Elevator cooperative
215 EAST 79 STREET
MANHATTAN · Upper East Side-Yorkville · BIN 1048511
💬 Discuss this project
1947Year Built
15Stories
D4Building Class
R10AZoning
94,418 sfGross Floor Area
87Units
LL97 CoveredRent Stabilized27 Open Violations 24 unresolved · 3 paperwork only ▸FISP: SAFE
Elevator cooperative · 10,179 sf lot · 9.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 6 docs
Floor 151 filing · 4 docs
Floor 14
Floor 135p · 2 filings · 11 docs
Floor 12
Floor 115p · 2 filings · 6 docs
Floor 10
Floor 9
Floor 84p · 1 filing · 12 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 22p · 1 filing · 14 docs
Floor 1Under Construction9p · 1 filing · 9 docs
Site & exteriorUnder Construction12p · 4 filings · 14 docs
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
215 EAST 791403/21/2026
215 EAST 79TH STREET1403/21/2026
215 EAST 79 STREET603/21/2026
215 E 79503/21/2026
KINGS GROUP NY409/30/2026
215 EAST 79TH STREET OWNERS303/21/2026
WALTER SAMUELS A A F OWNER303/21/2026
EAST 79 ST203/21/2026
RESIDENCE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING403/21/2026
SECOND FLOOR STUDIOS203/21/2026
JENNY FLORES EXPEDITING203/21/2026
LOIS ROSENBERG CONSULTANTS203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
BMB BUILDING CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/08/2026
TMS PLBG & HEATING CORPPlumbing407/08/2026
BSH CONTRACTING CORPGeneral Contractor403/21/2026
KINGS GROUP NY CORPGeneral Contractor309/30/2026
A.RODRIGUEZ CONS LLCGeneral Contractor207/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
PETER MICELI PLUMBINGPlumbing207/08/2026
TOUGH STALLION LLCElectrical103/21/2026
KENNETH FISKElectrical103/21/2026
BIRNBAUM, ALANElectrical103/21/2026
HEMANCHAL DEONARINEElectrical103/21/2026
CATHEDRA LLCGeneral Contractor108/26/2026
PROSTAR PLUMBING AND HEATPlumbing107/08/2026
GSA ELECTRIC CORP.Electrical103/22/2026
PAWLEY INTERIOR CONTRACTINGGeneral Contractor107/08/2026
ACCURATE MECHANICAL INCPlumbing107/08/2026
EIS ELECTRIC CORP DBAElectrical103/22/2026
PHILIP A. ROBINSONElectrical103/22/2026
TIKVAH ELECTRIC CO, INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HALO ARCHITECTURE PLLC8021204/28/2026
BRENT M. PORTER, ARCHITEC4140207/31/2025
PRUDIGM ENGINEERING LLCU4304103/27/2025
NEW AGE ENGINEERING PLLC7746103/21/2025
LANE ENGINEERING CONSULTI2967105/05/2021
Building Lifecycle
All (205)Filed (17)Permit Issued (20)Signed Off (8)Facade (FISP) (18)Violation (60)Inspection (11)Objection (44)Special Inspection (27)
09/29/2026
Permit issued — Sidewalk Shed
M01388150-I1-SH
09/21/2026
Filed — Alteration
M01460141-I1
08/05/2026
Permit issued — General Construction
M01391591-I1-GC
07/21/2026
Permit issued — Sidewalk Shed
M01388150-I1-SH
07/01/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Resolved
06/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/15/2026
Objection resolved — Resolved
05/21/2026
Objection resolved — Addressed
05/21/2026
Objection resolved — Addressed
05/21/2026
Objection resolved — Addressed
05/21/2026
Objection resolved — Addressed
05/19/2026
Objection raised — Cost
05/18/2026
Objection raised — Scope
05/18/2026
Objection raised — Other
05/18/2026
Objection raised — Structural
05/18/2026
Objection raised — Accessibility
05/18/2026
Objection raised — Structural
05/18/2026
Objection raised — Scope
05/06/2026
Signed off — Alteration
HEREBY FILING FOR THE REMOVAL, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01198982-I1
05/01/2026
Cycle 10 facade report submitted
05/01/2026
Cycle 10 facade report signed — UNSAFE
04/28/2026
Filed — Alteration
RELOCATION OF EXISTING PLUMBING FIXTURES AND INSTALLATION OF NEW (APPROXIMATELY 50 S.F.).NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01391591-I1
04/28/2026
Filed — Alteration
RELOCATION OF EXISTING PLUMBING FIXTURES AND INSTALLATION OF NEW (APPROXIMATELY 50 S.F.).NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01391591-S1
04/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
Hanli Liu
04/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
Hanli Liu
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
04/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
Hanli Liu
04/22/2026
Special inspection requirement — Final
Hanli Liu
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
04/21/2026
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
M01388150-I1
04/21/2026
Permit issued — Sidewalk Shed
M01388150-I1-SH
04/14/2026
Signed off — Alteration
Interior plumbing renovation of apartment. No change in use, occupancy, or egress proposed under this application
M01174956-I1
04/14/2026
Signed off — Alteration
Interior Renovation of an apartment. No change in use, occupancy, or egress proposed under this application.
M01174948-I1
04/08/2026
Signed off — Alteration
HEREBY FILING FOR THE REMOVAL, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01198982-S1
04/02/2026
Cycle 10 facade inspection completed
03/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/18/2025
Permit issued — Plumbing
M01253454-I1-PL
09/08/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
08/26/2025
Objection raised — Cost
08/26/2025
Objection raised — Scope
08/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/31/2025
Filed — Alteration
Scope includes removal of (5) existing plumbing fixtures and installation of (6) new fixtures: lavatory sink, shower, water closet, kitchen sink, dishwasher, and laundry washer, along with a flood-stop automatic shutoff valve for the laundry
M01253454-I1
07/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brent Porter
07/25/2025
Permit issued — General Construction
M01235119-I1-GC
07/09/2025
Objection resolved — Addressed
07/09/2025
Objection resolved — Addressed
07/03/2025
Objection raised — Admin
07/03/2025
Objection raised — Scope
06/27/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
06/27/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
06/23/2025
Permit issued — General Construction
M01198982-I1-GC
06/23/2025
Permit issued — Plumbing
M01198982-S1-PL
06/16/2025
Filed — Alteration
ALTERATION APPLICATION FOR MINOR RENOVATION MADE OF NON-LOAD BEARING PARTITION WORK, NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01235119-I1
06/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brent Porter
Latest 60 of 205 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP09/29/2026
DOB NOWGeneral ConstructionPermit IssuedCATHEDRA LLC08/05/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP07/21/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP04/21/2026
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING09/18/2025
DOB NOWGeneral ConstructionPermit IssuedBSH CONTRACTING07/25/2025
DOB NOWGeneral ConstructionSigned-offBSH CONTRACTING06/23/2025
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING06/23/2025
DOB NOWPlumbingSigned-offPROSTAR PLUMBING AND HEAT05/19/2025
DOB NOWGeneral ConstructionSigned-offPAWLEY INTERIOR CONTRACTI05/16/2025
DOB NOWPlumbingPermit IssuedTMS PLBG & HEATING CORP12/19/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/24/2022
DOB NOWGeneral ConstructionSigned-offRODCON GROUP LLC07/06/2022
DOB NOWPlumbingPermit IssuedTMS PLBG & HEATING CORP02/15/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/06/2021
DOB NOWGeneral ConstructionSigned-offRODCON GROUP LLC08/03/2021
DOB NOWPlumbingPermit IssuedTMS PLBG & HEATING CORP01/29/2021
DOB NOWPlumbingSigned-offANTHONY DISABATO01/19/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC12/08/2020
DOB NOWPlumbingPermit IssuedTMS PLBG & HEATING CORP01/31/2020
BISOTISSUEDKBRNY, INC04/13/2021
BISOTISSUEDKBRNY, INC04/13/2021
BISOTISSUEDLTI CONSTRUCTION CORP11/19/2020
BISOTISSUEDKBRNY, INC05/26/2020
BISOTISSUEDKBRNY, INC01/13/2020
BISPLISSUEDZONE PLUMBING & HEATING C01/04/2019
BISPLISSUEDTESTERMAN PLBG & HTG INC05/07/2018
BISOTISSUEDCUSTOM RENOVATION SERVICES INC04/27/2018
BISOTISSUEDCA CONSTRUCTION NY INC02/09/2018
BISOTISSUEDCA CONSTRUCTION NY INC01/05/2018
BISOTISSUEDSAMI CONSTRUCTION & REMOD04/11/2017
BISPLISSUEDPACIFIC PLBG&HTG CORP04/11/2017
BISPLISSUEDR.J.C. MECHANICAL CORP09/20/2016
BISOTISSUEDMASTER INSIDE CORP09/01/2016
BISOTISSUEDART-B CONSTRUCTION CORP08/22/2016
BISOTISSUEDART-B CONSTRUCTION CORP08/05/2016
BISEQISSUEDBILLY ENTERPRISES INC04/07/2016
BISPLISSUEDPAUL QUINN PLBG & HTG INC11/14/2014
BISOTISSUEDINTERIORS BY AJ LTD11/12/2014
BISPLISSUEDCC CONTROLLED PLBG CO INC11/05/2013
+ 30 more permits on file
3 projects · most recent 04/28/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/28/2026——Gas, Water/Sanitary
07/31/2025Signed-offPETER MICELI PLUMBINGWater/Sanitary
03/27/2025Signed-offPETER MICELI PLUMBINGGas, Water/Sanitary
17 projects · most recent 08/20/2026
General Wiring
FiledStatusContractorScope
08/20/2026CompleteW 8 ELECTRIC CORP—
04/07/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
04/03/2026CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
09/28/2022CompleteARGON ELECTRICAL CORP—
07/16/2022Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
07/13/2022CompleteARGON ELECTRICAL CORPGeneral Wiring
05/03/2022CompleteBNH ELECTRICAL CORPGeneral Wiring
10/08/2021CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
04/19/2021CompleteTIKVAH ELECTRIC CO, INC.—
12/15/2020CompleteTIKVAH ELECTRIC CO, INC.—
12/03/2020CompleteBOROWIDE ELECT'L CONTR'S—
09/15/2020CompletePHILIP A. ROBINSONGeneral Wiring
01/15/2020Permit IssuedGSA ELECTRIC CORP.General Wiring
11/02/2018CompleteGLENDALE ELECTL CONTNG IN—
06/21/2018CompletePOWER POINT ELECTRIC INC2 meters, 2 new_meters
1 project · most recent 04/21/2026
Sidewalk Shed
FiledStatusContractorScope
04/21/2026Permit IssuedKINGS GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/27/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/22/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
04/22/2026Fire-Resistance Rated ConstructionHanli Liuprogress
04/22/2026Tenant Protection Plan ComplianceHanli Liuspecial
04/22/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
04/22/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
04/22/2026Tenant Protection Plan ComplianceHanli Liuspecial
04/22/2026FinalHanli Liuprogress
04/22/2026Energy Code Compliance InspectionsHanli Liuprogress
07/30/2025Fire-Resistant Penetrations and JointsBrent Porterspecial
06/02/2025Fire-Resistant Penetrations and JointsBrent Porterspecial
03/26/2025Lighting in dwelling unitsJULIA FISHMANenergy_progress
03/26/2025Energy Code Compliance InspectionsJULIA FISHMANprogress
03/26/2025Lighting controlsJULIA FISHMANenergy_progress
03/21/2025FinalJULIA FISHMANprogress
03/21/2025HVAC-R and service water piping design and insulationJOSHUA KEAYenergy_progress
03/21/2025Fire-Resistant Penetrations and JointsNaeem Anwarspecial
03/21/2025Post-installed AnchorsNaeem Anwarspecial
02/04/2025Lighting in dwelling unitsJOSHUA KEAYenergy_progress
01/31/2025FinalJOSHUA KEAYprogress
01/31/2025Energy Code Compliance InspectionsJOSHUA KEAYprogress
01/31/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
09/14/2021Energy Code Compliance InspectionsMichael Faheyprogress
08/11/2021Energy Code Compliance InspectionsMichael Faheyprogress
04/27/2021MasonryDouglas Lanespecial
04/27/2021Structural Stability – Alterations of existing buildingsDouglas Lanespecial
04/27/2021FinalDouglas Laneprogress
Latest 25 of 27.
▾Documents — 305 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch11
09/03/2026M00511288-I1Request digital key ↗
09/02/2026M00798743-I1Request digital key ↗
08/24/2026M01174948-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00246526-I1Request digital key ↗
09/03/2026M00393412-P1Request digital key ↗
09/03/2026M00393412-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00431285-I1Request digital key ↗
▸Applications & Permits45
▸BISWORK PERMIT APPLICATION23
11/19/2020140953957Open ↗
01/13/2020123767673Open ↗
01/07/2019123122174Open ↗
Showing 3 of 23 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION22
11/18/2024123122174Open ↗
09/28/2020140953957Open ↗
11/08/2019123767673Open ↗
Showing 3 of 22 on file for this type
▸Seals & Professional Certifications65
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
11/08/2019123767673Open ↗
05/03/2019123438182Open ↗
05/03/2019123438182Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/05/2026M00246526-I1Open ↗
09/03/2026M00393412-P1Open ↗
09/03/2026M00393412-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026M01198982-I1Open ↗
09/01/2026M01198982-I1Open ↗
09/01/2026M01198982-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/22/2026M01235119-I1Open ↗
09/01/2026M01198982-I1Open ↗
09/01/2026M01198982-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/30/2016140476946Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/23/2020140953957Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/30/2016140476946Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/30/2016140476946Open ↗
▸Trade Schedules & Equipment24
▸BISSELF-CERT PLUMBING NOTICE8
06/30/2015122187070Open ↗
03/06/2015122187070Open ↗
11/13/2013121144047Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
08/13/2019123122174Open ↗
12/19/2018123122174Open ↗
03/29/2018123438182Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING4
11/05/2013121144047Open ↗
10/03/2013121144047Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
09/26/2013121144047Open ↗
09/26/2013121144047Open ↗
06/05/2013121144047Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
11/26/2013121144047Open ↗
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes6
09/23/2020140953957Open ↗
11/08/2019123767673Open ↗
08/23/2017123122174Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan4
09/03/2026M00393412-P2Open ↗
08/14/2026M00393412-I1Open ↗
08/13/2026M00246526-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
03/29/2018123438182Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos26
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
10/22/2020140953957Open ↗
09/28/2020140953957Open ↗
11/08/2019123767673Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/05/2026M00246526-I1Open ↗
09/03/2026M00393412-P1Open ↗
09/03/2026M00393412-P2Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
01/10/2013121481155Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
11/08/2019123767673Open ↗
05/03/2019123438182Open ↗
08/10/2018123060597Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
10/06/2021140953957Open ↗
05/03/2019123438182Open ↗
08/10/2018123060597Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/06/2021140953957Open ↗
09/24/2021140953957Open ↗
09/23/2020140953957Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/03/2014121144047Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/22/2025123122174Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/22/2025123122174Open ↗
▸BISLIGHTING CONTROLS1
01/22/2025123122174Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
01/22/2025123122174Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/06/2021140953957Open ↗
10/06/2021140953957Open ↗
09/24/2021140953957Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/22/2025123122174Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
01/23/2025123122174Open ↗
10/06/2021140953957Open ↗
05/03/2019123438182Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
01/10/2013121481155Open ↗
Showing 1 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/01/2015122187070Open ↗
▸BISFINAL1
01/22/2025123122174Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT23
10/06/2021140953957Open ↗
10/22/2020140953957Open ↗
09/23/2020140953957Open ↗
Showing 3 of 23 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/22/2025123122174Open ↗
01/22/2025123122174Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
08/02/2016122707160Open ↗
▸Filing & Intake Forms28
▸BISEFILING COVER SHEET10
11/08/2019123767673Open ↗
03/29/2018123438182Open ↗
08/23/2017123122174Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION9
10/22/2020140953957Open ↗
08/23/2019123122174Open ↗
01/14/2019123122174Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM7
08/13/2019123122174Open ↗
05/03/2019123438182Open ↗
12/19/2018123122174Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/23/2020140953957Open ↗
03/30/2016140476946Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/13/2017123060597Open ↗
Showing 1 of 2 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
04/27/2018123438182Open ↗