← Back
Walk-up apt, over six families with stores
2146 2 AVENUE
MANHATTAN · BIN 1052856
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
R9AZoning
11,212 sfGross Floor Area
18Units
Rent Stabilized0 Open Violations
Walk-up apt, over six families with stores · Owner of record: 2146-48 SECOND AVENUE DE LLC · 2,592 sf lot · 4.33 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 3 docs
Floor 54p · 1 filing · 2 docs
Floor 44p · 1 filing · 2 docs
Floor 34p · 1 filing · 2 docs
Floor 24p · 1 filing · 2 docs
Floor 1Under Construction5p · 2 filings · 5 docs
CellarUnder Construction1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BULLS EYE CONTRACTOR503/22/2026
THE DRIVIN GROUP503/22/2026
2146-48 SECOND AVENUE DE LLC503/22/2026
2146-48 2ND AVE203/21/2026
T-MOBILE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KIERAN PATRICK SPILLANE106/01/2026
ARQUITECTURA VARELA209/26/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BULLS EYE CONTRACTOR INCGeneral Contractor603/21/2026
ROBERT CHIMENTIElectrical103/21/2026
C.A.C. INDUSTRIES, INCGeneral Contractor107/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106106/01/2026
Building Lifecycle
All (22)Filed (3)Permit Issued (3)Violation (14)Objection (2)
07/29/2026
Permit issued — Foundation
M01302224-I1-GC-CX
06/23/2026
Objection resolved — Addressed
06/16/2026
Objection raised — Scope
06/01/2026
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening. Brick repair as per plans herewith.
M01302224-I1
04/29/2026
Violation issued (HPD, closed)
A
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
08/08/2023
Violation issued (HPD, closed)
C
03/15/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
10/07/2022
Permit issued — General Construction
M08008868-I1-GC
09/26/2022
Filed — Alteration
PATCHING STUCCO AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY WITH THIS APPLICATION.
M08008868-I1
08/30/2022
Permit issued — Sidewalk Shed
M07995181-I1-SH
08/29/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M07995181-I1
02/15/2022
Violation issued (HPD, closed)
A
04/17/2019
Violation issued (ECB, closed)
Plumbing
04/17/2019
Violation issued (ECB, closed)
Construction
10/05/2018
Violation issued (HPD, closed)
I
11/06/2017
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (HPD, closed)
I
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedC.A.C. INDUSTRIES, INC07/29/2026
DOB NOWGeneral ConstructionPermit IssuedBULLS EYE CONTRACTOR INC10/07/2022
DOB NOWSidewalk ShedPermit IssuedBULLS EYE CONTRACTOR INC08/30/2022
BISOTISSUEDTELCOM ENGINEERING GP INC09/11/2015
BISOTISSUEDTRANSCEND WIRELESS LLC10/29/2010
BISFPISSUEDWILLIAM HIRD & CO INC09/03/2010
BISOTISSUEDBCI COMMUNICATION INC02/27/2008
BISFPISSUEDMASTER FIRE SYSTEMS, INC11/07/2007
1 project · most recent 07/19/2021
FiledStatusContractorScope
07/19/2021Permit IssuedROBERT CHIMENTI18 meters, 1 new_meters
1 project · most recent 06/01/2026
Masonry
FiledStatusContractorScope
06/01/2026Permit IssuedC.A.C. INDUSTRIES, INCMasonry
1 project · most recent 08/29/2022
Sidewalk Shed
FiledStatusContractorScope
08/29/2022Permit IssuedBULLS EYE CONTRACTOR INCSidewalk Shed
Nothing on file for this building.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026M07995181-I1Request digital key ↗
09/01/2026M08008868-I1Request digital key ↗
08/14/2026M01302224-I1Request digital key ↗
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION6
09/23/2015122467400Open ↗
11/03/2010120476966Open ↗
09/08/2010120427788Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
09/04/2015122467400Open ↗
11/03/2010120476966Open ↗
09/21/2010120476966Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
01/06/2016122467400Open ↗
09/04/2015122467400Open ↗
09/21/2010120476966Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026M07995181-I1Open ↗
09/01/2026M08008868-I1Open ↗
08/17/2026M01302224-I1Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY1
02/20/2008110102772Open ↗
▸BISPC FULL REPORT1
10/25/2007110002719Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/03/2010120427788Open ↗
▸Environmental & Asbestos9
▸BISTHIS IS NOT AN ASBESTOS PROJECT6
11/03/2010120476966Open ↗
02/20/2008110102772Open ↗
02/20/2008110102772Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/04/2015122467400Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/03/2010120476966Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026M01302224-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/06/2016122467400Open ↗
09/04/2015122467400Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/06/2016122467400Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS4
09/21/2010120476966Open ↗
08/05/2010120427788Open ↗
02/20/2008110102772Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/06/2016122467400Open ↗
07/30/2008110102772Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/06/2016122467400Open ↗
07/26/2008110102772Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
01/06/2016122467400Open ↗
09/04/2015122467400Open ↗
09/21/2010120476966Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
09/04/2015122467400Open ↗
08/05/2010120427788Open ↗