Bungalow colony - cooperatively owned land
Breezy Point Cooperative
215-10 OCEANSIDE AVENUE · BIN 4619748
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered64 Active Violations 6 unresolved · 58 paperwork only ▸
Bungalow colony - cooperatively owned land · Owner of record: Breezy Point Cooperative · 12,253,428 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofDemolition of house of worshipUnder Construction15p · 4 filings · 18 docs
Floor 1St Edmund's Church Plumbing WorkUnder Construction24p · 8 filings · 20 docs
Site & exteriorSt Edmund's Church Plumbing WorkUnder Construction10p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rocklyn Asset1107/08/2026
Breezy Point Co-OP303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLM Engineering509/22/2026
Ocean Enterprises301/03/2026
KWHC Consulting Engineering112/22/2025
JWM Group105/20/2025
Diproperzio & Mallia Architects106/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Quickfast1403/21/2026
Archetype Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Naccarato ContractingGeneral Contractor404/11/2026
McPhee & Son PL-HT-CLPlumbing207/08/2026
Rite Way HeatingPlumbing207/08/2026
R. Donovan & Son ElectricElectrical103/22/2026
Naccarato ContractingScaffold104/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
The Ordering Force9406609/22/2026
AA Building & Inspection1519105/20/2025
Building Lifecycle
All (59)Filed (11)Permit Issued (9)Signed Off (2)Violation (5)Inspection (3)Special Inspection (29)
10/05/2026
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
09/22/2026
Filed — Alteration
These drawings and specifications are for the installation of a gas fired water boiler at 215-10 Oceanside Ave, Breezy Point.
Q01330724-P1
09/22/2026
Filed — Alteration
These drawings and specifications are for the installation of four electric hot water heaters as well as domestic water, sanitary, and gas piping.
Q01330588-P2
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Khaled Mohamed
08/20/2026
Special inspection requirement — Heating Systems
Khaled Mohamed
08/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Khaled Mohamed
08/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Khaled Mohamed
08/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Khaled Mohamed
08/20/2026
Special inspection requirement — Maintenance information
Khaled Mohamed
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Khaled Mohamed
08/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Khaled Mohamed
08/20/2026
Special inspection requirement — Maintenance information
Khaled Mohamed
08/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Khaled Mohamed
08/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Khaled Mohamed
06/18/2026
Signed off — Alteration
Structural work on the roof and ground floor as indicated on drawings. Application filed to remove V041925CCER04JM and V041925CCER05JM.
Q01226805-I1
03/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/29/2026
Permit issued — Boiler Equipment
Q01330724-I1-BE
01/29/2026
Permit issued — Plumbing
Q01330588-I1-PL
01/22/2026
Permit issued — Structural
Q01330536-I1-GC-CX
01/22/2026
Permit issued — Mechanical Systems
Q01330653-I1-MS
01/22/2026
Permit issued — General Construction
Q01339413-I1-GC
01/03/2026
Filed — Alteration
Q01339413-I1
12/22/2025
Filed — Alteration
New facade wall to seal the wall opening after the demolition
Q01330536-I1
12/19/2025
Filed — Alteration
These drawings and specifications are for the installation of a gas fired water boiler at 215-10 Oceanside Ave, Breezy Point.
Q01330724-I1
12/15/2025
Filed — Alteration
These drawings and specifications are for the installation of four electric hot water heaters as well as domestic water, sanitary, and gas piping.
Q01330588-I1
12/15/2025
Filed — Alteration
These drawings and specifications are for the installation of 1 new rooftop unit, 1 heat pump unit, 7 air handling units, 3-bathroom exhaust fans and associated piping and ductwork.
Q01330653-I1
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Khaled Mohamed
12/08/2025
Special inspection requirement — Heating Systems
Khaled Mohamed
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Khaled Mohamed
12/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Khaled Mohamed
12/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Khaled Mohamed
12/08/2025
Special inspection requirement — Maintenance information
Khaled Mohamed
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Khaled Mohamed
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Khaled Mohamed
12/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Khaled Mohamed
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Khaled Mohamed
12/08/2025
Special inspection requirement — Maintenance information
Khaled Mohamed
10/31/2025
Filed — Alteration
General construction and temporary bracing to partially demolish portions of existing one-story house of worship at the first floor and roof.
Q01310993-I1
10/30/2025
Special inspection requirement — Wood – Seismic Resistance
Withdrawn
10/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Withdrawn
10/30/2025
Special inspection requirement — Final
Khaled Mohamed
07/07/2025
Permit issued — Construction Fence
Q01250220-I1-FN
07/03/2025
Filed — Alteration
Install temporary wood fence approximately 550LF to be removed only after completion of all work
Q01250220-I1
06/03/2025
Permit issued — Structural
Q01226805-I1-ST
05/20/2025
Filed — Alteration
Structural work on the roof and ground floor as indicated on drawings. Application filed to remove V041925CCER04JM and V041925CCER05JM.
Q01226805-I1
05/20/2025
Special inspection requirement — Wood – Seismic Resistance
Younes Abouyaala
05/15/2025
Special inspection requirement — Final
NAVEEN KUMAR
05/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
05/15/2025
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
04/23/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/23/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/21/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/19/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/19/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/03/2021
Signed off — Alteration
Q00353453-I1
01/13/2021
Permit issued — Plumbing
Q00353453-I1-PL
07/15/2020
Permit issued — Plumbing
Q00353453-I1-PL
06/02/2020
Filed — Alteration
Q00353453-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedLS Plumbing01/29/2026
DOB NOWPlumbingPermit IssuedLS Plumbing01/29/2026
DOB NOWStructuralPermit IssuedNaccarato Contracting01/22/2026
DOB NOWMechanical SystemsPermit IssuedNaccarato Contracting01/22/2026
DOB NOWGeneral ConstructionPermit IssuedNaccarato Contracting01/22/2026
DOB NOWConstruction FencePermit IssuedNaccarato Contracting07/07/2025
DOB NOWStructuralSigned-offNaccarato Contracting06/03/2025
DOB NOWPlumbingSigned-offBraterlyn Enterprises Dba01/13/2021
DOB NOWPlumbingSigned-offBraterlyn Enterprises Dba07/15/2020
BISOTISSUEDDesign Tech Contracting08/29/2020
BISOTISSUEDDesign Tech Contracting08/21/2020
BISOTISSUEDDesign Tech Contracting08/21/2020
BISOTISSUEDDesign Tech Contracting08/21/2020
BISOTISSUEDDesign Tech Contracting10/09/2019
BISPLISSUEDMcPhee & Son PL-HT-CL04/26/2019
BISOTISSUEDDesign Tech Contracting04/23/2019
1 project · most recent 12/15/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/15/2025Permit IssuedNaccarato ContractingHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXMQ96MVJU 96,000 BTU · Vrf Indoor ×2
FXZQ07MVJU9 7,500 BTU · Vrf Indoor ×2
FXZQ12MVJU9 12,000 BTU · Vrf Indoor ×2
DSPH15B 185,000 BTU · Rooftop Unit ×1
FXMQ24PBVJU 24,000 BTU · Vrf Indoor ×1
RXYQ240AATJA 228,000 BTU · Vrf Outdoor ×1
Ventilation
Captiveaire CFA-D50-CA 70 CFM · Exhaust Fan ×3
1 project · most recent 09/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/22/2026Permit IssuedRite Way HeatingGas, Water/Sanitary
3 projects · most recent 11/26/2025
General Wiring
FiledStatusContractorScope
11/26/2025CompleteEmpire State ElectlGeneral Wiring
10/31/2025CompleteEmpire State Electl—
05/16/2019CompleteR. Donovan & Son ElectricGeneral Wiring
3 projects · most recent 12/22/2025
Wood Concrete Steel
FiledStatusContractorScope
12/22/2025Permit IssuedNaccarato ContractingConcrete, Wood
10/31/2025——Wood
05/20/2025Signed-offNaccarato ContractingSteel, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/05/2026No Access-Final Boiler Equipment InspectionNo AccessView ↗
03/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
08/20/2026Fire-Resistant Penetrations and JointsKhaled Mohamedspecial
08/20/2026Heating SystemsKhaled Mohamedspecial
08/20/2026HVAC-R and service water heating system controlsKhaled Mohamedenergy_progress
08/20/2026HVAC-R and service water heating equipmentKhaled Mohamedenergy_progress
08/20/2026HVAC-R and service water piping design and insulationKhaled Mohamedenergy_progress
08/20/2026Maintenance informationKhaled Mohamedenergy_progress
08/20/2026Fire-Resistant Penetrations and JointsKhaled Mohamedspecial
08/20/2026Energy Code Compliance InspectionsKhaled Mohamedprogress
08/20/2026Maintenance informationKhaled Mohamedenergy_progress
08/20/2026HVAC-R and service water piping design and insulationKhaled Mohamedenergy_progress
08/20/2026HVAC-R and service water heating equipmentKhaled Mohamedenergy_progress
12/08/2025Fire-Resistant Penetrations and JointsKhaled Mohamedspecial
12/08/2025Heating SystemsKhaled Mohamedspecial
12/08/2025HVAC-R and service water heating equipmentKhaled Mohamedenergy_progress
12/08/2025HVAC-R and service water piping design and insulationKhaled Mohamedenergy_progress
12/08/2025HVAC-R and service water heating system controlsKhaled Mohamedenergy_progress
12/08/2025Maintenance informationKhaled Mohamedenergy_progress
12/08/2025Fire-Resistant Penetrations and JointsKhaled Mohamedspecial
12/08/2025Energy Code Compliance InspectionsKhaled Mohamedprogress
12/08/2025HVAC-R and service water piping design and insulationKhaled Mohamedenergy_progress
12/08/2025HVAC-R and service water heating equipmentKhaled Mohamedenergy_progress
12/08/2025Maintenance informationKhaled Mohamedenergy_progress
10/30/2025Wood – Seismic ResistanceWithdrawnspecial
10/30/2025Structural Stability – Alterations of existing buildingsWithdrawnspecial
10/30/2025FinalKhaled Mohamedprogress
Latest 25 of 29.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/20/2026Q01226805-I1Request digital key ↗
08/19/2026Q01250220-I1Request digital key ↗
08/18/2026Q01310993-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00353453-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
06/03/2020440535805Open ↗
04/09/2019440535805Open ↗
▸BISWORK PERMIT APPLICATION1
04/26/2019440535805Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
04/09/2019440535805Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature12
10/04/2026Q01330588-P2Open ↗
10/04/2026Q01330588-P2Open ↗
10/04/2026Q01330588-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
10/04/2026Q01330588-P2Open ↗
10/04/2026Q01330724-P1Open ↗
08/28/2026Q00353453-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
10/04/2026Q01330588-P2Open ↗
10/04/2026Q01330724-P1Open ↗
10/04/2026Q01330724-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/09/2019440535805Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/09/2019440535805Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/09/2019440535805Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
04/09/2019440535805Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
04/09/2019440535805Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
10/04/2026Q01330588-P2Open ↗
10/04/2026Q01330724-P1Open ↗
08/20/2026Q01226805-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/09/2019440535805Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/28/2026Q00353453-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/05/2021440535805Open ↗
04/09/2019440535805Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/05/2021440535805Open ↗
▸BISNYCECC ANALYSIS1
04/09/2019440535805Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/09/2019440535805Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/05/2021440535805Open ↗
04/09/2019440535805Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01330536-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01330536-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISResponse to Intent to Revoke Letter1
05/09/2019440535805Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/04/2021440535805Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/28/2026Q00353453-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/05/2021440535805Open ↗
04/09/2019440535805Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
05/09/2019440535805Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/09/2019440535805Open ↗
▸Other Documents2
▸BISSupporting Document: Fee Exempt1
05/09/2019440535805Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
04/09/2019440535805Open ↗