← Back
BuildNYC
Court house
Bronx Family and Criminal Court
215 EAST 161ST STREET · BIN 2002704
💬 Discuss this project
1968Year Built
10Stories
Z1Building Class
C4-6Zoning
689,840 sfGross Floor Area
3Units
LL97 Covered4 Active Violations 0 unresolved · 4 paperwork only 27 old, status unconfirmed ▸FISP: SAFE
Court house · 70,400 sf lot · 9.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsFisp Cycle 9 Repairs1 filing
RoofDormitory Authority of New York State, Bronx Family & Crimin8p · 2 filings · 18 docs
Floor 10Bronx Family & Criminal Court2p · 1 filing · 10 docs
Floor 9Bronx Family & Criminal Court1p · 1 filing · 10 docs
Floor 8Bronx Family & Criminal Court1 filing · 10 docs
Floor 7Bronx Family & Criminal Court1 filing · 10 docs
Floor 6
Floor 5
Floor 4Dormitory Authority of New York State6p · 3 filings · 17 docs
Floor 3Dormitory Authority of New York State, Bronx Family & Crimin2p · 3 filings · 17 docs
Floor 2Bronx Family Court, Bronx Family & Criminal CourtUnder Construction4p · 2 filings · 18 docs
Floor 1Temporary sidewalk shed installation1 filing · 3 docs
Site & exteriorTemporary sidewalk shed installation1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development1603/21/2026
Citident303/21/2026
Department of General Services303/21/2026
D.P. Consulting203/21/2026
Dasny103/21/2026
DGS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Liro Architects + Planners210/13/2026
Lakhani & Jordan602/04/2026
H2M Architects Engineers208/07/2025
Ysrael A. Seinuk212/09/2024
The Liro Group104/18/2024
Superstructures Engineering + Architects104/04/2023
Joel Phagoo P.E103/17/2023
H2H Group103/19/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates1203/21/2026
Superstructures Engineering + Architects103/21/2026
Ysrael A Seinuk P C203/21/2026
AC Building Consultants603/21/2026
Aristar Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AAA Windows & DoorsScaffold1407/08/2026
Vanguard Construction andGeneral Contractor907/08/2026
Contract & HospitalityGeneral Contractor506/28/2026
J & N Construction GroupScaffold303/21/2026
Absolute Electrical Contracting ofElectrical203/21/2026
George Breslaw PlumbingPlumbing207/08/2026
Sajiun ElectricElectrical103/21/2026
Awl IndustriesGeneral Contractor104/09/2026
J & N Construction GroupGeneral Contractor107/08/2026
Star Electrical ContractorsElectrical103/21/2026
Mac FelderPlumbing107/08/2026
A & S ElectricElectrical103/21/2026
P & M Elect'l ContractingElectrical103/21/2026
Robert Garcia Electrical ContElectrical103/21/2026
Unisys ElectricElectrical103/21/2026
Star-Delta ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Special Engineering2018410/13/2026
Tectonic Engineering Cons106602/04/2026
Joadem4350112/09/2024
Superstructures Engineering374104/04/2023
Building Lifecycle
All (183)Filed (16)Permit Issued (27)Signed Off (3)Facade (FISP) (16)Violation (60)Inspection (1)Objection (30)Special Inspection (30)
10/13/2026
Filed — Alteration CO
New HVAC supply air VAV boxes and associated boxes' controls and ductwork would be installed. Reconnecting to existing building air handling units
X00913620-P2
10/09/2026
Special inspection requirement — Final
William Ryan
10/09/2026
Special inspection requirement — Seismic Isolation Systems
10/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
10/09/2026
Special inspection requirement — Mechanical Systems
William Ryan
10/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
10/09/2026
Special inspection requirement — Shutoff dampers
William Ryan
10/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
10/09/2026
Special inspection requirement — Interior lighting power
William Ryan
10/09/2026
Special inspection requirement — Lighting controls
William Ryan
10/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
10/09/2026
Special inspection requirement — Maintenance information
William Ryan
10/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
10/09/2026
Special inspection requirement — Duct leakage testing, insulation and design
William Ryan
10/09/2026
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
03/13/2026
Permit issued — Mechanical Systems
X00913620-I1-GC
02/04/2026
Filed — Alteration
Replace AC-5 and RF-5 in 3rd FL M.E.R. Replace existing VAV, FTR and install new AC-6 in 4th floor and AC-6s condenser on 4th floor roof.
X00703679-P2
12/23/2025
Objection resolved — Addressed
10/31/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
10/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
10/30/2025
Objection resolved — Addressed
10/27/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
10/27/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
10/27/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
10/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
10/27/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
10/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
10/27/2025
Special inspection requirement — Shutoff dampers
GEORGE GHEBRYAL
10/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
10/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Other
08/11/2025
Objection raised — Other
08/11/2025
Objection raised — Other
08/07/2025
Filed — Alteration
Interior renovation, including floor finishes, ceiling finishes, limited wall and layout changes, and 2 single use bathroom fixtures and accessory replacements.
X00569307-P1
07/15/2025
Objection resolved — Addressed
07/14/2025
Objection raised — Admin
07/14/2025
Objection raised — Zoning
07/09/2025
Permit issued — Mechanical Systems
X00913620-I1-GC
07/08/2025
Filed — Alteration
Replacement of storm drains. No change to use, egress or occupancy.
X01015634-S2
07/08/2025
Filed — Alteration
Replacement of storm drains. No change to use, egress or occupancy.
X01015634-S3
07/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/01/2025
Special inspection requirement — Post-installed Anchors
06/24/2025
Permit issued — General Construction
X00569307-I1-GC
06/24/2025
Permit issued — Mechanical Systems
X00703679-I1-MS
05/23/2025
Filed — Alteration
Replace AC-5 and RF-5 in 3rd FL M.E.R. Replace existing VAV, FTR and install new AC-6 in 4th floor and AC-6s condenser on 4th floor roof.
X00703679-P1
05/21/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
01/24/2025
Permit issued — Mechanical Systems
X00913620-S1-MS
01/24/2025
Permit issued — Mechanical Systems
X00913620-I1-GC
01/02/2025
Objection resolved — Addressed
12/11/2024
Objection raised — Other
12/09/2024
Filed — Alteration
Replacement of storm drains. No change to use, egress or occupancy.
X01015634-S1
12/09/2024
Filed — Alteration
Replacement of storm drains. No change to use, egress or occupancy.
X01015634-I1
12/09/2024
Objection resolved — Addressed
09/18/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00845231-I1
06/13/2024
Permit issued — Mechanical Systems
X00703679-I1-MS
06/13/2024
Permit issued — General Construction
X00569307-I1-GC
Latest 60 of 183 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedContract & Hospitality03/13/2026
DOB NOWMechanical SystemsPermit IssuedContract & Hospitality07/09/2025
DOB NOWGeneral ConstructionPermit IssuedVanguard Construction and06/24/2025
DOB NOWMechanical SystemsPermit IssuedVanguard Construction and06/24/2025
DOB NOWMechanical SystemsSigned-offAwl Industries01/24/2025
DOB NOWMechanical SystemsPermit IssuedContract & Hospitality01/24/2025
DOB NOWMechanical SystemsPermit IssuedVanguard Construction and06/13/2024
DOB NOWGeneral ConstructionPermit IssuedVanguard Construction and06/13/2024
DOB NOWPlumbingSigned-offGeorge Breslaw Plumbing02/02/2024
DOB NOWMechanical SystemsPermit IssuedVanguard Construction and06/14/2023
DOB NOWGeneral ConstructionPermit IssuedVanguard Construction and06/14/2023
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group05/05/2023
DOB NOWSidewalk ShedSigned-offJ & N Construction Group03/17/2023
DOB NOWPlumbingSigned-offGeorge Breslaw Plumbing02/09/2023
DOB NOWPlumbingSigned-offMac Felder01/23/2023
DOB NOWMechanical SystemsPermit IssuedVanguard Construction and01/20/2023
DOB NOWGeneral ConstructionPermit IssuedVanguard Construction and01/17/2023
DOB NOWSidewalk ShedSigned-offAAA Windows & Doors10/28/2022
DOB NOWSidewalk ShedSigned-offAAA Windows & Doors08/26/2021
DOB NOWSidewalk ShedSigned-offAAA Windows & Doors03/24/2021
DOB NOWSidewalk ShedSigned-offAAA Windows & Doors11/25/2020
DOB NOWSidewalk ShedSigned-offAAA Windows & Doors04/07/2020
DOB NOWSidewalk ShedSigned-offAAA Windows & Doors03/05/2019
DOB NOWSidewalk ShedSigned-offAAA Windows & Doors11/20/2018
DOB NOWSidewalk ShedSigned-offAAA Windows & Doors08/15/2018
DOB NOWSidewalk ShedSigned-offAAA Windows & Doors07/25/2018
DOB NOWSidewalk ShedSigned-offAAA Windows & Doors03/19/2018
BISOTISSUEDAfl Construction Co03/12/2019
BISMHISSUEDMEC-Con Associates03/07/2019
BISOTISSUEDAfl Construction Co08/31/2018
BISMHISSUEDMEC-Con Associates08/08/2018
BISOTISSUEDAfl Construction Co04/18/2018
BISSPISSUEDAce Contracting09/12/2017
BISFSISSUEDJack Piccini02/10/2017
BISEQISSUEDSafway Atlantic10/19/2016
BISOTISSUEDConstructomics09/29/2016
BISOTISSUEDConstructomics09/29/2016
BISPLISSUEDAce Contracting09/07/2016
BISSPISSUEDAce Contracting09/07/2016
BISMHISSUEDNorth Star Mechanical08/26/2016
+ 37 more permits on file
3 projects · most recent 10/13/2026
Air Conditioning Systems Ventilation Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/13/2026Permit IssuedContract & Hospitality*Ventilation Systems
Ventilation
Titus DESV 150 CFM · Vav Box ×6
Ducts & Piping
Titus DESV 150 CFM · Vav Box ×6
02/04/2026Permit IssuedVanguard Construction andAir Conditioning Systems, Heating Systems
Cooling
Trane PLA-A24EAB 24,000 BTU · Vrf Indoor ×5
SLZKF12NA 14,500 BTU · Vrf Indoor ×5
TPLA0A0241EA70A &TRUZA0241HA70(N/B)A 24,000 BTU ×5
Mitsubishi Electric TPLA0A0241EA70A &TRUZA0241HA70(N/B)A 24,000 BTU ×1
Heating
Trane TPLA0A0241EA70A & TRUZA0241HA70(N/B)A 26,000 BTU · Split System ×5
Mitsubishi Electric TPLA0A0241EA70A & TRUZA0241HA70NA 26,000 BTU · Split System ×1
07/08/2025——Air Conditioning Systems
Cooling
Carrier 50FC-M12A6A6-8W1C0 4,000 CFM · Fan Coil Indoor ×1
50FC-M16A6A6-8W1C0 6,000 CFM · Fan Coil Indoor ×1
2 projects · most recent 07/08/2025
Storm Water/Sanitary
FiledStatusContractorScope
07/08/2025——Storm
04/29/2022Signed-offGeorge Breslaw PlumbingWater/Sanitary
9 projects · most recent 05/02/2025
General Wiring Lighting
FiledStatusContractorScope
05/02/2025CompleteC.B. Mills ElectricGeneral Wiring
03/16/2023Permit IssuedAmin Electrical—
03/16/2023Permit IssuedAmin Electrical—
10/13/2020CompleteElmhurst ElectricGeneral Wiring
07/09/2019Permit IssuedP & M Elect'l ContractingGeneral Wiring
03/25/2019CompleteElmhurst ElectricGeneral Wiring
11/15/2018Permit IssuedHertz Electric—
04/03/2018Permit IssuedSelectric Electrical Cont Co IGeneral Wiring, Lighting
03/09/2018Permit IssuedHertz Electric—
1 project · most recent 07/08/2025
Steel Concrete
FiledStatusContractorScope
07/08/2025——Steel, Concrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
10/09/2026FinalWilliam Ryanprogress
10/09/2026Seismic Isolation Systems—special
10/09/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
10/09/2026Mechanical SystemsWilliam Ryanspecial
10/09/2026HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
10/09/2026Shutoff dampersWilliam Ryanenergy_progress
10/09/2026HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
10/09/2026Interior lighting powerWilliam Ryanenergy_progress
10/09/2026Lighting controlsWilliam Ryanenergy_progress
10/09/2026HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
10/09/2026Maintenance informationWilliam Ryanenergy_progress
10/09/2026Fire-Resistance Rated ConstructionWilliam Ryanprogress
10/09/2026Duct leakage testing, insulation and designWilliam Ryanenergy_progress
10/09/2026Energy Code Compliance InspectionsWilliam Ryanprogress
10/31/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
10/31/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/31/2025Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
10/27/2025FinalGEORGE GHEBRYALprogress
10/27/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/27/2025Mechanical SystemsGEORGE GHEBRYALspecial
10/27/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
10/27/2025Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
10/27/2025Maintenance informationGEORGE GHEBRYALenergy_progress
10/27/2025HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
10/27/2025Shutoff dampersGEORGE GHEBRYALenergy_progress
Latest 25 of 60.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bronx Family & Criminal CourtGovernment / CivicFloors 2, 3, 7–10, Roof
Project X01015634 Alteration · Approved · 12/09/2024
Bronx Family CourtGovernment / CivicFloor 2
Project X00913620 Alteration CO · Permit Issued · 04/05/2024
Dormitory Authority of New York StateGovernment / CivicFloors 3, 4, Roof
Project X00569307 Alteration · Permit Entire · 03/23/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 605 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/26/2026X00026148-I1Request digital key ↗
08/24/2026X00704381-I1Request digital key ↗
08/23/2026X00845231-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits133
▸BISWORK PERMIT APPLICATION74
03/13/2019220612308Open ↗
03/08/2019220612308Open ↗
09/04/2018220612308Open ↗
Showing 3 of 74 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION57
09/07/2023220612503Open ↗
01/20/2023220612503Open ↗
01/10/2023220612503Open ↗
Showing 3 of 57 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications176
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION95
10/12/2018220612308Open ↗
10/11/2018220612308Open ↗
07/30/2018220062795Open ↗
Showing 3 of 95 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
10/15/2026X00913620-P2Open ↗
10/15/2026X00913620-P2Open ↗
10/15/2026X00913620-P2Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
10/15/2026X00913620-P2Open ↗
08/23/2026X00845231-I1Open ↗
08/23/2026X00854030-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/15/2026X00913620-P2Open ↗
10/15/2026X00913620-P2Open ↗
09/01/2026X00703679-P2Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
10/19/2016220555691Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISApplicant / Owner Signature1
11/18/2013240041432Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/19/2016220555691Open ↗
▸Trade Schedules & Equipment28
▸BISSELF-CERT PLUMBING NOTICE14
06/08/2015220062795Open ↗
08/15/2014220062795Open ↗
08/12/2014220062795Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS2
11/06/2017220062795Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
02/16/2016220452258Open ↗
02/16/2016220452258Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
11/06/2017220062795Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/18/2017220062795Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
10/15/2026X00913620-P2Open ↗
08/13/2026X00913620-I1Open ↗
▸Environmental & Asbestos34
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)7
04/18/2018220612308Open ↗
10/06/2017220063543Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/15/2026X00569307-I1Open ↗
08/15/2026X00703679-I1Open ↗
08/13/2026X00704381-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/10/2013220116274Open ↗
Showing 1 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
11/18/2013240041432Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/21/2018220062795Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026X00854030-I1Open ↗
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
04/17/2018220612308Open ↗
11/06/2017220159316Open ↗
08/22/2017220612308Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
11/12/2020220113883Open ↗
10/30/2020220113883Open ↗
04/28/2017220159316Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/12/2020220113883Open ↗
10/30/2020220113883Open ↗
▸BISTR8: Energy Code Progress Inspections2
11/18/2013240041432Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY9
03/26/2021220113883Open ↗
03/26/2021220113883Open ↗
03/26/2021220113883Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
06/18/2018220062795Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs94
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
04/19/2021220113883Open ↗
08/01/2018220062795Open ↗
07/30/2018220062795Open ↗
Showing 3 of 37 on file for this type
▸BISADMINISTRATIVE OBJECTIONS23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
10/15/2026X00913620-P2Open ↗
08/23/2026X00854030-I1Open ↗
08/17/2026X00703679-P1Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
03/26/2021220113883Open ↗
11/12/2020220113883Open ↗
10/19/2016220555691Open ↗
Showing 3 of 15 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
10/25/2018220113883Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026X01015634-S1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X00704381-I1Open ↗
▸Cost, Insurance & Ownership40
▸BISCOST AFFIDAVIT40
04/19/2021220113883Open ↗
11/12/2020220113883Open ↗
10/30/2020220113883Open ↗
Showing 3 of 40 on file for this type
▸Filing & Intake Forms38
▸BISEFILING COVER SHEET20
08/22/2017220612503Open ↗
08/22/2017220612308Open ↗
08/22/2017220612308Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM10
07/30/2018220062795Open ↗
06/18/2018220062795Open ↗
02/21/2018220062795Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION7
11/06/2017220062795Open ↗
11/06/2017220062795Open ↗
12/23/2013240041432Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/18/2013240041432Open ↗
▸Other Documents3
▸BISSupporting Document: Fee Exempt1
11/12/2020220113883Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X01015634-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026X00026148-I1Open ↗