inspection requirement — Air barrier - visual inspection
Mudar Khantamr
12/30/2025
Special inspection requirement — Exterior lighting power
Mudar Khantamr
12/23/2025
Signed off — Alteration
Filing herewith plans for the installation of illuminated, non advertising signage. No change to use, egress, or occupancy.
B00890063-I1
12/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/09/2025
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING AS SHOWN ON PLANS
B00892413-I1
12/09/2025
Signed off — Alteration
Filing herewith site plumbing plans associated with the construction of a new building, which includes installation of new on-site inlets, conveyance piping, and an underground retention system. No change to use, egress, or occupancy.
B00889738-I1
12/09/2025
Signed off — Alteration
Underground plumbing associated new building construction
B01255828-I1
12/08/2025
Signed off — Alteration
Filing herewith plans for the installation of a 29' Curb Cut on Flatbush Avenue. No change to use, egress, or occupancy.
B00889753-I1
12/08/2025
Signed off — Alteration
Filing herewith plans for the installation of a 29' curb cut on East 46th Street. No change to use, egress, or occupancy.
B00889757-I1
12/05/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/26/2025
Signed off — Alteration
FILING HEREWITH INSTALLATION OF FOUNDATION for ONE STORY NEW BUILDING (EATING AND DRINKING ESTABLISHMENT)
B00889696-I1
11/21/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
11/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/13/2025
Filed — Alteration
FILING HEREWITH INSTALLATION OF SOLAR PANELS ON CANOPY ROOF AS INDICATED ON PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY
B01318847-I1
11/13/2025
Signed off — Alteration
B00889196-I1
11/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/03/2025
Filed — Alteration
FILING HEREWITH DRIVE THRU CANOPY AS INDICATED ON PLANS.
B01306596-I1
10/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/23/2025
Signed off — Alteration
Filing herewith plans for the installation of a temporary construction fence. No change to use, egress, or occupancy.
B00890066-I1
10/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 192 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedGEMSTAR CONSTRUCTION CORP.08/19/2026
DOB NOWStructuralSigned-offGEMSTAR CONSTRUCTION CORP.03/30/2026
DOB NOWMechanical SystemsSigned-offGEMSTAR CONSTRUCTION CORP.10/09/2025
DOB NOWCurb CutSigned-offGEMSTAR CONSTRUCTION CORP.10/09/2025
DOB NOWCurb CutSigned-offGEMSTAR CONSTRUCTION CORP.10/09/2025
DOB NOWFoundationSigned-offSIGN STAR NYC08/28/2025
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN07/30/2025
DOB NOWSprinklersSigned-offMERCURY FIRE SUPP INC07/25/2025
DOB NOWFoundationSigned-offGEMSTAR CONSTRUCTION CORP.07/16/2025
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN07/16/2025
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN07/15/2025
DOB NOWFoundationSigned-offGEMSTAR CONSTRUCTION CORP.07/10/2025
DOB NOWStructuralSigned-offGEMSTAR CONSTRUCTION CORP.06/24/2025
DOB NOWGeneral ConstructionSigned-offGEMSTAR CONSTRUCTION CORP.06/17/2025
DOB NOWGeneral ConstructionPermit IssuedGEMSTAR CONSTRUCTION CORP.06/16/2025
DOB NOWSignSigned-offSIGNSTAR NYC06/09/2025
DOB NOWConstruction FenceSigned-offGEMSTAR CONSTRUCTION CORP.04/15/2025
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC07/31/2024
DOB NOWSignSigned-offSIGNSTAR NYC05/07/2024
DOB NOWConstruction FenceSigned-offGEMSTAR CONSTRUCTION CORP.03/28/2024
1 project · most recent 01/26/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/26/2026Signed-offGEMSTAR CONSTRUCTION CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Captiveaire CAS-HVAC4-E.-1204-28-30T 7,000 CFM · Rooftop Unit ×5
Ventilation
Captiveaire DU180HFA 2,900 CFM · Kitchen Exhaust ×5
DU50HFA 788 CFM · Kitchen Exhaust ×5
Pennbarry DX11R 300 CFM · Exhaust Fan ×5
7 projects · most recent 09/21/2026
General Wiring
FiledStatusContractorScope
09/21/2026CompleteAMBER ELECTL CONTNG INC—
03/23/2026CompleteMASSARO ELECTRIC CORP.General Wiring
12/26/2025CompletePROFF ELECTRICAL LLC—
12/26/2025CompletePROFF ELECTRICAL LLC—
12/26/2025CompletePROFF ELECTRICAL LLC—
12/26/2025CompletePROFF ELECTRICAL LLC—
07/25/2024CompleteHIGH QUALITY ELECTRIC OF—
1 project · most recent 08/17/2026
FiledStatusContractorScope
08/17/2026Permit IssuedGEMSTAR CONSTRUCTION CORP75 panels, 30 kw
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
02/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/05/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
11/21/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
11/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/24/2025Pass-Final House ConnectionPassView ↗
08/27/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 112
DateRequirementInspectorRole
08/18/2026FinalMudar Khantamrprogress
08/18/2026Fire-Resistant Penetrations and JointsMudar Khantamrspecial
08/18/2026Energy Code Compliance InspectionsMudar Khantamrprogress
08/17/2026Fire-Resistant Penetrations and JointsMudar Khantamrspecial
08/17/2026FinalMudar Khantamrprogress
08/17/2026Energy Code Compliance InspectionsMudar Khantamrprogress
01/28/2026Shutoff dampersMudar Khantamrenergy_progress
01/28/2026HVAC-R and service water piping design and insulationMudar Khantamrenergy_progress
01/28/2026FinalMudar Khantamrprogress
01/28/2026Mechanical SystemsMudar Khantamrspecial
01/28/2026HVAC-R and service water heating system controlsMudar Khantamrenergy_progress
01/28/2026HVAC-R and service water heating equipmentMudar Khantamrenergy_progress
01/21/2026Exterior lighting powerMudar Khantamrenergy_progress
01/21/2026Fire-Resistant Penetrations and JointsMudar Khantamrspecial
01/21/2026Fire-Resistance Rated ConstructionMudar Khantamrprogress
01/21/2026Energy Code Compliance InspectionsMudar Khantamrprogress
01/21/2026Air barrier - visual inspectionMudar Khantamrenergy_progress
01/21/2026VestibulesMudar Khantamrenergy_progress
01/21/2026Fenestration air leakageMudar Khantamrenergy_progress
01/21/2026Maintenance informationMudar Khantamrenergy_progress
01/21/2026Protection of exposed foundation insulationMudar Khantamrenergy_progress
01/21/2026Lighting controlsMudar Khantamrenergy_progress
01/21/2026Fenestration areasMudar Khantamrenergy_progress
01/21/2026Fenestration and door U-factor and product ratingsMudar Khantamrenergy_progress
01/21/2026Interior lighting powerMudar Khantamrenergy_progress
Latest 25 of 112.
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch30
08/27/2026B00889974-I1Request digital key ↗
08/27/2026B00889731-P1Request digital key ↗
08/27/2026B00890063-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026B00890065-P1Open ↗
09/01/2026B00889731-I1Open ↗
09/01/2026B00889731-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/27/2026B00889974-I1Open ↗
08/27/2026B00889731-I1Open ↗
08/27/2026B00889731-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026B00890065-P1Open ↗
09/01/2026B00890065-P1Open ↗
09/01/2026B00889731-I1Open ↗
Showing 3 of 18 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/20/2026B00889056-I1Open ↗
08/20/2026B00889056-P3Open ↗
08/15/2026B00889056-P1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/27/2026B00890065-P1Open ↗
08/27/2026B00890065-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/27/2026B00890065-I1Open ↗
▸DOB NOWHydrant Flow Test Letter1
08/26/2026B00985115-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/20/2026B00889056-I1Open ↗
08/20/2026B00889056-P3Open ↗
08/15/2026B00889056-P1Open ↗
▸DOB NOWFinal Survey1
08/20/2026B00889056-I1Open ↗