← Back
Elevator apt, fireproof without stores
Hillside Homes
215 WEST KINGSBRIDGE RD · BIN 2129754
💬 Discuss this project
2022Year Built
6Stories
D3Building Class
R6Zoning
14,732 sfGross Floor Area
23Units
Rent Stabilized27 Open Violations ▸
Elevator apt, fireproof without stores · Owner of record: 229 WEST KINGSBRIDGE LLC · 5,350 sf lot · 2.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Floor 467p · 1 filing · 20 docs
Floor 369p · 1 filing · 20 docs
Floor 270p · 1 filing · 20 docs
Floor 166p · 1 filing · 20 docs
1 job · most recent 09/05/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/05/2024Signed-offDURGAJ PROPERTIES CORPHeating and Air Conditioning Systems
Heat / Cool
Friedrich PTAC-A 9,400 BTU ×50
Mitsubishi Electric MUZ-FS09NAH-U1 18,000 BTU · Condensing Unit ×4
1 job · most recent 09/05/2024
Sprinkler System
FiledStatusContractorScope
09/05/2024Signed-offLLOYD G DRUMMOND PLBG&GENSprinkler System
1 job · most recent 09/05/2024
Storm Water/Sanitary
FiledStatusContractorScope
09/05/2024Signed-offLLOYD G DRUMMOND PLBG&GENStorm, Water/Sanitary
3 jobs · most recent 06/10/2024
General Wiring
FiledStatusContractorScope
06/10/2024CompleteJ&H ELECTRICAL CONT INCGeneral Wiring
07/09/2023CompleteSOLAS ELECTRICAL CORP—
05/26/2023CompleteJAM ELECTRICAL CORP—
Building Lifecycle
All (212)Filed (22)Permit Issued (16)Signed Off (10)Violation (50)Inspection (10)Objection (74)Special Inspection (30)
08/14/2026
Violation issued (HPD, open)
C
06/03/2026
Violation issued (HPD, open)
B
06/03/2026
Violation issued (HPD, open)
B
06/03/2026
Violation issued (HPD, open)
B
06/03/2026
Violation issued (HPD, closed)
C
06/03/2026
Violation issued (HPD, open)
C
06/03/2026
Violation issued (HPD, open)
C
06/03/2026
Violation issued (HPD, open)
A
06/03/2026
Violation issued (HPD, open)
A
06/03/2026
Violation issued (HPD, open)
A
06/03/2026
Violation issued (HPD, open)
B
06/03/2026
Violation issued (HPD, open)
B
05/11/2026
Violation issued (HPD, closed)
A
05/04/2026
Violation issued (HPD, closed)
A
05/04/2026
Violation issued (HPD, open)
B
05/04/2026
Violation issued (HPD, closed)
A
05/04/2026
Violation issued (HPD, closed)
C
05/04/2026
Violation issued (HPD, closed)
B
05/04/2026
Violation issued (HPD, closed)
B
05/04/2026
Violation issued (HPD, closed)
B
05/04/2026
Violation issued (HPD, open)
A
05/04/2026
Violation issued (HPD, closed)
B
04/24/2026
Violation issued (HPD, open)
A
04/24/2026
Violation issued (HPD, closed)
C
04/24/2026
Violation issued (HPD, closed)
C
04/24/2026
Violation issued (HPD, closed)
C
04/24/2026
Violation issued (HPD, closed)
C
04/24/2026
Violation issued (HPD, open)
A
04/24/2026
Violation issued (HPD, open)
C
04/24/2026
Violation issued (HPD, open)
B
04/24/2026
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
C
10/08/2025
Violation issued (HPD, closed)
C
10/08/2025
Violation issued (HPD, closed)
A
10/08/2025
Violation issued (HPD, closed)
A
10/08/2025
Violation issued (HPD, closed)
A
10/08/2025
Violation issued (HPD, closed)
A
10/08/2025
Violation issued (HPD, open)
B
06/16/2025
Violation issued (HPD, closed)
A
04/25/2025
Violation issued (HPD, open)
C
04/25/2025
Violation issued (HPD, closed)
C
04/21/2025
Violation issued (HPD, open)
A
04/21/2025
Violation issued (HPD, open)
A
04/21/2025
Violation issued (HPD, open)
A
04/21/2025
Violation issued (HPD, open)
A
04/21/2025
Violation issued (HPD, open)
A
04/21/2025
Violation issued (HPD, open)
A
04/21/2025
Violation issued (HPD, open)
C
04/21/2025
Violation issued (HPD, closed)
A
10/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/13/2024
Special inspection requirement — Air barrier - visual inspection
Radomir Delic
09/13/2024
Special inspection requirement — Maintenance information
Radomir Delic
09/13/2024
Special inspection requirement — Fenestration areas
Radomir Delic
09/13/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Radomir Delic
09/13/2024
Special inspection requirement — Exterior lighting power
Radomir Delic
09/13/2024
Special inspection requirement — Lighting controls
Radomir Delic
09/13/2024
Special inspection requirement — Metering
Radomir Delic
09/13/2024
Special inspection requirement — Lighting in dwelling units
Radomir Delic
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
09/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
Latest 60 of 212 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DURGAJ PROPERTIES6107/08/2026
229 WEST KINGSBRIDGE503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/15/2020$774K—Private party → 229 WEST KINGSBRIDGE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS2009/05/2024
PAUL G. JONES, P.E.208/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING3603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DURGAJ PROPERTIES CORPGeneral Contractor2207/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor407/08/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
LLOYD G DRUMMOND PLBG&GENFire Protection107/08/2026
LLOYD G DRUMMOND PLBG&GENPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NODE ARCHITECTURE,ENGINEE67991209/05/2024
INTERNATIONAL GEOTEHCNICA1795511/02/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offDURGAJ PROPERTIES08/07/2024
DOB NOWMechanical SystemsSigned-offDURGAJ PROPERTIES07/02/2024
DOB NOWCurb CutSigned-offDURGAJ PROPERTIES06/07/2024
DOB NOWGeneral ConstructionPermit IssuedDURGAJ PROPERTIES08/08/2023
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN08/01/2023
DOB NOWSprinklersSigned-offLLOYD G. DRUMMOND08/01/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/10/2023
DOB NOWStructuralSigned-offDURGAJ PROPERTIES07/06/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING06/27/2023
DOB NOWGeneral ConstructionPermit IssuedDURGAJ PROPERTIES06/13/2023
DOB NOWFoundationSigned-offDURGAJ PROPERTIES05/22/2023
DOB NOWConstruction FenceSigned-offDURGAJ PROPERTIES05/22/2023
DOB NOWSupport of ExcavationSigned-offDURGAJ PROPERTIES05/22/2023
DOB NOWConstruction FenceSigned-offDURGAJ PROPERTIES06/04/2022
DOB NOWFoundationSigned-offDURGAJ PROPERTIES05/31/2022
DOB NOWSupport of ExcavationSigned-offDURGAJ PROPERTIES05/26/2022
BISOTISSUEDEXPERTISE PAINTING CORP05/29/2015
BISOTISSUEDEXPERTISE PAINTING CORP04/28/2014
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/01/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/11/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
04/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/17/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/11/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
09/13/2024Air barrier - visual inspectionRadomir Delicenergy_progress
09/13/2024Maintenance informationRadomir Delicenergy_progress
09/13/2024Fenestration areasRadomir Delicenergy_progress
09/13/2024Fenestration and door U-factor and product ratingsRadomir Delicenergy_progress
09/13/2024Exterior lighting powerRadomir Delicenergy_progress
09/13/2024Lighting controlsRadomir Delicenergy_progress
09/13/2024MeteringRadomir Delicenergy_progress
09/13/2024Lighting in dwelling unitsRadomir Delicenergy_progress
09/13/2024Fire-Resistant Penetrations and JointsRadomir Delicspecial
09/13/2024Fire-Resistance Rated ConstructionRadomir Delicprogress
09/13/2024Energy Code Compliance InspectionsRadomir Delicprogress
09/13/2024Interior lighting powerRadomir Delicenergy_progress
09/13/2024Fenestration air leakageRadomir Delicenergy_progress
09/13/2024Air barrier — testing Radomir Delicenergy_progress
09/13/2024Insulation placement and R valuesRadomir Delicenergy_progress
09/13/2024Electrical motors and elevatorsRadomir Delicenergy_progress
09/13/2024Protection of exposed foundation insulationRadomir Delicenergy_progress
12/04/2023Concrete - Cast-In-PlaceRadomir Delicspecial
12/04/2023FinalRadomir Delicprogress
12/04/2023Footing and FoundationRadomir Delicprogress
12/04/2023Subgrade InspectionsRadomir Delicspecial
11/14/2023MeteringRadomir Delicenergy_progress
11/14/2023Maintenance informationRadomir Delicenergy_progress
11/14/2023Lighting in dwelling unitsRadomir Delicenergy_progress
11/14/2023Electrical motors and elevatorsRadomir Delicenergy_progress
Latest 25 of 58.
▾Documents — 183 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/24/2026X00716933-I1Request digital key ↗
08/24/2026X00716933-P1Request digital key ↗
08/24/2026X00774253-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION7
08/16/2024220388694Open ↗
08/15/2024220388694Open ↗
08/15/2024220388694Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
02/29/2024240336784Open ↗
06/27/2023240336784Open ↗
▸BISWORK PERMIT APPLICATION2
05/29/2015220388694Open ↗
04/29/2014220388694Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
08/06/2024240336784Open ↗
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
06/27/2023240336784Open ↗
▸Zoning, Tax Lot & Property Records19
▸DOB NOWRestrictive Declaration/Easement 112
08/23/2026X00683341-S3Open ↗
08/23/2026X00683341-S6Open ↗
08/23/2026X00683341-S4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/23/2026X00683341-I1Open ↗
08/13/2026X00683341-P9Open ↗
08/13/2026X00683341-P7Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/23/2026X00683341-I1Open ↗
08/15/2026X00683341-P7Open ↗
08/13/2026X00683341-P9Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00683341-I1Open ↗
▸Seals & Professional Certifications85
▸DOB NOWProgress Inspector Seal & Signature39
09/01/2026X00683341-P7Open ↗
09/01/2026X00683341-P7Open ↗
09/01/2026X00683341-P7Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/24/2026X00774253-I1Open ↗
08/23/2026X00683341-S4Open ↗
08/23/2026X00683341-S3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026X00683341-P5Open ↗
09/23/2026X00683341-P5Open ↗
09/01/2026X00683341-P7Open ↗
Showing 3 of 19 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/26/2023240336784Open ↗
10/12/2022240336784Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/28/2014220388694Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/28/2014220388694Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/28/2014220388694Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/23/2026X00683341-I1Open ↗
08/15/2026X00683341-P7Open ↗
08/13/2026X00683341-P9Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/23/2026X00683341-I1Open ↗
08/15/2026X00683341-P7Open ↗
08/13/2026X00683341-P9Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/26/2023240336784Open ↗
▸BISSTREET TREE CHECKLIST1
06/27/2023240336784Open ↗
▸BISSTREET TREE SIGNOFF1
08/06/2024240336784Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00683341-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00683341-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00683341-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/28/2014220388694Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/28/2014220388694Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00683341-I1Open ↗
▸Inspections & Test Reports3
▸BISBPP: FIELD INSPECTION1
08/06/2024240336784Open ↗
▸BISBPP - Inspection Appointment Form1
08/06/2024240336784Open ↗
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
08/06/2024240336784Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/06/2024240336784Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
04/28/2014220388694Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
07/25/2024220388694Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
09/09/2020220728871Open ↗
04/28/2014220388694Open ↗
▸BISADDITIONAL INFORMATION1
02/29/2024240336784Open ↗
▸BISBOROUGH INTAKE FORM1
09/09/2020220728871Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/12/2022240336784Open ↗
▸Other Documents18
▸BISBPP - SUPPORTING DOCUMENTATION5
08/06/2024240336784Open ↗
08/06/2024240336784Open ↗
08/06/2024240336784Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/23/2026X00683341-I1Open ↗
08/15/2026X00683341-P7Open ↗
08/13/2026X00683341-P9Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026X00683341-I1Open ↗
08/15/2026X00683341-P7Open ↗
08/13/2026X00683341-P9Open ↗
▸DOB NOWSite Survey: Initial3
08/23/2026X00683341-I1Open ↗
08/15/2026X00683341-P7Open ↗
08/13/2026X00683341-P9Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00720715-I1Open ↗
08/13/2026X00720729-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00683341-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00683341-I1Open ↗