← Back
BuildNYC
Elevator apt, fireproof without stores
Linden Houses
215 COZINE AVENUE · BIN 3337062
💬 Discuss this project
1963Year Built
8Stories
D3Building Class
R5Zoning
478,800 sfGross Floor Area
571Units
LL97 CoveredRent Stabilized49 Active Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: Stanley Avenue Preservation · 460,600 sf lot · 1.04 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsLinden Houses - Building 141 filing
RoofM&A PROJECTS temporary equipment1 filing
BulkheadLaundry room conversion and signage1p · 1 filing · 20 docs
Floor 1Laundry room conversion and signage3p · 1 filing · 20 docs
CellarLaundry room conversion and signage2p · 1 filing · 20 docs
Site & exteriorM&A PROJECTS temporary equipment5 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority2907/08/2026
Stanley Avenue Preservation603/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service403/21/2026
AE Design Solution403/21/2026
JM Zoning5003/21/2026
AK Consulting Services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sap ConstructionGeneral Contractor2607/08/2026
Roma ScaffoldingScaffold1207/08/2026
Skyline Scaffolding GroupScaffold807/08/2026
Victorian FenceScaffold707/08/2026
Capone Electrical ContractorsGeneral Contractor403/22/2026
Nationwide MechanicalPlumbing307/08/2026
M & A ProjectsScaffold207/08/2026
Nationwide MechanicalFire Protection107/08/2026
Innovation PlumbingPlumbing107/08/2026
M & M Piping and HeatingPlumbing107/08/2026
Mark GinsbergElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service8431804/22/2026
Rand Engineering & Architects266402/12/2025
Building Lifecycle
All (280)Filed (34)Permit Issued (34)Signed Off (16)Facade (FISP) (16)Violation (60)Inspection (11)Objection (79)Special Inspection (30)
07/31/2026
Violation issued (HPD, open)
B
07/17/2026
Signed off — Alteration CO
INTERIOR RENOVATION TO AMEND C OF O PER CONVERSION OF EXISTING PERAMBULATOR ROOM AT FIRST FLOOR INTO A LAUNDRY ROOM. ALT-CO FILED TO MODIFY OCCUPANCY OF TENANT AMENITY SPACE ONLY; NO ALTERATION TO BUILDING BULK PROPOSED.
B01079314-I1
07/15/2026
Violation issued (HPD, closed)
C
06/03/2026
Violation issued (HPD, open)
C
05/06/2026
Special inspection requirement — Vestibules
JOHN MCMONAGLE
05/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
05/06/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
05/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
05/06/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/29/2026
Violation issued (HPD, open)
C
04/29/2026
Violation issued (HPD, closed)
C
04/29/2026
Objection resolved — Addressed
04/27/2026
Objection raised — Other
04/22/2026
Filed — Alteration CO
INTERIOR RENOVATION TO AMEND C OF O PER CONVERSION OF EXISTING PERAMBULATOR ROOM AT FIRST FLOOR INTO A LAUNDRY ROOM. ALT-CO FILED TO MODIFY OCCUPANCY OF TENANT AMENITY SPACE ONLY; NO ALTERATION TO BUILDING BULK PROPOSED.
B01079314-P1
04/20/2026
Violation issued (HPD, closed)
B
04/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/03/2026
Special inspection requirement — Vestibules
JOHN MCMONAGLE
04/03/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
04/03/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
04/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
04/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/03/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
03/27/2026
Violation issued (ECB, closed)
Elevators
02/11/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, closed)
B
02/06/2026
Violation issued (HPD, closed)
C
01/15/2026
Permit issued — General Construction
B01079314-I1-GC
11/13/2025
Violation issued (ECB, closed)
Elevators
10/30/2025
Violation issued (ECB, closed)
Elevators
10/15/2025
Violation issued (HPD, closed)
C
09/22/2025
Violation issued (HPD, closed)
A
06/19/2025
Violation issued (HPD, closed)
B
05/21/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478630-S4
05/21/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478630-S3
05/21/2025
Violation issued (FDNY_ORDER, closed)
05/12/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478630-S6
05/05/2025
Violation issued (HPD, closed)
A
05/05/2025
Violation issued (HPD, closed)
A
05/05/2025
Violation issued (HPD, closed)
C
05/05/2025
Violation issued (HPD, closed)
C
05/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/28/2025
Violation issued (HPD, closed)
C
04/28/2025
Violation issued (HPD, closed)
C
04/28/2025
Violation issued (HPD, closed)
C
04/23/2025
Permit issued — General Construction
B01079314-I1-GC
04/15/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478630-I1
04/11/2025
Violation issued (HPD, closed)
C
04/11/2025
Violation issued (HPD, closed)
A
04/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/11/2025
Objection raised — Other
04/11/2025
Objection resolved — Addressed
04/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/04/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478630-S8
03/28/2025
Objection resolved — Addressed
03/27/2025
Violation issued (HPD, closed)
B
03/27/2025
Violation issued (HPD, closed)
B
03/27/2025
Violation issued (HPD, closed)
B
Latest 60 of 280 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSap Construction01/15/2026
DOB NOWGeneral ConstructionPermit IssuedSap Construction04/23/2025
DOB NOWMechanical SystemsSigned-offSap Construction02/27/2025
DOB NOWSprinklersSigned-offNationwide Mechanical01/14/2025
DOB NOWPlumbingSigned-offNationwide Mechanical01/08/2025
DOB NOWGeneral ConstructionSigned-offSap Construction11/18/2024
DOB NOWPlumbingSigned-offM & M Piping and Heating09/10/2024
DOB NOWStructuralSigned-offSap Construction07/25/2024
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/03/2024
DOB NOWGeneral ConstructionSigned-offSap Construction03/25/2024
DOB NOWGeneral ConstructionSigned-offSap Construction03/19/2024
DOB NOWPlumbingSigned-offNationwide Mechanical02/01/2024
DOB NOWSuspended ScaffoldSigned-offM & A Projects01/12/2024
DOB NOWGeneral ConstructionSigned-offSap Construction12/27/2023
DOB NOWSuspended ScaffoldSigned-offC.C.C. Renovation12/08/2023
DOB NOWSupported ScaffoldSigned-offM & A Projects09/22/2023
DOB NOWGeneral ConstructionSigned-offSap Construction08/25/2023
DOB NOWConstruction FenceSigned-offVictorian Fence05/13/2023
DOB NOWPlumbingSigned-offInnovation Plumbing05/10/2023
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/03/2023
DOB NOWGeneral ConstructionSigned-offSap Construction03/09/2023
DOB NOWGeneral ConstructionSigned-offSap Construction01/19/2023
DOB NOWGeneral ConstructionSigned-offSap Construction07/05/2022
DOB NOWConstruction FenceSigned-offVictorian Fence06/06/2022
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/04/2022
DOB NOWConstruction FenceSigned-offVictorian Fence04/27/2022
DOB NOWSupported ScaffoldSigned-offM & A Projects04/25/2022
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group02/17/2022
DOB NOWSidewalk ShedSigned-offRoma Scaffolding02/10/2022
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/02/2022
DOB NOWConstruction FenceSigned-offRoma Scaffolding01/28/2021
DOB NOWSidewalk ShedSigned-offRoma Scaffolding01/15/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding01/28/2020
DOB NOWSidewalk ShedSigned-offRoma Scaffolding01/27/2020
BISOTISSUEDVikrant Contracting & Builder09/08/2017
BISOTISSUEDVikrant Contracting & Builder07/31/2017
BISEQISSUEDVikrant Contracting & Builder06/21/2017
BISEQISSUEDVikrant Contracting & Builder06/21/2017
BISEQISSUEDSkyworx Contracting03/23/2017
BISEQISSUEDSkyworx Contracting04/04/2016
+ 13 more permits on file
9 projects · most recent 02/19/2025
General Wiring
FiledStatusContractorScope
02/19/2025CompleteCapone Electrical ContractorsGeneral Wiring
09/11/2023CompleteCapone Electrical Contractors—
09/11/2023CompleteV Electric NY—
01/06/2023CompleteKet Electric—
11/21/2022CompleteCapone Electrical ContractorsGeneral Wiring
06/07/2022CompleteR.C.M. Electric—
05/10/2022CompleteTop Shelf Electric—
02/02/2022CompleteTop Shelf Electric—
12/27/2019CompleteRaiden Electric—
1 project · most recent 09/21/2022
FiledStatusContractorScope
09/21/2022——1 scope_items
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/26/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/19/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
02/07/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
01/27/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
01/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 118
DateRequirementInspectorRole
05/06/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
05/06/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/06/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/06/2026Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
05/06/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
05/06/2026VestibulesJOHN MCMONAGLEenergy_progress
05/06/2026Lighting controlsJOHN MCMONAGLEenergy_progress
04/03/2026Tenant Protection Plan Compliance—special
04/03/2026VestibulesJOHN MCMONAGLEenergy_progress
04/03/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
04/03/2026Lighting controlsJOHN MCMONAGLEenergy_progress
04/03/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
04/03/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
04/03/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
03/18/2025Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
03/18/2025FinalMark Ginsbergprogress
03/18/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
03/18/2025Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
03/18/2025VestibulesJOHN MCMONAGLEenergy_progress
03/18/2025Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
03/18/2025Exterior lighting powerJOHN MCMONAGLEenergy_progress
03/18/2025Lighting controlsJOHN MCMONAGLEenergy_progress
03/18/2025Interior lighting powerJOHN MCMONAGLEenergy_progress
03/18/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
03/05/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
Latest 25 of 118.
▾Documents — 354 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch32
08/31/2026B00672776-I1Request digital key ↗
08/29/2026B00705403-I1Request digital key ↗
08/29/2026B00698210-I1Request digital key ↗
Showing 3 of 32 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00300203-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00300323-I1Request digital key ↗
▸Applications & Permits32
▸BISWORK PERMIT APPLICATION18
09/15/2017340521563Open ↗
07/31/2017340521563Open ↗
06/22/2017321538680Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
07/11/2017340521563Open ↗
06/22/2017321538680Open ↗
06/22/2017321538699Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/04/2025302288860Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/23/2026B00478630-P8Open ↗
08/23/2026B00478630-P5Open ↗
08/23/2026B00478630-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00568945-I1Open ↗
▸Seals & Professional Certifications120
▸DOB NOWDPL-1: Design Professional Seal & Signature32
08/23/2026B00478630-S6Open ↗
08/23/2026B00478630-P8Open ↗
08/23/2026B00478630-P2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/01/2026B00478630-P3Open ↗
09/01/2026B00478630-P3Open ↗
09/01/2026B00478630-P5Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
06/26/2018340521563Open ↗
05/17/2018321538680Open ↗
05/17/2018321538699Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/01/2026B00478630-P3Open ↗
09/01/2026B00478630-S7Open ↗
09/01/2026B00478630-P5Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/22/2017321538680Open ↗
06/22/2017321538699Open ↗
06/07/2010320168812Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
06/07/2010320168812Open ↗
03/19/2010320140147Open ↗
03/19/2010320140147Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/11/2017340521563Open ↗
06/22/2017321538699Open ↗
04/02/2016340366650Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/11/2017340521563Open ↗
04/02/2016340366650Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/11/2017340521563Open ↗
04/02/2016340366650Open ↗
▸BISProfessional and Owner Certification (POC3)1
06/22/2017321538680Open ↗
▸BISPC FULL REPORT1
02/01/2008310086581Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE3
07/18/2011320140147Open ↗
07/18/2011320140147Open ↗
07/18/2011320140147Open ↗
▸BISSCHEDULE B - PLUMBING1
03/19/2010320140147Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes3
06/22/2017321538680Open ↗
06/22/2017321538699Open ↗
07/11/2017340521563Open ↗
▸DOB NOWStreet Tree Checklist3
08/14/2026B01079314-P1Open ↗
08/13/2026B00568945-I1Open ↗
08/13/2026B01079314-I1Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00300323-I1Open ↗
08/13/2026B00300203-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/13/2026B00478630-S2Open ↗
08/13/2026B00478630-S6Open ↗
08/13/2026B00478630-S8Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
06/16/2010320140147Open ↗
02/01/2008310086581Open ↗
06/14/2010320140147Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/15/2026B00478630-S7Open ↗
08/13/2026B00478630-A5Open ↗
08/13/2026B00478630-S5Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
06/26/2018340521563Open ↗
07/11/2017340521563Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/07/2010320168812Open ↗
▸Energy Compliance11
▸DOB NOWEN2: As Built Energy Analysis.5
08/13/2026B00478630-S5Open ↗
08/13/2026B00478630-S3Open ↗
08/13/2026B00478630-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/31/2017340521563Open ↗
07/11/2017340521563Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/26/2018340521563Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/11/2017340521563Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/26/2018340521563Open ↗
▸BISNYCECC ANALYSIS1
07/11/2017340521563Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/31/2017340521563Open ↗
07/11/2017340521563Open ↗
04/02/2016340366650Open ↗
▸Approvals, Objections & Sign-offs65
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter33
08/26/2026B00979836-I1Open ↗
08/23/2026B00478630-P9Open ↗
08/23/2026B00478630-P4Open ↗
Showing 3 of 33 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
12/17/2025302288860Open ↗
06/26/2018340521563Open ↗
05/17/2018321538680Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP Variance (V5) letter8
08/13/2026B01079314-I1Open ↗
08/13/2026B00478630-S8Open ↗
08/13/2026B00478630-S7Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
06/07/2010320168812Open ↗
04/02/2010320138472Open ↗
03/19/2010320140147Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/08/2017340366650Open ↗
11/18/2010310086581Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026B00300323-I1Open ↗
08/13/2026B00300203-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026B00300323-I1Open ↗
08/13/2026B00300203-I1Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT12
06/26/2018340521563Open ↗
07/11/2017340521563Open ↗
10/17/2011320138472Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00478630-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00478630-I1Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET7
06/22/2017321538680Open ↗
06/22/2017321538699Open ↗
06/07/2010320168812Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
06/26/2018340521563Open ↗
05/17/2018321538680Open ↗
05/17/2018321538699Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/11/2017340521563Open ↗
04/02/2016340366650Open ↗
▸BISADDITIONAL INFORMATION1
02/27/2018340521563Open ↗
▸Other Documents28
▸DOB NOWSURVEY: INITIAL6
08/23/2026B00478630-P1Open ↗
08/23/2026B00478630-P8Open ↗
08/23/2026B00478630-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlot Diagram5
08/23/2026B00478630-P8Open ↗
08/23/2026B00478630-I1Open ↗
08/23/2026B00478630-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/23/2026B00478630-P5Open ↗
08/23/2026B00478630-I1Open ↗
08/23/2026B00478630-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/23/2026B00478630-P8Open ↗
08/23/2026B00478630-I1Open ↗
08/13/2026B00478630-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026B00979836-I1Open ↗
08/13/2026B00966740-I1Open ↗
▸DOB NOWCalculations2
08/13/2026B00966740-I1Open ↗
08/13/2026B00979836-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
07/11/2017340521563Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01079314-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00478630-I1Open ↗
▸DOB NOWWaiver Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type