← Back
BuildNYC
Walk-up cooperative
215 WEST 144TH STREET
MANHATTAN · BIN 1060452
💬 Discuss this project
1940Year Built
6Stories
C6Building Class
R7-2Zoning
34,560 sfGross Floor Area
41Units
LL97 CoveredRent Stabilized549 Active Violations 548 unresolved · 1 paperwork only 1 likely answered 2 old, status unconfirmed ▸
Walk-up cooperative · Owner of record: 219-229 W 144 St Tenants Associates HDFC · 7,993 sf lot · 4.32 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMechanical cellar work1p · 1 filing · 3 docs
Floor 1Heavy duty sidewalk shed installationUnder Construction5p · 1 filing · 2 docs
CellarMechanical cellar work11p · 3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development403/21/2026
219-229 W 144 St Tenants Associates HDFC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mje Professional Services107/23/2025
Bazini Engineering403/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Richard Mortman203/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
The Metro GroupGeneral Contractor603/21/2026
Reliable EnterprisesScaffold310/20/2026
Deltex Electrical Cont. IElectrical103/22/2026
K.N.C. ElectricElectrical103/22/2026
The Metro Group ElectricElectrical103/22/2026
National Mechanical Services PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808403/30/2022
Building Lifecycle
All (78)Filed (5)Permit Issued (7)Signed Off (2)Violation (60)Inspection (3)Special Inspection (1)
10/19/2026
Permit issued — Sidewalk Shed
M01259899-I1-SH
07/23/2026
Permit issued — Sidewalk Shed
M01259899-I1-SH
04/29/2026
Violation issued (HPD, open)
A
12/18/2025
Violation issued (HPD, open)
C
12/18/2025
Violation issued (HPD, open)
B
12/16/2025
Violation issued (HPD, open)
B
12/16/2025
Violation issued (HPD, open)
B
12/16/2025
Violation issued (HPD, open)
B
12/16/2025
Violation issued (HPD, open)
A
12/16/2025
Violation issued (HPD, open)
C
12/16/2025
Violation issued (HPD, open)
C
12/16/2025
Violation issued (HPD, open)
A
12/15/2025
Violation issued (HPD, open)
B
12/15/2025
Violation issued (HPD, open)
C
12/01/2025
Violation issued (HPD, open)
B
12/01/2025
Violation issued (HPD, open)
B
12/01/2025
Violation issued (HPD, open)
B
11/19/2025
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2025
Violation issued (HPD, open)
A
11/10/2025
Violation issued (HPD, open)
B
11/10/2025
Violation issued (HPD, open)
C
11/10/2025
Violation issued (HPD, open)
A
10/23/2025
Violation issued (HPD, open)
C
10/23/2025
Violation issued (HPD, open)
B
10/23/2025
Violation issued (HPD, open)
C
10/23/2025
Violation issued (HPD, open)
B
10/23/2025
Violation issued (HPD, open)
C
10/06/2025
Violation issued (HPD, open)
A
10/06/2025
Violation issued (HPD, open)
B
10/06/2025
Violation issued (HPD, closed)
A
10/03/2025
Violation issued (HPD, open)
B
10/03/2025
Violation issued (HPD, open)
B
10/03/2025
Violation issued (HPD, open)
C
10/03/2025
Violation issued (HPD, open)
C
10/03/2025
Violation issued (HPD, open)
C
10/03/2025
Violation issued (HPD, open)
C
10/03/2025
Violation issued (HPD, open)
B
10/02/2025
Violation issued (HPD, closed)
C
09/17/2025
Violation issued (HPD, open)
C
09/17/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, open)
C
09/17/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, open)
C
09/17/2025
Violation issued (HPD, open)
C
09/17/2025
Violation issued (HPD, open)
A
09/17/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, open)
C
09/17/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, open)
C
09/12/2025
Violation issued (HPD, open)
B
09/12/2025
Violation issued (HPD, closed)
A
09/12/2025
Violation issued (HPD, open)
B
09/12/2025
Violation issued (HPD, open)
C
09/12/2025
Violation issued (HPD, open)
C
09/12/2025
Violation issued (HPD, open)
B
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises10/19/2026
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises07/23/2026
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises07/23/2025
DOB NOWMechanical SystemsPermit IssuedThe Metro Group01/25/2022
DOB NOWPlumbingSigned-offNational Mechanical Services Plumbing12/20/2021
DOB NOWMechanical SystemsPermit IssuedThe Metro Group12/20/2021
DOB NOWBoiler EquipmentSigned-offRichard Mortman12/20/2021
BISEQISSUEDAccess Construction08/13/1992
BISOTISSUEDAccess Construction08/13/1992
BISPLISSUEDI Hope Plumbing & Heating Co03/24/1992
BISOTISSUEDI Hope Plumbing & Heating Co03/24/1992
BISPLISSUEDSt Marks Plumbing Co07/30/1991
BISPLISSUEDE & J Plumbing04/10/1991
BISOTISSUEDS & M Combustion04/10/1991
6 projects · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025CompleteDeltex Electrical Cont. I—
07/25/2025Permit IssuedRichard Neu—
06/24/2025Permit IssuedDeltex Electrical Cont. IGeneral Wiring
06/17/2025CompleteTelecommunication Electric Co—
12/22/2021Permit IssuedThe Metro Group Electric—
02/26/2020Permit IssuedK.N.C. Electric1 meters
1 project · most recent 07/23/2025
Sidewalk Shed
FiledStatusContractorScope
07/23/2025Permit IssuedReliable EnterprisesSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/19/2022Pass-Final Boiler Equipment InspectionPassView ↗
04/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
03/30/2022Fire-Resistant Penetrations and JointsJoseph Bazinispecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026M00624346-I1Request digital key ↗
09/03/2026M00629796-I1Request digital key ↗
09/03/2026M00624355-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026M00624346-I1Open ↗
09/03/2026M00629796-I1Open ↗
08/13/2026M00624355-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026M00624355-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00624346-I1Open ↗
09/03/2026M00629796-I1Open ↗
08/13/2026M00624355-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00624346-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00624346-I1Open ↗