← Back
BuildNYC
One story - permanent living quarter
215 PRINCETON AVENUE
STATEN ISLAND · BIN 5058117
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R3XZoning
600 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: 215 Princeton Realty · 5,000 sf lot · 0.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issued21p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
215 Princeton Realty310/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ameriland Brook209/17/2026
Celtic Way Consulting109/17/2026
Building Lifecycle
10/20/2026
Objection raised — Scope
09/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILE SOE IN CONJUNCTION WITH JOB#S01419967
S01419967-S4
09/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILE SOE IN CONJUNCTION WITH JOB#S01419967
S01419967-S2
08/27/2026
Objection resolved — Open
06/30/2026
Objection raised — Scope
36 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 09/17/2026
Heating Systems
FiledStatusContractorScope
09/17/2026——Heating Systems
1 project · most recent 09/17/2026
Steel Masonry Wood
FiledStatusContractorScope
09/17/2026——Steel, Masonry, Wood
1 project · most recent 09/17/2026
Fence
FiledStatusContractorScope
09/17/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
06/21/2026Masonry—special
06/21/2026Structural Steel - Details—special
06/21/2026Structural Stability – Alterations of existing buildings—special
06/21/2026Mechanical Systems—special
06/21/2026Concrete - Cast-In-Place—special
06/21/2026Fire-Resistant Penetrations and Joints—special
06/21/2026Heating Systems—special
06/21/2026Structural Steel - High Strength Bolting—special
06/21/2026Structural Steel - Welding—special
06/21/2026Subgrade Inspections—special
06/21/2026Final—progress
06/21/2026Footing and Foundation—progress
06/21/2026Energy Code Compliance Inspections—progress
06/21/2026Fire-Resistance Rated Construction—progress
06/21/2026Structural Wood Frame—progress
06/21/2026Fenestration areas—energy_progress
06/21/2026Insulation placement and R values—energy_progress
06/21/2026Electric vehicle service equipment requirements—energy_progress
06/21/2026Air barrier — testing —energy_progress
06/21/2026HVAC-R and service water heating equipment—energy_progress
06/21/2026Air barrier - visual inspection—energy_progress
06/21/2026HVAC-R and service water heating system controls—energy_progress
06/21/2026Permanent certificate—energy_progress
06/21/2026Interior lighting power—energy_progress
06/21/2026HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 32.
11 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account