← Back
BuildNYC
Two stories - detached, small or mid-size
215-19 38TH AVENUE
QUEENS · Bayside · BIN 4136687
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3XZoning
1,602 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 19 NY Garden · 5,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
AtticUnder Construction11p · 1 filing · 20 docs
Floor 2Under Construction17p · 2 filings · 20 docs
Floor 1Under Construction17p · 2 filings · 20 docs
CellarUnder Construction18p · 2 filings · 20 docs
Site & exteriorConstruction fence installationUnder Construction4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
19 NY Garden2210/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/07/2025$1.1M—THE REGINA E. LYNCH TRUST → 19 NY Garden$699/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mehdi Ghazi, P.E609/01/2026
Mei Architect107/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mei Architect1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L Construction DevelopmentGeneral Contractor1107/08/2026
L&L Construction DevelopmentScaffold207/08/2026
Plumbing NYCPlumbing109/18/2026
Wasoff Plumbing & Utility CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mehdi Ghazi, P.E7129509/01/2026
Triangle Inspection & Tes7495209/01/2026
Building Lifecycle
All (62)Filed (8)Permit Issued (9)Signed Off (1)Violation (3)Inspection (3)Objection (8)Special Inspection (30)
09/17/2026
Permit issued — Plumbing
Q14361364-S3-PL
09/10/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/01/2026
Filed — New Building
INSTALLATION OF SOE AND FOUNDATION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01253280-P2
08/14/2026
Violation issued (ECB, closed)
Unknown
08/14/2026
Violation issued (ECB, closed)
Construction
07/30/2026
Filed — New Building
INSTALLATION OF SOE AND FOUNDATION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01253280-S5
05/29/2026
Permit issued — Plumbing
Q01253280-S3-PL
05/14/2026
Permit issued — Construction Fence
Q01233015-I1-FN
12/16/2025
Violation issued (ECB, closed)
Construction
10/31/2025
Permit issued — General Construction
Q01253280-I1-GC
10/30/2025
Permit issued — Foundation
Q01253280-S1-FO-EA
10/30/2025
Permit issued — Structural
Q01253280-S2-ST
10/30/2025
Permit issued — General Construction
Q01253280-I1-MS
10/24/2025
Signed off — Full Demolition
FULL DEMOLITION OF EXISTING 2-1/2 STORY DETACHED BUILDING.
Q01240262-I1
10/13/2025
Filed — New Building
INSTALLATION OF SOE AND FOUNDATION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01253280-S3
10/13/2025
Filed — New Building
INSTALLATION OF SOE AND FOUNDATION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01253280-S1
10/13/2025
Filed — New Building
INSTALLATION OF SOE AND FOUNDATION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01253280-S2
10/10/2025
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
10/10/2025
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
10/10/2025
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
10/10/2025
Special inspection requirement — Structural Steel - Welding
MEHDI GHAZI
10/10/2025
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
10/10/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
10/10/2025
Special inspection requirement — Subgrade Inspections
MEHDI GHAZI
10/10/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
10/10/2025
Special inspection requirement — Masonry
MEHDI GHAZI
10/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
10/09/2025
Special inspection requirement — Final
MEHDI GHAZI
10/09/2025
Special inspection requirement — Final
MEHDI GHAZI
10/09/2025
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
10/07/2025
Permit issued — Full Demolition
Q01240262-I1-FD
09/26/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
09/02/2025
Objection resolved — Addressed
09/02/2025
Objection resolved — Addressed
07/29/2025
Objection raised — Admin
07/29/2025
Objection raised — Admin
07/29/2025
Objection raised — Scope
07/29/2025
Objection raised — Zoning
07/18/2025
Filed — New Building
INSTALLATION OF SOE AND FOUNDATION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01253280-I1
07/18/2025
Special inspection requirement — Interior lighting power
MEHDI GHAZI
07/18/2025
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
07/18/2025
Special inspection requirement — Air barrier — testing
MEHDI GHAZI
07/18/2025
Special inspection requirement — Fenestration areas
MEHDI GHAZI
07/18/2025
Special inspection requirement — Permanent certificate
MEHDI GHAZI
07/18/2025
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
07/18/2025
Special inspection requirement — Metering
MEHDI GHAZI
07/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
07/18/2025
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
07/18/2025
Special inspection requirement — Maintenance information
MEHDI GHAZI
07/18/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
07/18/2025
Special inspection requirement — Heating Systems
MEHDI GHAZI
07/18/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
07/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
07/18/2025
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
07/18/2025
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
07/10/2025
Filed — Full Demolition
FULL DEMOLITION OF EXISTING 2-1/2 STORY DETACHED BUILDING.
Q01240262-I1
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPlumbing NYC09/17/2026
DOB NOWPlumbingPermit IssuedWasoff Plumbing & Utility Co05/29/2026
DOB NOWConstruction FencePermit IssuedL&L Construction Development05/14/2026
DOB NOWGeneral ConstructionPermit IssuedL&L Construction Development10/31/2025
DOB NOWFoundationPermit IssuedL&L Construction Development10/30/2025
DOB NOWStructuralPermit IssuedL&L Construction Development10/30/2025
DOB NOWGeneral ConstructionPermit IssuedL&L Construction Development10/30/2025
DOB NOWFull DemolitionSigned-offL&L Construction Development10/07/2025
DOB NOWConstruction FencePermit IssuedL&L Construction Development06/12/2025
1 project · most recent 09/01/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/01/2026Permit IssuedL&L Construction DevelopmentHeating and Air Conditioning Systems
Heat / Cool
Midea DLCURAH60AAK 57,000 BTU · Heat Pump Outdoor ×5
1 project · most recent 09/01/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/01/2026Permit IssuedWasoff Plumbing & Utility CoStorm, Water/Sanitary
1 project · most recent 06/15/2026
General Wiring
FiledStatusContractorScope
06/15/2026Permit IssuedKJK ElectricGeneral Wiring
1 project · most recent 09/01/2026
Steel Masonry Wood
FiledStatusContractorScope
09/01/2026Permit IssuedWasoff Plumbing & Utility CoSteel, Masonry, Wood
1 project · most recent 05/29/2025
Fence
FiledStatusContractorScope
05/29/2025Permit IssuedL&L Construction DevelopmentFence
1 project · most recent 09/01/2026
Earthwork
FiledStatusContractorScope
09/01/2026Permit IssuedWasoff Plumbing & Utility CoEarthwork
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/10/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
10/10/2025Structural Wood FrameMEHDI GHAZIprogress
10/10/2025Structural Steel - DetailsMEHDI GHAZIspecial
10/10/2025Structural Steel - High Strength BoltingMEHDI GHAZIspecial
10/10/2025Structural Steel - WeldingMEHDI GHAZIspecial
10/10/2025Concrete - Cast-In-PlaceMEHDI GHAZIspecial
10/10/2025Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
10/10/2025Subgrade InspectionsMEHDI GHAZIspecial
10/10/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
10/10/2025MasonryMEHDI GHAZIspecial
10/10/2025Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
10/09/2025FinalMEHDI GHAZIprogress
10/09/2025FinalMEHDI GHAZIprogress
10/09/2025Footing and FoundationMEHDI GHAZIprogress
07/18/2025Interior lighting powerMEHDI GHAZIenergy_progress
07/18/2025Insulation placement and R valuesMEHDI GHAZIenergy_progress
07/18/2025Air barrier — testing MEHDI GHAZIenergy_progress
07/18/2025Fenestration areasMEHDI GHAZIenergy_progress
07/18/2025Permanent certificateMEHDI GHAZIenergy_progress
07/18/2025Air barrier - visual inspectionMEHDI GHAZIenergy_progress
07/18/2025MeteringMEHDI GHAZIenergy_progress
07/18/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
07/18/2025Ventilation and air distribution systemMEHDI GHAZIenergy_progress
07/18/2025Maintenance informationMEHDI GHAZIenergy_progress
07/18/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/18/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
Latest 25 of 37.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026Q01233015-I1Request digital key ↗
08/19/2026Q01240262-I1Request digital key ↗
08/18/2026Q01253280-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01253280-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01253280-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q01233015-I1Open ↗
08/18/2026Q01253280-S5Open ↗
08/13/2026Q01253280-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/03/2026Q01253280-S2Open ↗
09/23/2026Q01253280-I1Open ↗
09/23/2026Q01253280-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
10/03/2026Q01253280-S2Open ↗
09/23/2026Q01253280-I1Open ↗
09/23/2026Q01253280-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01253280-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01240262-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01240262-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q01240262-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01240262-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01253280-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01253280-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026Q01240262-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01240262-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01253280-I1Open ↗
08/13/2026Q01253280-S1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026Q01253280-S1Open ↗
08/13/2026Q01253280-I1Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification2
08/19/2026Q01240262-I1Open ↗
08/13/2026Q01253280-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01240262-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01253280-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01240262-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01240262-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01253280-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01253280-S1Open ↗