← Back
BuildNYC
Elevator apt, miscellaneous
215 WEST 20TH STREET
MANHATTAN · BIN 1078590
💬 Discuss this project
1910Year Built
7Stories
D9Building Class
R8BZoning
26,250 sfGross Floor Area
13Units
Rent Stabilized0 Active Violations 1 likely answered ▸FISP: SWARMP
Elevator apt, miscellaneous · Owner of record: Minjak · 4,034 sf lot · 6.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade and structural repairsUnder Construction6p · 4 filings · 20 docs
BulkheadIndependent protected bulkhead wrapsUnder Construction2p · 1 filing · 2 docs
Floor 7Heat pump replacement for air conditioning units4p · 1 filing · 12 docs
Floor 6Unit 6W2 filings · 6 docs
Floor 5
Floor 4
Floor 3
Floor 2Heat pump replacement for air conditioning units4p · 1 filing · 12 docs
Floor 1Unit 3W1 filing · 6 docs
CellarHeat pump replacement for air conditioning units5p · 1 filing · 12 docs
Site & exteriorFacade and structural repairsUnder Construction6p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Minjak1603/21/2026
Tristar203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vincent Liotta110/07/2026
Arquitectura Varela207/03/2023
Cany Architecture & Engineering105/04/2023
Shahrish Shuvo Engineering111/30/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants103/21/2026
PDG Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hobo Construction CoGeneral Contractor607/08/2026
R & L SystemsElectrical203/21/2026
Power Air CondGeneral Contractor203/21/2026
Alliance Elevator CompanyElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vincent J. Liotta P. E1974110/07/2026
Butterfield & O'Connor4189107/03/2023
Outsource Special Inspection2827105/04/2023
Shahrish Consulting5702111/30/2020
Building Lifecycle
All (84)Filed (8)Permit Issued (8)Signed Off (2)Facade (FISP) (18)Violation (25)Objection (4)Special Inspection (19)
10/07/2026
Filed — Alteration
M01462890-I1
09/21/2026
Special inspection requirement — Mechanical Systems
Vincent Liotta
09/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
09/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
09/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
09/21/2026
Special inspection requirement — Maintenance information
Vincent Liotta
09/21/2026
Special inspection requirement — Final
Vincent Liotta
08/14/2026
Permit issued — Suspended Scaffold
M01428723-I1-SC
07/09/2026
Filed — Alteration
IRA to assist in Condition Assessment.
M01428723-I1
05/07/2026
Permit issued — General Construction
M00848692-I1-GC
08/04/2025
Cycle 9 facade report submitted
08/04/2025
Cycle 9 facade report signed — SWARMP
06/24/2025
Cycle 9 facade inspection completed
06/03/2025
Permit issued — Suspended Scaffold
M01233462-I1-SC
05/30/2025
Permit issued — Structural
M00848692-I1-GC
05/29/2025
Filed — Alteration
M01233462-I1
08/08/2024
Cycle 9 facade report signed — SWARMP
06/26/2024
Cycle 9 facade report submitted
06/12/2024
Cycle 9 facade inspection completed
05/09/2024
Signed off — Alteration
Renewal / Masonry Replacement / repointing / stucco / stone repairs / corner rebuild
M00979452-I1
01/26/2024
Permit issued — Structural
M00848692-I1-GC
01/04/2024
Permit issued — Suspended Scaffold
M00979452-I1-SC
12/19/2023
Filed — Alteration
Renewal / Masonry Replacement / repointing / stucco / stone repairs / corner rebuild
M00979452-I1
10/23/2023
Permit issued — General Construction
M00848692-I1-GC
07/03/2023
Filed — Alteration
M00889040-I1
07/03/2023
Filed — Alteration
M00889161-I1
05/04/2023
Filed — Alteration
FACADE AND STRUCTURAL REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00848692-I1
03/23/2023
Special inspection requirement — Structural Steel - Details
JONAR MADRIAGA
03/23/2023
Special inspection requirement — Masonry
JONAR MADRIAGA
03/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
03/23/2023
Special inspection requirement — Structural Steel - Welding
JONAR MADRIAGA
03/23/2023
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
03/23/2023
Special inspection requirement — Final
Ivan Zurkiwskyj
02/23/2023
Cycle 9 facade report signed — SWARMP
12/21/2022
Cycle 9 facade report submitted
11/22/2022
Cycle 9 facade inspection completed
04/05/2021
Signed off — Alteration
MH WORK AS PER PLANS. REPLACING EXISTING AIR HANDLER UNIT AND EXISTING OUTDOOR AIR CONDITIONING UNIT TO HEAT PUMP. NO CHANGE IN DUCT WORKS. MINIMUM WORK ON REFRIGERANT PIPING
M00430345-I1
02/12/2021
Permit issued — Mechanical Systems
M00430345-I1-MS
12/01/2020
Objection raised — Scope
12/01/2020
Objection resolved — Addressed
12/01/2020
Objection raised — Inspections
12/01/2020
Objection resolved — Addressed
11/30/2020
Filed — Alteration
MH WORK AS PER PLANS. REPLACING EXISTING AIR HANDLER UNIT AND EXISTING OUTDOOR AIR CONDITIONING UNIT TO HEAT PUMP. NO CHANGE IN DUCT WORKS. MINIMUM WORK ON REFRIGERANT PIPING
M00430345-I1
11/19/2020
Special inspection requirement — Final
Shahrish Shuvo
11/19/2020
Special inspection requirement — HVAC and service water heating equipment
Shahrish Shuvo
11/19/2020
Special inspection requirement — HVAC and service water heating system controls
Shahrish Shuvo
11/19/2020
Special inspection requirement — Maintenance information
Shahrish Shuvo
11/19/2020
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
11/19/2020
Special inspection requirement — HVAC insulation and sealing
Shahrish Shuvo
11/19/2020
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2018
Cycle 8 facade report signed — SAFE
02/21/2018
Cycle 8 facade report submitted
02/20/2018
Cycle 8 facade inspection completed
03/23/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/23/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/30/2015
Violation issued (ECB, closed)
Construction
12/29/2015
Violation issued (ECB, closed)
Construction
12/14/2015
Violation issued (ECB, closed)
Plumbing
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration08/14/2026
DOB NOWGeneral ConstructionPermit IssuedHobo Construction Co05/07/2026
DOB NOWSuspended ScaffoldPermit IssuedHobo Construction Co06/03/2025
DOB NOWStructuralPermit IssuedHobo Construction Co05/30/2025
DOB NOWStructuralPermit IssuedHobo Construction Co01/26/2024
DOB NOWSuspended ScaffoldPermit IssuedHobo Construction Co01/04/2024
DOB NOWGeneral ConstructionPermit IssuedHobo Construction Co10/23/2023
DOB NOWMechanical SystemsSigned-offA&J Safety Specialist02/12/2021
BISOTISSUEDRally Restoration05/04/2017
BISOTISSUEDRally Restoration11/29/2016
BISOTISSUEDRally Restoration10/07/2016
BISEQISSUEDEverest Scaffolding08/01/2016
BISEQISSUEDEverest Scaffolding08/01/2016
BISPLISSUEDBackflow Prevention of NY09/03/2014
BISOTISSUEDShalaby Construction03/03/2014
BISOTISSUEDDivya Construction of NYC09/17/2013
BISSPISSUEDBackflow Prevention of NY08/27/2013
BISOTISSUEDCardone Concrete04/04/2013
BISEQISSUEDRock Scaffolding10/25/2011
1 project · most recent 05/04/2023
FiledStatusContractorScope
05/04/2023Permit IssuedHobo Construction Co1 scope_items
1 project · most recent 07/09/2026
FiledStatusContractorScope
07/09/2026Permit IssuedSkyline Access—
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/21/2026Mechanical SystemsVincent Liottaspecial
09/21/2026HVAC-R and service water heating system controlsVincent Liottaenergy_progress
09/21/2026HVAC-R and service water heating equipmentVincent Liottaenergy_progress
09/21/2026HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
09/21/2026Maintenance informationVincent Liottaenergy_progress
09/21/2026FinalVincent Liottaprogress
03/23/2023Structural Steel - DetailsJONAR MADRIAGAspecial
03/23/2023MasonryJONAR MADRIAGAspecial
03/23/2023Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
03/23/2023Structural Steel - WeldingJONAR MADRIAGAspecial
03/23/2023Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
03/23/2023FinalIvan Zurkiwskyjprogress
11/19/2020FinalShahrish Shuvoprogress
11/19/2020HVAC and service water heating equipment Shahrish Shuvoenergy_progress
11/19/2020HVAC and service water heating system controls Shahrish Shuvoenergy_progress
11/19/2020Maintenance informationShahrish Shuvoenergy_progress
11/19/2020Mechanical SystemsShahrish Shuvospecial
11/19/2020HVAC insulation and sealing Shahrish Shuvoenergy_progress
11/19/2020Energy Code Compliance InspectionsShahrish Shuvoprogress
▾Documents — 165 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
10/08/2026M01462890-I1Request digital key ↗
08/31/2026M00848692-I1Request digital key ↗
08/30/2026M00889161-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00430345-I1Request digital key ↗
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION11
05/17/2017123086463Open ↗
12/15/2016122854241Open ↗
10/14/2016122854241Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
04/27/2017123086463Open ↗
08/11/2016122854241Open ↗
07/29/2016140528356Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications54
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
12/18/2018122854241Open ↗
11/29/2017123086463Open ↗
11/15/2017140528356Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
10/12/2026M01462890-I1Open ↗
10/12/2026M01462890-I1Open ↗
08/28/2026M00430345-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/12/2026M01462890-I1Open ↗
08/28/2026M00430345-I1Open ↗
08/22/2026M00848692-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
04/27/2017123086463Open ↗
08/11/2016122854241Open ↗
08/11/2016122854241Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
10/08/2026M01462890-I1Open ↗
08/31/2026M00848692-I1Open ↗
08/30/2026M00889040-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/27/2017123086463Open ↗
08/11/2016122854241Open ↗
08/21/2013121730797Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/29/2016140528356Open ↗
07/29/2016140528819Open ↗
09/16/2013140115060Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/29/2016140528356Open ↗
07/29/2016140528819Open ↗
09/16/2013140115060Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/21/2013121730797Open ↗
10/26/2011120870548Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
01/29/2014121664822Open ↗
08/21/2013121730797Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
10/15/2014121664822Open ↗
08/26/2014121730797Open ↗
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES4
07/29/2016140528356Open ↗
07/29/2016140528819Open ↗
04/27/2017123086463Open ↗
Showing 3 of 4 on file for this type
▸BISDS1-Demolition Submittal Certification Form1
02/12/2014121664822Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00430345-I1Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
04/27/2017123086463Open ↗
07/29/2016140528819Open ↗
09/16/2013140115060Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
10/08/2026M01462890-I1Open ↗
08/31/2026M00848692-I1Open ↗
08/30/2026M00889040-I1Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
08/21/2013121730797Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
12/18/2018122854241Open ↗
11/29/2017123086463Open ↗
04/27/2017123086463Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/18/2018122854241Open ↗
11/29/2017123086463Open ↗
10/21/2014121664822Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
03/10/2014121664822Open ↗
01/29/2014121664822Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/29/2016140528356Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/16/2013140115060Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00430345-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/29/2016140528356Open ↗
07/29/2016140528819Open ↗
09/16/2013140115060Open ↗
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER2
04/12/2013121565546Open ↗
04/10/2013121565546Open ↗
▸BISHYDRO FLOW TEST LETTER1
08/21/2013121730797Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
12/18/2018122854241Open ↗
11/29/2017123086463Open ↗
11/15/2017140528356Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
03/18/2013121565546Open ↗
10/26/2011120870548Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/15/2013121565546Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
12/18/2018122854241Open ↗
11/29/2017123086463Open ↗
04/27/2017123086463Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET6
04/27/2017123086463Open ↗
08/11/2016122854241Open ↗
01/29/2014121664822Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
12/18/2018122854241Open ↗
11/29/2017123086463Open ↗
11/15/2017140528356Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
04/25/2017140528819Open ↗
04/25/2017140528356Open ↗
05/21/2013121565546Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
07/29/2016140528356Open ↗
07/29/2016140528819Open ↗
09/16/2013140115060Open ↗
▸Other Documents5
▸DOB NOWManufacturer's Specifications2
08/13/2026M00979452-I1Open ↗
08/13/2026M01233462-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M00979452-I1Open ↗
08/13/2026M01233462-I1Open ↗
▸DOB NOWIRA Certification1
08/16/2026M01428723-I1Open ↗