← Back
Four families
215 SOUTH 4 STREET
BROOKLYN · Williamsburg · BIN 3063321
💬 Discuss this project
1899Year Built
3Stories
C3Building Class
R6Zoning
3,822 sfGross Floor Area
4Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Four families · Owner of record: S4 LOFTS 2 LLC · 1,995 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof18p · 1 filing · 20 docs
Penthouse32p · 1 filing · 20 docs
Floor 340p · 1 filing · 20 docs
Floor 240p · 1 filing · 20 docs
Floor 140p · 1 filing · 20 docs
Mezzanine8p · 1 filing · 20 docs
Cellar40p · 1 filing · 20 docs
Basement39p · 1 filing · 20 docs
Site & exterior8p · 3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GW EQUITIES3204/09/2026
J G CONSTRUCTION SRVCS704/09/2026
S4 LOFTS203/21/2026
S4 LOFTS 2 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/27/2024$2.5M—— → —$654/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAOBAB ARCHITECTS P.C.810/29/2025
ASHRAF CORP209/04/2024
CHOSEN MEP, CORP.305/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADOR BUILDERS LLCGeneral Contractor504/09/2026
J & G CONSTRUCTION SVCSGeneral Contractor204/09/2026
AYYUB ELECTRIC CORPElectrical103/22/2026
DOUG'S PLBG & HTG SERV COFire Protection107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524710/29/2025
HRF SERVICES CORP5616211/18/2024
Building Lifecycle
All (91)Filed (13)Permit Issued (9)Signed Off (8)Violation (5)Inspection (10)Objection (16)Special Inspection (30)
08/31/2026
Violation issued (HPD, open)
B
08/31/2026
Violation issued (HPD, open)
B
11/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2025
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
11/20/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
11/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
11/20/2025
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
11/20/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
11/20/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
11/20/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
11/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
11/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
11/20/2025
Special inspection requirement — Protection of exposed foundation insulation
Shahrish Shuvo
11/20/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
11/20/2025
Special inspection requirement — Metering
Shahrish Shuvo
11/20/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
11/20/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
11/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
10/29/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
ALTERATION APPLICATION FOR VERITCAL - HORIZANTAL ENLARGEMENT TO EXISTING 4 STORY + CELLAR RESIDENTIAL USE BUILDING. PROPOSED 4 STORY + CELLAR + PENTHOUSE RESIDENTIAL USE BUILDING.
B00995327-P4
10/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/12/2025
Violation issued (HPD, closed)
B
06/30/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
ALTERATION APPLICATION FOR VERITCAL - HORIZANTAL ENLARGEMENT TO EXISTING 4 STORY + CELLAR RESIDENTIAL USE BUILDING. PROPOSED 4 STORY + CELLAR + PENTHOUSE RESIDENTIAL USE BUILDING.
B00995327-P3
06/10/2025
Violation issued (HPD, closed)
A
05/16/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
ALTERATION APPLICATION FOR VERITCAL - HORIZANTAL ENLARGEMENT TO EXISTING 4 STORY + CELLAR RESIDENTIAL USE BUILDING. PROPOSED 4 STORY + CELLAR + PENTHOUSE RESIDENTIAL USE BUILDING.
B00995327-P2
05/09/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
05/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
05/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
05/09/2025
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
05/09/2025
Special inspection requirement — Metering
Shahrish Shuvo
05/09/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
05/09/2025
Special inspection requirement — Protection of exposed foundation insulation
Shahrish Shuvo
05/09/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
05/09/2025
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
05/09/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
05/09/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
05/09/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
03/22/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
ALTERATION APPLICATION FOR VERITCAL - HORIZANTAL ENLARGEMENT TO EXISTING 4 STORY + CELLAR RESIDENTIAL USE BUILDING. PROPOSED 4 STORY + CELLAR + PENTHOUSE RESIDENTIAL USE BUILDING.
B00995327-S5
02/23/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
ALTERATION APPLICATION FOR VERITCAL - HORIZANTAL ENLARGEMENT TO EXISTING 4 STORY + CELLAR RESIDENTIAL USE BUILDING. PROPOSED 4 STORY + CELLAR + PENTHOUSE RESIDENTIAL USE BUILDING.
B00995327-S4
02/23/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
ALTERATION APPLICATION FOR VERITCAL - HORIZANTAL ENLARGEMENT TO EXISTING 4 STORY + CELLAR RESIDENTIAL USE BUILDING. PROPOSED 4 STORY + CELLAR + PENTHOUSE RESIDENTIAL USE BUILDING.
B00995327-S2
02/23/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
ALTERATION APPLICATION FOR VERITCAL - HORIZANTAL ENLARGEMENT TO EXISTING 4 STORY + CELLAR RESIDENTIAL USE BUILDING. PROPOSED 4 STORY + CELLAR + PENTHOUSE RESIDENTIAL USE BUILDING.
B00995327-S3
02/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/06/2025
Signed off — Alteration
B01101361-I1
01/06/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01101362-I1
01/02/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
ALTERATION APPLICATION FOR VERITCAL - HORIZANTAL ENLARGEMENT TO EXISTING 4 STORY + CELLAR RESIDENTIAL USE BUILDING. PROPOSED 4 STORY + CELLAR + PENTHOUSE RESIDENTIAL USE BUILDING.
B00995327-S1
01/01/2025
Signed off — Alteration
HEREBY FILING FENCE APPLICATION IN CONJUNTION TO ALT-CO B00995327-I1.
B01068909-I1
12/10/2024
Permit issued — Sprinklers
B00995327-S5-EW-SP
12/06/2024
Permit issued — Mechanical Systems
B00995327-S3-MS
11/26/2024
Objection resolved — Addressed
11/22/2024
Objection raised — Cost
11/18/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
ALTERATION APPLICATION FOR VERITCAL - HORIZANTAL ENLARGEMENT TO EXISTING 4 STORY + CELLAR RESIDENTIAL USE BUILDING. PROPOSED 4 STORY + CELLAR + PENTHOUSE RESIDENTIAL USE BUILDING.
B00995327-P1
10/16/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/11/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDOUG'S PLBG & HTG SERV CO12/10/2024
DOB NOWMechanical SystemsSigned-offADOR BUILDERS LLC12/06/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS09/05/2024
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS09/05/2024
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC08/29/2024
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC07/09/2024
DOB NOWConstruction FenceSigned-offADOR BUILDERS LLC07/02/2024
DOB NOWStructuralPermit IssuedADOR BUILDERS LLC06/26/2024
DOB NOWFoundationSigned-offADOR BUILDERS LLC06/26/2024
BISPLISSUEDAINLAND PLG & HTG INC08/06/1998
BIS—ISSUEDNEW YORK CITY CORP BLDRS INC06/18/1998
3 projects · most recent 05/02/2025
General Wiring
FiledStatusContractorScope
05/02/2025CompleteDAVRY ELECTRIC INCGeneral Wiring
09/22/2024CompleteAYYUB ELECTRIC CORPGeneral Wiring
08/23/2024CompleteRICHARD NEU—
1 project · most recent 10/29/2025
Steel Masonry
FiledStatusContractorScope
10/29/2025Signed-offDOUG'S PLBG & HTG SERV COSteel, Masonry
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/11/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
11/20/2025Lighting in dwelling unitsShahrish Shuvoenergy_progress
11/20/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
11/20/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
11/20/2025Exterior lighting powerShahrish Shuvoenergy_progress
11/20/2025Fenestration air leakageShahrish Shuvoenergy_progress
11/20/2025Maintenance informationShahrish Shuvoenergy_progress
11/20/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
11/20/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
11/20/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
11/20/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
11/20/2025Protection of exposed foundation insulationShahrish Shuvoenergy_progress
11/20/2025Lighting controlsShahrish Shuvoenergy_progress
11/20/2025MeteringShahrish Shuvoenergy_progress
11/20/2025Interior lighting powerShahrish Shuvoenergy_progress
11/20/2025Fenestration areasShahrish Shuvoenergy_progress
11/20/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
05/09/2025Maintenance informationShahrish Shuvoenergy_progress
05/09/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/09/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
05/09/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
05/09/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
05/09/2025Lighting in dwelling unitsShahrish Shuvoenergy_progress
05/09/2025MeteringShahrish Shuvoenergy_progress
05/09/2025Fenestration air leakageShahrish Shuvoenergy_progress
05/09/2025Protection of exposed foundation insulationShahrish Shuvoenergy_progress
Latest 25 of 48.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/25/2026B00995327-P1Request digital key ↗
08/25/2026B00995327-P4Request digital key ↗
08/25/2026B00995327-P3Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
01/13/2025340910483Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/26/2024300721137Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00995327-P2Open ↗
08/13/2026B00995327-P4Open ↗
08/13/2026B00995327-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B00995327-P2Open ↗
08/13/2026B00995327-I1Open ↗
08/13/2026B00995327-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00995327-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026B00995327-S4Open ↗
08/25/2026B00995327-P4Open ↗
08/25/2026B00995327-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B00995327-I1Open ↗
09/01/2026B00995327-I1Open ↗
09/01/2026B00995327-S4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00995327-I1Open ↗
08/27/2026B00995327-S1Open ↗
08/23/2026B00995327-S3Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/24/2024340910483Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B00995327-P4Open ↗
08/13/2026B00995327-P1Open ↗
08/13/2026B00995327-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸BISBPP: STREET TREES SITE PLAN1
06/24/2024340910483Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00995327-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00995327-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00995327-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/25/2026B00995327-S4Open ↗
08/25/2026B00995327-P3Open ↗
08/25/2026B00995327-P2Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/24/2024340910483Open ↗
▸Other Documents18
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00995327-P1Open ↗
08/13/2026B00995327-P3Open ↗
08/13/2026B00995327-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/25/2026B00995327-I1Open ↗
08/25/2026B00995327-P4Open ↗
08/25/2026B00995327-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026B00995327-P4Open ↗
08/13/2026B00995327-P2Open ↗
08/13/2026B00995327-P3Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
06/24/2024340910483Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00995327-S1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00995327-I1Open ↗