Two family brick
215-34 40 AVENUE
QUEENS · BIN 4138386
💬 Discuss this project
1965Year Built
2Stories
B1Building Class
R3XZoning
2,100 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · 4,000 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 20 docs
Floor 21p · 2 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Basement3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIKE TECH ASSOCIATES LLC505/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JULIAN ALBERTO GOMEZ303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJ GENERAL MECHANICAL LLCPlumbing207/08/2026
WCK ELECTRIC CORP.Electrical103/22/2026
MKSSKR CONSULTING SERVICEGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM ENGINEERING SERVICES P7975405/07/2026
RIKE TECH ASSOCIATES LLC2965102/07/2024
Building Lifecycle
All (82)Filed (5)Permit Issued (3)Signed Off (3)Violation (30)Inspection (6)Objection (14)Special Inspection (21)
08/11/2026
Signed off — Alteration
DUE TO CON EDISON, LOCKING THE GAS PIPING FOR A LEAK IN THE HOUSE PIPE. WE NOW HAVE TO RUN TWO BRAND, NEW, 1 INCH GAS LINES FROM THE EXISTING METERS ON THE SIDE OF THE HOUSE TO THE BOILER ROOM. INSTALLING TWO NEW COMBI HIGH EFFICIENCY HEATING HOT WATER UN
Q00937645-I1
08/11/2026
Signed off — Alteration
DUE TO CON EDISON, LOCKING THE GAS PIPING FOR A LEAK IN THE HOUSE PIPE. WE NOW HAVE TO RUN TWO BRAND, NEW, 1 INCH GAS LINES FROM THE EXISTING METERS ON THE SIDE OF THE HOUSE TO THE BOILER ROOM. INSTALLING TWO NEW COMBI HIGH EFFICIENCY HEATING HOT WATER UN
Q00937645-S1
06/18/2026
Signed off — Alteration
FILED HEREWITH TO PROPOSED INTERIOR RENOVATION AT EXISTING TWO FAMILY DWELLING UNIT AND BASEMENT AT 1ST & 2ND FLOOR .RISE A PORTION OF REAR ROOF TO MATH FRONT HIP ROOF. NO CHANGE IN USE, GROUP, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Q00936982-I1
06/05/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/29/2026
Special inspection requirement — Fenestration air leakage
Albert Munoz
05/29/2026
Special inspection requirement — Fenestration areas
Albert Munoz
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
05/29/2026
Special inspection requirement — Masonry
Albert Munoz
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
05/29/2026
Special inspection requirement — Insulation placement and R values
Albert Munoz
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
05/26/2026
Special inspection requirement — High Temperature Hot Water Piping (Welding)
Albert Munoz
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
05/20/2026
Objection resolved — Addressed
05/12/2026
Objection raised — Scope
05/07/2026
Filed — Alteration
FILED HEREWITH TO PROPOSED INTERIOR RENOVATION AT EXISTING TWO FAMILY DWELLING UNIT AND BASEMENT AT 1ST & 2ND FLOOR .RISE A PORTION OF REAR ROOF TO MATH FRONT HIP ROOF. NO CHANGE IN USE, GROUP, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Q00936982-P2
05/07/2026
Filed — Alteration
DUE TO CON EDISON, LOCKING THE GAS PIPING FOR A LEAK IN THE HOUSE PIPE. WE NOW HAVE TO RUN TWO BRAND, NEW, 1 INCH GAS LINES FROM THE EXISTING METERS ON THE SIDE OF THE HOUSE TO THE BOILER ROOM. INSTALLING TWO NEW COMBI HIGH EFFICIENCY HEATING HOT WATER UN
Q00937645-P2
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
05/06/2026
Special inspection requirement — Masonry
Albert Munoz
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
05/06/2026
Special inspection requirement — Fenestration air leakage
Albert Munoz
05/06/2026
Special inspection requirement — Insulation placement and R values
Albert Munoz
05/06/2026
Special inspection requirement — Fenestration areas
Albert Munoz
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
05/06/2026
Special inspection requirement — High Temperature Hot Water Piping (Welding)
Albert Munoz
04/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/25/2025
Violation issued (HPD, closed)
I
10/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2025
Permit issued — General Construction
Q00936982-I1-GC
12/04/2024
Violation issued (HPD, closed)
I
11/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/04/2024
Permit issued — Plumbing
Q00937645-I1-PL
05/28/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/13/2024
Permit issued — Plumbing
Q00937645-S1-PL
02/07/2024
Filed — Alteration
DUE TO CON EDISON, LOCKING THE GAS PIPING FOR A LEAK IN THE HOUSE PIPE. WE NOW HAVE TO RUN TWO BRAND, NEW, 1 INCH GAS LINES FROM THE EXISTING METERS ON THE SIDE OF THE HOUSE TO THE BOILER ROOM. INSTALLING TWO NEW COMBI HIGH EFFICIENCY HEATING HOT WATER UN
Q00937645-S1
02/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
02/01/2024
Special inspection requirement — Energy Code Compliance Inspections
SYED RIZVI
02/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
SYED RIZVI
12/14/2023
Objection resolved — Addressed
12/14/2023
Objection resolved — Addressed
12/14/2023
Objection resolved — Addressed
12/14/2023
Objection resolved — Addressed
12/14/2023
Objection resolved — Addressed
12/14/2023
Objection resolved — Addressed
12/11/2023
Objection raised — Scope
12/11/2023
Objection raised — Zoning
12/11/2023
Objection raised — Other
12/11/2023
Objection raised — Other
12/11/2023
Objection raised — Scope
12/11/2023
Objection raised — Admin
11/30/2023
Filed — Alteration
DUE TO CON EDISON, LOCKING THE GAS PIPING FOR A LEAK IN THE HOUSE PIPE. WE NOW HAVE TO RUN TWO BRAND, NEW, 1 INCH GAS LINES FROM THE EXISTING METERS ON THE SIDE OF THE HOUSE TO THE BOILER ROOM. INSTALLING TWO NEW COMBI HIGH EFFICIENCY HEATING HOT WATER UN
Q00937645-I1
11/30/2023
Filed — Alteration
FILED HEREWITH TO PROPOSED INTERIOR RENOVATION AT EXISTING TWO FAMILY DWELLING UNIT AND BASEMENT AT 1ST & 2ND FLOOR .RISE A PORTION OF REAR ROOF TO MATH FRONT HIP ROOF. NO CHANGE IN USE, GROUP, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Q00936982-I1
11/29/2023
Violation issued (HPD, closed)
I
07/13/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/26/2023
Violation issued (HPD, closed)
C
04/26/2023
Violation issued (HPD, closed)
B
04/26/2023
Violation issued (HPD, closed)
B
03/01/2023
Violation issued (HPD, closed)
B
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMKSSKR CONSULTING SERVICE06/10/2025
DOB NOWPlumbingSigned-offMJ GENERAL MECHANICAL LLC11/04/2024
DOB NOWPlumbingSigned-offMJ GENERAL MECHANICAL LLC03/13/2024
BISPLISSUEDTOP DOG PLBG & HTG CORP10/23/2015
BISOTISSUEDM. INT'L ENGINEERING PLLC09/29/2015
1 project · most recent 05/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/07/2026Signed-offCENTA PLUMBING & HEATINGGas, Water/Sanitary
1 project · most recent 07/10/2025
General Wiring
FiledStatusContractorScope
07/10/2025CompleteWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/05/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
05/29/2026Fenestration air leakageAlbert Munozenergy_progress
05/29/2026Fenestration areasAlbert Munozenergy_progress
05/29/2026Fire-Resistant Penetrations and JointsAlbert Munozspecial
05/29/2026MasonryAlbert Munozspecial
05/29/2026Energy Code Compliance InspectionsAlbert Munozprogress
05/29/2026Insulation placement and R valuesAlbert Munozenergy_progress
05/26/2026Fire-Resistant Penetrations and JointsAlbert Munozspecial
05/26/2026High Temperature Hot Water Piping (Welding)Albert Munozspecial
05/26/2026Energy Code Compliance InspectionsAlbert Munozprogress
05/06/2026Energy Code Compliance InspectionsAlbert Munozprogress
05/06/2026Fire-Resistant Penetrations and JointsAlbert Munozspecial
05/06/2026MasonryAlbert Munozspecial
05/06/2026Energy Code Compliance InspectionsAlbert Munozprogress
05/06/2026Fenestration air leakageAlbert Munozenergy_progress
05/06/2026Insulation placement and R valuesAlbert Munozenergy_progress
05/06/2026Fenestration areasAlbert Munozenergy_progress
05/06/2026Fire-Resistant Penetrations and JointsAlbert Munozspecial
05/06/2026High Temperature Hot Water Piping (Welding)Albert Munozspecial
02/01/2024Fire-Resistant Penetrations and JointsSYED RIZVIspecial
02/01/2024Energy Code Compliance InspectionsSYED RIZVIprogress
02/01/2024HVAC-R and service water heating equipmentSYED RIZVIenergy_progress
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026Q00936982-I1Request digital key ↗
08/23/2026Q00936982-P2Request digital key ↗
08/16/2026Q00937645-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
08/22/2016421193327Open ↗
02/12/2016421193327Open ↗
01/20/2016421193327Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
10/26/2015421193327Open ↗
10/05/2015421193327Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/16/2016421193327Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISRESTRICTION: RESTRICTIVE DECLARATION2
08/30/2016421193327Open ↗
08/22/2016421193327Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026Q00937645-P2Open ↗
09/01/2026Q00936982-I1Open ↗
09/01/2026Q00936982-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026Q00937645-P2Open ↗
09/02/2026Q00937645-P2Open ↗
09/01/2026Q00936982-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026Q00936982-I1Open ↗
08/23/2026Q00936982-P2Open ↗
08/16/2026Q00937645-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/16/2016421193327Open ↗
08/17/2015421193327Open ↗
07/31/2015421193327Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/12/2016421193327Open ↗
01/20/2016421193327Open ↗
07/31/2015421193327Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026Q00936982-P2Open ↗
08/23/2026Q00936982-I1Open ↗
08/15/2026Q00937645-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/31/2015421193327Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/16/2016421193327Open ↗
08/17/2015421193327Open ↗
07/31/2015421193327Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/16/2016421193327Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
07/31/2015421193327Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/16/2016421193327Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/16/2016421193327Open ↗
07/31/2015421193327Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
07/31/2015421193327Open ↗
▸BISADDITIONAL INFORMATION1
10/21/2015421193327Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/23/2026Q00936982-P2Open ↗
08/13/2026Q00936982-I1Open ↗