ECB10/01/2025Full stop work order existing and active. Full stop work order sticker was posted on 09/04/2025 by badge number 2647 at front entry door. However, observed at the time of inspection stop work order sticker has$25K due
ECB10/01/2025Observed in the driveway construction debris piled up containing wood pallets, sheet rocks plastic buckets, wood studs accessible to the public., repair and/replace$12K due
ECB09/04/2025Construction permit number q 01236781-gc issued 6/12/2025 and expires: 09/03/2025. Observed 2 construction workers busy putting up the new sheet rocks along with the sealing compounds. No new permit/ other cons$6K due
ECB09/04/2025Observed active construction site under permit number q 01236781-gc issued 6/12/2025 and expires: 09/03/2025. Access denied for inspection by a construction worker at the entry door., provide access and/or expo$10K due
ECB12/06/20044A/B4B 19B/34A 21B/34B 50 50A 50B (hazardous- 4A missing low water cutoff.) 50- missing shut off valve at burner. 50A- threads on discharge pipe to relief valve on bock heater (no threads and must drop down 6-Nothing owed — awaiting certificate of correction
ECB12/06/20044A/B4B 19B/21B 50/34A 50A/34B 50B 50C (hazardous- 4A- missing low water cut off) 50-boiler is being fed directly into cast iron. Water pressure feed line must be piped into return. 50A- missing shut off valveNothing owed — awaiting certificate of correction