← Back
Primarily 5-6 family with 1 store or office
215 2 AVENUE
MANHATTAN · BIN 1006910
💬 Discuss this project
1900Year Built
5Stories
S5Building Class
C1-6AZoning
8,507 sfGross Floor Area
7Units
Rent Stabilized11 Open Violations 9 unresolved · 2 paperwork only ▸
Primarily 5-6 family with 1 store or office · Owner of record: UKRAINIAN ORTHODOX FEDERAL CREDIT UNION · 2,262 sf lot · 3.76 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar2p · 1 filing · 10 docs
Nothing on file for this building.
Building Lifecycle
All (54)Filed (2)Permit Issued (2)Violation (39)Inspection (1)Special Inspection (10)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/04/2025
Violation issued (HPD, open)
A
05/01/2025
Special inspection requirement — Heating Systems
Dmitry Levin
05/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
05/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
Dmitry Levin
05/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
Dmitry Levin
05/01/2025
Special inspection requirement — Maintenance information
Dmitry Levin
04/22/2025
Filed — Alteration
REPLACE EXISTING GAS STEAM BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00688726-P1
04/10/2025
Special inspection requirement — Heating Systems
Dmitry Levin
04/10/2025
Special inspection requirement — Maintenance information
Dmitry Levin
04/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Dmitry Levin
04/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
04/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Dmitry Levin
04/09/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/05/2025
Violation issued (ECB, closed)
Boilers
01/23/2025
Permit issued — Boiler Equipment
M00688726-I1-BE
11/22/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2024
Violation issued (HPD, open)
A
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2023
Violation issued (HPD, closed)
A
12/08/2022
Permit issued — Boiler Equipment
M00688726-I1-BE
07/06/2022
Filed — Alteration
REPLACE EXISTING GAS STEAM BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00688726-I1
02/15/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (HPD, closed)
I
02/24/2015
Violation issued (HPD, closed)
C
02/02/2015
Violation issued (HPD, closed)
I
12/03/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/03/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/13/2014
Violation issued (ECB, closed)
Construction
09/13/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/13/2014
Violation issued (ECB, closed)
Construction
08/22/2000
Violation issued (HPD, open)
B
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/05/1993
Violation issued (HPD, open)
C
05/18/1989
Violation issued (HPD, open)
C
12/08/1988
Violation issued (ECB, open)
Construction
07/25/1988
Violation issued (ECB, open)
Construction
05/13/1986
Violation issued (HPD, open)
C
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UKRAINIAN NATIONAL FEDERAL CREDIT U507/08/2026
UKRAINIAN ORTHODOX FEDERAL CREDIT UNION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC204/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NICE PLUMBING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEVIN ENGINEERING PLLC1267204/22/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offNICE PLUMBING CORP01/23/2025
DOB NOWBoiler EquipmentSigned-offNICE PLUMBING CORP12/08/2022
BISOTISSUEDDREAM CITY CONSTRUCTION05/31/2019
BISOTISSUEDDREAM CITY CONSTRUCTION11/30/2018
BIS—ISSUEDVAS & SONS CORP06/12/2014
BISPLISSUEDNEW YORK STANDARD MECH CORP10/26/2012
BISSPISSUEDMANHATTAN AUTOMATIC SPRNKLER COR04/16/1997
BISSPISSUEDTMS PLUMBING & HTG CORP10/06/1995
BISPLISSUEDZARA PLUMBING CORP08/03/1995
BISMHISSUEDJCO ENTERPRISES INC.08/01/1995
BISOTISSUEDJCO ENTERPRISES INC.08/01/1995
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/09/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/01/2025Heating SystemsDmitry Levinspecial
05/01/2025HVAC-R and service water piping design and insulation—energy_progress
05/01/2025HVAC-R and service water heating system controlsDmitry Levinenergy_progress
05/01/2025HVAC-R and service water heating equipmentDmitry Levinenergy_progress
05/01/2025Maintenance informationDmitry Levinenergy_progress
04/10/2025Heating SystemsDmitry Levinspecial
04/10/2025Maintenance informationDmitry Levinenergy_progress
04/10/2025HVAC-R and service water heating equipmentDmitry Levinenergy_progress
04/10/2025HVAC-R and service water piping design and insulation—energy_progress
04/10/2025HVAC-R and service water heating system controlsDmitry Levinenergy_progress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026M00688726-I1Request digital key ↗
08/24/2026M00688726-P1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
06/03/2019123892715Open ↗
04/24/2019123892715Open ↗
11/23/2018123489144Open ↗
▸BISWORK PERMIT APPLICATION2
06/03/2019123892715Open ↗
11/30/2018123489144Open ↗
▸Seals & Professional Certifications12
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/24/2019123892715Open ↗
11/23/2018123489144Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/24/2019123892715Open ↗
11/23/2018123489144Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/24/2019123892715Open ↗
11/23/2018123489144Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026M00688726-I1Open ↗
08/24/2026M00688726-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026M00688726-I1Open ↗
08/22/2026M00688726-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026M00688726-I1Open ↗
08/22/2026M00688726-P1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/24/2019123892715Open ↗
11/23/2018123489144Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
04/24/2019123892715Open ↗
11/23/2018123489144Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/24/2019123892715Open ↗
11/23/2018123489144Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026M00688726-I1Open ↗
08/24/2026M00688726-P1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/24/2019123892715Open ↗
11/23/2018123489144Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/24/2019123892715Open ↗
11/23/2018123489144Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
04/24/2019123892715Open ↗
11/23/2018123489144Open ↗