← Back
BuildNYC
Elevator apt, fireproof with stores
215 MADISON AVENUE
MANHATTAN · BIN 1017129
💬 Discuss this project
1927Year Built
10Stories
D6Building Class
R10Zoning
60,300 sfGross Floor Area
44Units
LL97 CoveredRent Stabilized33 Active Violations ▸FISP: SAFE
Elevator apt, fireproof with stores · 7,550 sf lot · 7.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofEagle Point Properties LLCUnder Construction7p · 2 filings · 7 docs
Floor 3Unit 3D1 filing · 11 docs
Floor 2
Floor 1
Site & exteriorEagle Point Properties LLC15p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Iuc 215 Madison Ave3903/22/2026
Eagle Point Properties1307/08/2026
Infinity Collective103/22/2026
Venture Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Socotec110/03/2023
Enthink Engineers103/06/2023
EP Engineering111/24/2020
AR Consulting Engineer110/23/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
Rybak Development203/21/2026
Distinct Enterprises203/21/2026
PS Engineers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold407/08/2026
JanbarScaffold203/21/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Paolino FrankElectrical103/21/2026
Paul's ElectricElectrical103/22/2026
Cedar Electrical ContractorsElectrical103/21/2026
Walton Electrical ConstructionElectrical103/21/2026
Preserv BLD Restoration ManagementGeneral Contractor107/08/2026
DMMP Electric ConstructionElectrical103/21/2026
DMMP Electric ConstructionElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec301110/03/2023
EP Inspections and Commis7079111/24/2020
Building Lifecycle
All (102)Filed (6)Permit Issued (6)Signed Off (2)Facade (FISP) (18)Violation (60)Special Inspection (10)
08/31/2026
Permit issued — Suspended Scaffold
M01420893-I1-SC
08/06/2026
Filed — Alteration
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: GABRIEL HURTADO
M01420893-I1
04/29/2026
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, closed)
I
04/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00837654-I1
04/19/2024
Cycle 9 facade report signed — SAFE
04/01/2024
Violation issued (HPD, open)
A
03/26/2024
Signed off — Alteration
Facade restoration. No change in egress, use or occupancy.
M00908095-I1
03/12/2024
Permit issued — Sidewalk Shed
M00837654-I1-SH
02/26/2024
Cycle 9 facade report submitted
02/22/2024
Violation issued (ECB, closed)
Local Law
02/16/2024
Cycle 9 facade inspection completed
12/19/2023
Permit issued — Suspended Scaffold
M00968504-I1-SC
12/04/2023
Filed — Alteration
M00968504-I1
10/13/2023
Permit issued — General Construction
M00908095-I1-GC
10/03/2023
Filed — Alteration
Facade restoration. No change in egress, use or occupancy.
M00908095-I1
10/03/2023
Special inspection requirement — Masonry
Stanford Chan
07/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
Stanford Chan
07/21/2023
Special inspection requirement — Final
Stanford Chan
03/16/2023
Cycle 9 facade report submitted
03/16/2023
Cycle 9 facade report signed — UNSAFE
03/16/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2023
Violation issued (HPD, open)
A
03/11/2023
Cycle 9 facade inspection completed
03/06/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00837654-I1
03/06/2023
Permit issued — Sidewalk Shed
M00837654-I1-SH
02/02/2023
Violation issued (ECB, closed)
Local Law
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/09/2022
Violation issued (HPD, closed)
C
03/09/2022
Violation issued (HPD, open)
C
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2022
Violation issued (HPD, open)
A
02/15/2022
Violation issued (HPD, closed)
I
06/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/06/2021
Violation issued (HPD, open)
C
04/01/2021
Violation issued (HPD, open)
A
04/01/2021
Violation issued (HPD, closed)
I
03/28/2021
Violation issued (HPD, closed)
C
03/19/2021
Violation issued (HPD, open)
C
03/19/2021
Violation issued (HPD, closed)
C
11/24/2020
Filed — Alteration
Mechanical modification work to include installation of residential kitchen ventilation system and associated ductwork in conjunction with proposed interior renovation of apartment 3D as indicated on plans herewith.
M00422720-I1
11/23/2020
Special inspection requirement — Maintenance information
Christopher Burgess
11/23/2020
Special inspection requirement — Shutoff dampers
Christopher Burgess
11/02/2020
Special inspection requirement — Mechanical Systems
Christopher Burgess
11/02/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
11/02/2020
Special inspection requirement — Final
Christopher Burgess
11/02/2020
Special inspection requirement — Post-installed Anchors
Christopher Burgess
11/02/2020
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/2019
Violation issued (ECB, closed)
Construction
04/24/2019
Violation issued (ECB, closed)
Construction
03/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2018
Violation issued (ECB, closed)
Unknown
12/27/2018
Violation issued (ECB, closed)
Unknown
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedStreamline Consultants NY08/31/2026
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/12/2024
DOB NOWSuspended ScaffoldPermit IssuedPreserv BLDNG RST Management I12/19/2023
DOB NOWGeneral ConstructionSigned-offPreserv BLD Restoration Management10/13/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/06/2023
DOB NOWSupported ScaffoldPermit IssuedJanbar10/24/2018
BISOTISSUEDRivas Restoration11/30/2020
BISPLISSUEDJulian Plumbing & Heating08/30/2019
BISOTISSUEDM.N.C. General Contractors07/23/2019
BISEQISSUEDIntersystem Installation02/11/2019
BISPLISSUEDJulian Plumbing & Heating09/12/2018
BISOTISSUEDJanbar06/04/2018
BISOTISSUEDJanbar05/23/2018
BISEQISSUEDIntersystem S&S02/02/2018
BISOTISSUEDJanbar10/20/2017
BISOTISSUEDJanbar08/11/2017
BISEQISSUEDIntersystem S&S02/08/2017
BISPLISSUEDZara Plumbing10/29/2015
BISOTISSUEDEast Coast Petroleum09/25/2015
BISPLISSUEDEast Coast Mechanical09/25/2015
BISPLISSUEDCrown Plumbing06/18/2015
BISPLISSUEDCrown Plumbing01/14/2015
BISOTISSUEDStreamline11/17/2014
BISOTISSUEDStreamline11/17/2014
BISOTISSUEDStreamline10/31/2014
BISOTISSUEDPtu Construction10/23/2014
BISOTISSUEDPtu Construction08/21/2014
BISPLISSUEDCrown Plumbing07/22/2014
BISOTISSUEDCapitol Awning Co07/07/2014
BISPLISSUEDCrown Plumbing05/12/2014
BISPLISSUEDZara Plumbing04/10/2014
BISMHISSUEDStreamline03/10/2014
BISEQISSUEDJanbar03/07/2014
BISOTISSUEDStreamline01/28/2014
BISOTISSUEDStreamline01/28/2014
BISOTISSUEDStreamline01/28/2014
BISOTISSUEDStreamline11/12/2013
BISOTISSUEDStreamline11/06/2013
BISOTISSUEDStreamline08/27/2013
BISPLISSUEDCrown Plumbing08/14/2013
+ 9 more permits on file
1 project · most recent 11/24/2020
Associated Ducts and Piping
FiledStatusContractorScope
11/24/2020——Associated Ducts and Piping
7 projects · most recent 03/13/2023
General Wiring
FiledStatusContractorScope
03/13/2023CompleteBorowide Elect'l Contractors—
01/06/2022Permit IssuedDMMP Electric ConstructionGeneral Wiring
01/13/2021Permit IssuedDMMP Electric ConstructionGeneral Wiring
03/17/2020CancelledDMMP Electric ConstructionGeneral Wiring
05/07/2019CompletePaul's ElectricGeneral Wiring
04/28/2019CompletePaul's ElectricGeneral Wiring
01/21/2019CompleteSteven Farkas—
1 project · most recent 08/06/2026
FiledStatusContractorScope
08/06/2026Permit IssuedStreamline Consultants NY—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/03/2023MasonryStanford Chanspecial
07/21/2023Tenant Protection Plan ComplianceStanford Chanspecial
07/21/2023FinalStanford Chanprogress
11/23/2020Maintenance informationChristopher Burgessenergy_progress
11/23/2020Shutoff dampersChristopher Burgessenergy_progress
11/02/2020Mechanical SystemsChristopher Burgessspecial
11/02/2020Fire-Resistant Penetrations and JointsChristopher Burgessspecial
11/02/2020FinalChristopher Burgessprogress
11/02/2020Post-installed AnchorsChristopher Burgessspecial
11/02/2020Energy Code Compliance InspectionsChristopher Burgessprogress
▾Documents — 322 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/06/2026M00090033-I1Request digital key ↗
08/31/2026M00837654-I1Request digital key ↗
08/29/2026M00908095-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00422720-I1Request digital key ↗
▸Applications & Permits68
▸BISWORK PERMIT APPLICATION39
11/30/2020140981196Open ↗
10/31/2019123213183Open ↗
07/23/2019123213183Open ↗
Showing 3 of 39 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION29
01/12/2021140981196Open ↗
01/07/2021140981196Open ↗
11/24/2020140981196Open ↗
Showing 3 of 29 on file for this type
▸Seals & Professional Certifications70
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
04/05/2019140602293Open ↗
02/05/2019140602293Open ↗
07/23/2018140675614Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
11/24/2020140981196Open ↗
02/16/2018123213183Open ↗
02/03/2017140602293Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
11/24/2020140981196Open ↗
02/03/2017140602293Open ↗
09/24/2015140406166Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
11/24/2020140981196Open ↗
02/03/2017140602293Open ↗
09/24/2015140406166Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026M00422720-I1Open ↗
08/26/2026M00422720-I1Open ↗
08/26/2026M00422720-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/16/2018123213183Open ↗
10/16/2014122129348Open ↗
07/14/2014122056915Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026M00422720-I1Open ↗
08/26/2026M00422720-I1Open ↗
08/26/2026M00422720-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/06/2026M00090033-I1Open ↗
09/04/2026M00422720-I1Open ↗
08/13/2026M00837654-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/01/2017140675614Open ↗
▸Trade Schedules & Equipment18
▸BISSELF-CERT PLUMBING NOTICE8
12/28/2015140406166Open ↗
11/25/2015140406166Open ↗
11/25/2015140406166Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING5
09/24/2015140406166Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
09/18/2019123213183Open ↗
09/12/2019123213183Open ↗
01/16/2019123213183Open ↗
Showing 3 of 4 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
04/14/2014140168039Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes2
02/16/2018123213183Open ↗
08/01/2017140675614Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
01/12/2021140981196Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/28/2014121738575Open ↗
▸BISSTREET TREE CHECKLIST1
11/24/2020140981196Open ↗
▸DOB NOWTenant Protection Plan1
09/04/2026M00422720-I1Open ↗
▸Environmental & Asbestos22
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
01/12/2021140981196Open ↗
01/07/2021140981196Open ↗
11/24/2020140981196Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/06/2026M00090033-I1Open ↗
09/04/2026M00422720-I1Open ↗
08/13/2026M00908095-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
11/30/2020140981196Open ↗
06/04/2018123213183Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
11/24/2020140981196Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
07/23/2018140675614Open ↗
02/16/2018123213183Open ↗
03/24/2016121738575Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
01/12/2021140981196Open ↗
11/30/2020140981196Open ↗
11/24/2020140981196Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
06/16/2020123213183Open ↗
07/23/2018140675614Open ↗
03/24/2016121738575Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/24/2020140981196Open ↗
09/24/2015140406166Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY13
01/12/2021140981196Open ↗
01/12/2021140981196Open ↗
11/30/2020140981196Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
06/16/2020123213183Open ↗
04/05/2019140602293Open ↗
07/23/2018140675614Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/23/2019123213183Open ↗
11/20/2014140139721Open ↗
11/05/2014121738575Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER1
02/12/2019140602293Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
11/24/2020140981196Open ↗
▸BISSHED LETTER1
02/12/2019140602293Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT23
11/24/2020140981196Open ↗
06/16/2020123213183Open ↗
07/23/2018140675614Open ↗
Showing 3 of 23 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms28
▸BISEFILING COVER SHEET10
02/16/2018123213183Open ↗
10/16/2014122129348Open ↗
07/14/2014122056915Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
09/12/2019123213183Open ↗
08/09/2019123213183Open ↗
08/02/2019123213183Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
11/24/2020140981196Open ↗
08/01/2017140675614Open ↗
02/03/2017140602293Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
01/12/2021140981196Open ↗
09/18/2019123213183Open ↗
03/01/2019123213183Open ↗
Showing 3 of 5 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
01/12/2021140981196Open ↗
01/12/2021140981196Open ↗
11/24/2020140981196Open ↗
Showing 3 of 6 on file for this type
▸BISSupporting Document: Fee Exempt3
01/06/2016140406166Open ↗
01/06/2016140406166Open ↗
01/21/2015140139721Open ↗
▸DOB NOWIRA Certification1
08/16/2026M01420893-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00968504-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00968504-I1Open ↗