← Back
BuildNYC
Walk-up apt, over six families with stores
2145 2ND AVENUE
MANHATTAN · BIN 1052467
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R9AZoning
7,375 sfGross Floor Area
9Units
Rent Stabilized45 Active Violations 31 unresolved · 14 paperwork only 5 likely answered 1 old, status unconfirmed ▸
Walk-up apt, over six families with stores · Owner of record: 2145 Ricardo · 1,894 sf lot · 3.89 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Structural work, 1st floor framing1 filing · 4 docs
CellarBuilding remediationUnder Construction4p · 2 filings · 11 docs
BasementBuilding remediationUnder Construction2p · 1 filing · 7 docs
Filed — no permit issuedTemporary 8' high wood construction fence1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Jce East Harlem 1303/21/2026
2145 Ricardo203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kieran Patrick Spillane105/26/2026
M.S. Savani Architect106/22/2021
Robert Siqeca PE104/24/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arcastle403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.A.C. IndustriesGeneral Contractor109/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106105/26/2026
Building Lifecycle
All (76)Filed (3)Permit Issued (1)Violation (60)Objection (4)Special Inspection (8)
09/28/2026
Permit issued — General Construction
M01370434-I1-GC-CX
06/19/2026
Objection resolved — Resolved
06/11/2026
Objection raised — Scope
05/26/2026
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault removal. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder.
M01370434-I1
05/26/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
05/26/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
05/26/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
05/26/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
05/26/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
05/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
12/03/2025
Violation issued (ECB, closed)
Construction
12/03/2025
Violation issued (ECB, closed)
Construction
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/28/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/28/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/22/2024
Violation issued (HPD, closed)
I
11/15/2023
Violation issued (HPD, closed)
I
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (ECB, closed)
Construction
02/18/2022
Violation issued (ECB, closed)
Construction
02/18/2022
Violation issued (HPD, open)
C
02/18/2022
Violation issued (HPD, closed)
C
02/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2022
Violation issued (HPD, closed)
I
12/20/2021
Violation issued (ECB, closed)
Construction
11/15/2021
Violation issued (ECB, closed)
Construction
11/15/2021
Violation issued (ECB, open)
Plumbing
11/15/2021
Violation issued (ECB, open)
Construction
10/08/2021
Violation issued (ECB, closed)
Construction
10/08/2021
Violation issued (ECB, closed)
Construction
08/20/2021
Violation issued (ECB, closed)
Construction
08/20/2021
Violation issued (ECB, closed)
Construction
06/22/2021
Filed — Alteration
HEREWITH TO PROPOSE TEMPORARY 8' HIGH WOOD CONSTRUCTION FENCE. NO CHANGES IN OCCUPANCY, USE, GROUP OR EGRESS UNDER THIS APPLICATION.
M00502358-I1
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/20/2021
Violation issued (ECB, closed)
Construction
04/20/2021
Violation issued (ECB, closed)
Construction
04/01/2021
Violation issued (HPD, closed)
I
03/31/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/08/2021
Violation issued (ECB, closed)
Construction
03/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2021
Violation issued (ECB, open)
Construction
02/24/2021
Violation issued (ECB, closed)
Construction
02/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/07/2021
Violation issued (ECB, open)
Construction
12/18/2020
Violation issued (HPD, open)
B
12/09/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/03/2020
Violation issued (ECB, open)
Construction
12/03/2020
Violation issued (ECB, closed)
Construction
12/03/2020
Violation issued (ECB, closed)
Construction
12/03/2020
Violation issued (ECB, closed)
Construction
12/03/2020
Violation issued (ECB, open)
Construction
12/03/2020
Violation issued (ECB, closed)
Construction
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedC.A.C. Industries09/28/2026
BISFPISSUEDMaster Fire Systems12/12/2008
BIS—ISSUEDGoldsmith Construction03/25/2008
BISFPISSUEDMaster Fire Systems04/07/2006
BISPLISSUEDCatman Plumbing11/08/2004
BISPLISSUEDCatman Plumbing01/23/2004
BISFPISSUEDMaster Fire Systems01/15/2004
BISOTISSUEDGeo Construction C or All Tenc. Art01/14/2004
BISPLISSUEDTheodorewagner Plumbing Heating01/02/2002
BIS—ISSUEDGeometic Construction01/02/2002
BISOTISSUEDGeometric Construction10/24/2000
BISEQISSUEDGeometric Construction Corp`09/08/2000
2 projects · most recent 05/26/2026
Steel Concrete Masonry
FiledStatusContractorScope
05/26/2026Permit IssuedC.A.C. Industries1 scope_items
04/24/2020——Steel, Concrete, Masonry
1 project · most recent 06/22/2021
Fence
FiledStatusContractorScope
06/22/2021——Fence
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
05/26/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
05/26/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
05/26/2026Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
05/26/2026Post-installed AnchorsGEORGE GHEBRYALspecial
05/26/2026Subgrade InspectionsGEORGE GHEBRYALspecial
05/13/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
03/11/2026FinalGEORGE GHEBRYALprogress
03/11/2026Footing and FoundationGEORGE GHEBRYALprogress
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
09/03/2026M00502358-I1Request digital key ↗
08/15/2026M01370434-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00330460-I1Request digital key ↗
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION18
07/28/2025123586716Open ↗
03/13/2023123586716Open ↗
05/26/2021123586716Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION2
05/12/2009120007303Open ↗
12/15/2008110388143Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/26/2010120007303Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
05/21/2021123586716Open ↗
05/21/2021123586716Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/23/2021123586716Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/23/2021123586716Open ↗
▸BISZONING DIAGRAM1
06/14/2021123586716Open ↗
▸Seals & Professional Certifications15
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/07/2020123586716Open ↗
06/18/2018123586716Open ↗
01/26/2010120007303Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026M01370434-I1Open ↗
08/13/2026M00330460-I1Open ↗
08/13/2026M00502358-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/29/2015140393820Open ↗
08/27/2015140393857Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/29/2015140393820Open ↗
08/27/2015140393857Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/29/2015140393820Open ↗
08/27/2015140393857Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
10/08/2026M01370434-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
10/08/2026M01370434-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
05/20/2021123586716Open ↗
08/27/2015140393857Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/18/2018123586716Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/16/2018123586716Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
04/23/2021123586716Open ↗
06/18/2018123586716Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00330460-I1Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/23/2021123586716Open ↗
09/29/2015140393820Open ↗
08/27/2015140393857Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026M01370434-I1Open ↗
08/13/2026M00330460-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/10/2009120007303Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/18/2008110388143Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/18/2018123586716Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/27/2015140393857Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
04/23/2021123586716Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/27/2015140393857Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/29/2015140393820Open ↗
09/29/2015140393820Open ↗
09/29/2015140393820Open ↗
Showing 3 of 4 on file for this type
▸BISSOIL REPORT1
09/29/2015140393820Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
09/29/2015140393820Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
05/21/2021123586716Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE3
03/12/2021123586716Open ↗
07/08/2020123586716Open ↗
06/18/2018123586716Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/10/2009120007303Open ↗
11/18/2008110388143Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
05/21/2021123586716Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/21/2021123586716Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/26/2010120007303Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
09/29/2015140393820Open ↗
09/23/2015122528050Open ↗
08/27/2015140393857Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
04/23/2021123586716Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
12/07/2020123586716Open ↗
08/16/2018123586716Open ↗
06/18/2018123586716Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/29/2015140393820Open ↗
08/27/2015140393857Open ↗
▸Other Documents2
▸DOB NOWGeotechnical Peer Review Report (BC 1818)1
08/15/2026M01370434-I1Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
08/15/2026M01370434-I1Open ↗