← Back
Mansion type or town house
215-73 26 AVENUE
QUEENS · BIN 4133640
💬 Discuss this project
1940Year Built
2.5Stories
A7Building Class
R1-2Zoning
5,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Mansion type or town house · 6,960 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 211p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TO THE OWNER OF203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/22/2021$1.3M—— → —$265/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR102/18/2025
FANG ARCHITECT511/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALSON CONTRACTING INCGeneral Contractor307/08/2026
CITY BUILDING CONSULTANTSGeneral Contractor303/21/2026
VILLAGE P & H NY INCPlumbing107/08/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281102/18/2025
FANG ARCHITECT5513511/22/2022
Building Lifecycle
All (50)Filed (6)Permit Issued (7)Signed Off (1)Violation (2)Inspection (4)Special Inspection (30)
11/21/2025
Signed off — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 63 modules, 25.83 KW
Q01182826-I1
02/21/2025
Permit issued — Solar
Q01182826-I1-SL
02/18/2025
Filed — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 63 modules, 25.83 KW
Q01182826-I1
02/18/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
02/18/2025
Special inspection requirement — Final
Mina Makar
02/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
02/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
04/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/31/2023
Permit issued — General Construction
Q00509010-I1-GC
03/30/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/30/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/23/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
11/23/2022
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
11/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
11/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
11/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
11/22/2022
Filed — Alteration
CAP & REMOVE EXISTING OIL TANK & OIL BOILER AT CEL. OIL TO GAS BOILER CONVERSION, AND PLUMBING WORK OF EXISTING 1-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00509010-P3
11/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
11/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
11/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
11/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
11/22/2022
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
09/02/2022
Filed — Alteration
CAP & REMOVE EXISTING OIL TANK & OIL BOILER AT CEL. OIL TO GAS BOILER CONVERSION, AND PLUMBING WORK OF EXISTING 1-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00509010-P2
08/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
08/30/2022
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
08/30/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
08/30/2022
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
08/30/2022
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
08/10/2022
Permit issued — Plumbing
Q00509010-S1-PL
07/29/2022
Filed — Alteration
CAP & REMOVE EXISTING OIL TANK & OIL BOILER AT CEL. OIL TO GAS BOILER CONVERSION, AND PLUMBING WORK OF EXISTING 1-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00509010-P1
07/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
07/28/2022
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
07/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
07/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
07/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
03/31/2022
Permit issued — General Construction
Q00509010-I1-GC
11/03/2021
Permit issued — General Construction
Q00509010-I1-GC
06/28/2021
Permit issued — General Construction
Q00509010-I1-GC
06/03/2021
Permit issued — Plumbing
Q00509010-S1-PL
05/06/2021
Filed — Alteration
CAP & REMOVE EXISTING OIL TANK & OIL BOILER AT CEL. OIL TO GAS BOILER CONVERSION, AND PLUMBING WORK OF EXISTING 1-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00509010-S1
04/22/2021
Filed — Alteration
CAP & REMOVE EXISTING OIL TANK & OIL BOILER AT CEL. OIL TO GAS BOILER CONVERSION, AND PLUMBING WORK OF EXISTING 1-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00509010-I1
04/22/2021
Special inspection requirement — Maintenance information
DEZHANG FANG
04/22/2021
Special inspection requirement — Interior lighting power
DEZHANG FANG
04/22/2021
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
04/22/2021
Special inspection requirement — Fenestration areas
DEZHANG FANG
04/22/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
12/12/1997
Violation issued (ECB, closed)
Construction
12/12/1997
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR02/21/2025
DOB NOWGeneral ConstructionPermit IssuedALSON CONTRACTING INC03/31/2023
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C08/10/2022
DOB NOWGeneral ConstructionPermit IssuedALSON CONTRACTING INC03/31/2022
DOB NOWGeneral ConstructionPermit IssuedALSON CONTRACTING INC11/03/2021
DOB NOWGeneral ConstructionPermit IssuedCITY BUILDING CONSULTANTS06/28/2021
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC06/03/2021
BISOTISSUEDMINOS RENOVATIONS INC.11/25/2002
BISPLISSUEDARIANA CONTRACTING INC02/20/1998
1 project · most recent 11/22/2022
Gas Water/Sanitary
FiledStatusContractorScope
11/22/2022Permit Issued5 BORO'S PLUMBING INCGas, Water/Sanitary
2 projects · most recent 09/10/2025
General Wiring
FiledStatusContractorScope
09/10/2025CompleteISLAND ELECTRIC CORP—
11/22/2021Permit IssuedGREEN POWER ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/30/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/23/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
02/18/2025Air barrier - visual inspectionMina Makarenergy_progress
02/18/2025FinalMina Makarprogress
02/18/2025Energy Code Compliance InspectionsMina Makarprogress
02/18/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
02/18/2025Fire-Resistant Penetrations and JointsMina Makarspecial
11/23/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
11/23/2022Energy Code Compliance InspectionsDEZHANG FANGprogress
11/23/2022HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
11/23/2022HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
11/23/2022HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
11/22/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
11/22/2022HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
11/22/2022HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
11/22/2022HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
11/22/2022Energy Code Compliance InspectionsDEZHANG FANGprogress
08/30/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
08/30/2022Energy Code Compliance InspectionsDEZHANG FANGprogress
08/30/2022HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
08/30/2022HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
08/30/2022HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
07/28/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
07/28/2022Energy Code Compliance InspectionsDEZHANG FANGprogress
07/28/2022HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
07/28/2022HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
07/28/2022HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
Latest 25 of 35.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q00509010-P2Request digital key ↗
08/25/2026Q00509010-S1Request digital key ↗
08/25/2026Q00509010-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026Q01182826-I1Open ↗
09/01/2026Q01182826-I1Open ↗
08/27/2026Q00509010-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q01182826-I1Open ↗
08/27/2026Q00509010-P2Open ↗
08/26/2026Q00509010-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026Q00509010-I1Open ↗
08/13/2026Q01182826-I1Open ↗
08/13/2026Q00509010-S1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026Q00509010-S1Open ↗
08/13/2026Q00509010-P3Open ↗
08/13/2026Q01182826-I1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01182826-I1Open ↗