Elevator apt, fireproof without stores
215 WORTMAN AVENUE
BROOKLYN · BIN 3324015
💬 Discuss this project
1955Year Built
14Stories
D3Building Class
R5Zoning
940,800 sfGross Floor Area
756Units
LL97 CoveredRent Stabilized69 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: STANLEY AVENUE PRESERVATION LLC · 502,900 sf lot · 1.87 FAR built · Flood zone X500
Locations of Work
ArchitectureElectrical
Bulkhead3p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP607/08/2026
SAP CONSTRUCTION203/22/2026
NEELAM CONSTRUCTION103/22/2026
NYC HOUSING AUTHORITY1603/22/2026
NY CITY HOUSING AUTHORITY103/22/2026
NEW YORK CITY HOUSING AUTHORITY603/22/2026
NYCHA503/22/2026
ROBERT YAUCH (NYCHA)103/22/2026
TPG CONTRACTING103/22/2026
DESIGN DEPT NYCHA303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE603/21/2026
JM ZONING, LLC.3203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAP CONSTRUCTION LLCGeneral Contractor2607/08/2026
VICTORIAN FENCE INCGeneral Contractor707/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor507/08/2026
SALVATORE ESPOSITOElectrical403/21/2026
CAPONE ELECL CONTRS CORPElectrical303/22/2026
CAPONE ELECL CONTRS CORP 005036General Contractor303/22/2026
M & M PIPING AND HEATINGPlumbing207/08/2026
W & M ELECTRIC CORPElectrical103/22/2026
R.C.M. ELECTRIC CORP.Electrical103/22/2026
DILPREET SINGHElectrical103/21/2026
INNOVATION PLUMBING LLCPlumbing107/08/2026
4MATIC CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8431212/20/2024
RAND ENGINEERING & ARCHIT266205/23/2022
Building Lifecycle
All (182)Filed (20)Permit Issued (23)Signed Off (9)Facade (FISP) (13)Violation (60)Inspection (5)Objection (22)Special Inspection (30)
08/25/2026
Violation issued (ECB, open)
Elevators
06/18/2026
Violation issued (HPD, closed)
C
03/27/2026
Violation issued (ECB, closed)
Elevators
08/23/2025
Violation issued (HPD, closed)
C
06/22/2025
Violation issued (HPD, closed)
B
06/22/2025
Violation issued (HPD, closed)
C
06/22/2025
Violation issued (HPD, closed)
C
06/17/2025
Violation issued (HPD, closed)
C
06/17/2025
Violation issued (HPD, closed)
C
06/12/2025
Signed off — Alteration
EXTERIOR UPGRADES IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478220-S1
05/22/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/07/2025
Violation issued (HPD, closed)
A
05/07/2025
Violation issued (HPD, closed)
C
05/02/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/25/2025
Violation issued (ECB, closed)
Elevators
04/18/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/29/2025
Violation issued (HPD, closed)
C
03/29/2025
Violation issued (HPD, closed)
C
02/26/2025
Violation issued (HPD, closed)
A
02/26/2025
Violation issued (HPD, closed)
C
02/26/2025
Violation issued (HPD, closed)
C
02/26/2025
Violation issued (HPD, closed)
A
02/16/2025
Violation issued (HPD, closed)
A
02/07/2025
Signed off — Alteration
EXTERIOR UPGRADES IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478220-S7
02/03/2025
Violation issued (HPD, closed)
A
02/03/2025
Violation issued (HPD, closed)
B
01/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2025
Signed off — Alteration
EXTERIOR UPGRADES IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478220-S3
01/10/2025
Signed off — Alteration
EXTERIOR UPGRADES IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478220-I1
01/03/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
01/03/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
01/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
01/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
01/03/2025
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
01/03/2025
Special inspection requirement — Final
JOHN MCMONAGLE
12/31/2024
Objection resolved — Addressed
12/30/2024
Objection raised — Other
12/20/2024
Filed — Alteration
EXTERIOR UPGRADES IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478220-P8
12/17/2024
Filed — Alteration
EXTERIOR UPGRADES IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478220-P9
12/16/2024
Violation issued (HPD, closed)
C
11/27/2024
Permit issued — General Construction
B00478220-I1-GC
11/27/2024
Violation issued (HPD, closed)
C
11/26/2024
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Vestibules
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Final
Mark Ginsberg
11/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
11/20/2024
Filed — Alteration
EXTERIOR UPGRADES IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478220-P7
11/16/2024
Violation issued (HPD, closed)
A
11/16/2024
Violation issued (HPD, closed)
C
11/16/2024
Violation issued (HPD, closed)
A
11/16/2024
Violation issued (HPD, closed)
A
11/16/2024
Violation issued (HPD, closed)
A
11/16/2024
Violation issued (HPD, closed)
A
11/16/2024
Violation issued (HPD, closed)
C
Latest 60 of 182 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSAP CONSTRUCTION LLC11/27/2024
DOB NOWGeneral ConstructionSigned-offSAP CONSTRUCTION LLC11/13/2024
DOB NOWMechanical SystemsSigned-offSAP CONSTRUCTION LLC11/13/2024
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING09/10/2024
DOB NOWStructuralSigned-offSAP CONSTRUCTION LLC02/01/2024
DOB NOWGeneral ConstructionSigned-offSAP CONSTRUCTION LLC12/27/2023
DOB NOWMechanical SystemsSigned-offSAP CONSTRUCTION LLC12/27/2023
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/13/2023
DOB NOWConstruction FenceSigned-offVICTORIAN FENCE INC05/12/2023
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP03/23/2023
DOB NOWGeneral ConstructionSigned-offSAP CONSTRUCTION LLC01/19/2023
DOB NOWMechanical SystemsSigned-offSAP CONSTRUCTION LLC01/19/2023
DOB NOWGeneral ConstructionSigned-offSAP CONSTRUCTION LLC01/19/2023
DOB NOWGeneral ConstructionSigned-offSAP CONSTRUCTION LLC01/19/2023
DOB NOWMechanical SystemsSigned-offSAP CONSTRUCTION LLC11/14/2022
DOB NOWSupported ScaffoldSigned-off4MATIC CONSTRUCTION CORP08/23/2022
DOB NOWGeneral ConstructionSigned-offSAP CONSTRUCTION LLC08/10/2022
DOB NOWPlumbingSigned-offINNOVATION PLUMBING LLC08/10/2022
DOB NOWGeneral ConstructionSigned-offSAP CONSTRUCTION LLC07/11/2022
DOB NOWConstruction FenceSigned-offVICTORIAN FENCE INC06/06/2022
DOB NOWGeneral ConstructionSigned-offSAP CONSTRUCTION LLC05/27/2022
DOB NOWConstruction FenceSigned-offVICTORIAN FENCE INC04/06/2022
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP03/31/2022
BISOTISSUEDROMA SCAFFOLDING INC04/20/2015
BISEQISSUEDROMA SCAFFOLDING INC02/27/2015
BISEQISSUEDROMA SCAFFOLDING INC02/25/2015
BISEQISSUEDNAVICO B & S CONSTRUCTION07/28/2014
BISEQISSUEDNAVICO B & S CONSTRUCTION07/17/2013
BISEQISSUEDNAVICO B & S CONSTRUCTION06/12/2013
BISOTISSUEDASHNU INTERNATIONAL INC05/04/2011
BISEQISSUEDTALICO CONSTRUCTION CORP03/11/2011
BISPLISSUEDPERFORMANCE PLUMBING01/17/2007
BISEQISSUEDZORIA HOUSING, LLC09/08/2006
BISPLISSUEDDANCO, INC08/24/2006
BISPLISSUEDDELPHI PLBG. & HTG., INC03/27/2006
BISPLISSUEDDELPHI PLBG. & HTG., INC04/05/2005
BISEQISSUEDMBR CONTRACTING INC09/16/2003
BISOTISSUEDARR0W STEEL WINDOW COEP07/07/1999
BISPLISSUEDV. C. VITANZA SONS INC02/09/1999
BISOTISSUEDV.C.VITANZA SONS INC02/09/1999
+ 3 more permits on file
1 project · most recent 12/20/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/20/2024Signed-offSAP CONSTRUCTION LLCVentilation Systems
Ventilation
Ruskin EV450RT 280 CFM · Erv ×4
1 project · most recent 12/20/2024
Gas Water/Sanitary
FiledStatusContractorScope
12/20/2024Signed-offM & M PIPING AND HEATINGGas, Water/Sanitary
11 projects · most recent 11/25/2025
General Wiring
FiledStatusContractorScope
11/25/2025CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
11/25/2025CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
11/25/2025CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
03/02/2025CompleteSUNKEEPER SOLAR LLC2 meters, 1 new_meters
12/12/2024CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
08/28/2024CompleteR.C.M. ELECTRIC CORP.—
10/02/2023CompleteCAPONE ELECL CONTRS CORP—
04/25/2023CompleteW & M ELECTRIC CORP—
10/31/2022CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
07/15/2022CompleteGPN ELECTRIC CORP—
03/10/2022CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 12/20/2024
Steel
FiledStatusContractorScope
12/20/2024Signed-offSAP CONSTRUCTION LLCSteel
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/22/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/02/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/18/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
01/03/2025Mechanical SystemsJOHN MCMONAGLEspecial
01/03/2025Maintenance informationJOHN MCMONAGLEenergy_progress
01/03/2025HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
01/03/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
01/03/2025FinalJOHN MCMONAGLEprogress
01/03/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/26/2024Lighting controlsJOHN MCMONAGLEenergy_progress
11/26/2024Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
11/26/2024Interior lighting powerJOHN MCMONAGLEenergy_progress
11/26/2024Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
11/26/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/26/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
11/26/2024FinalMark Ginsbergprogress
11/26/2024Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
11/26/2024Exterior lighting powerJOHN MCMONAGLEenergy_progress
11/26/2024VestibulesJOHN MCMONAGLEenergy_progress
11/05/2024Mechanical SystemsJOHN MCMONAGLEspecial
11/05/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
11/05/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/05/2024HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
11/05/2024Maintenance informationJOHN MCMONAGLEenergy_progress
11/05/2024FinalJOHN MCMONAGLEprogress
11/01/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
11/01/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/30/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
Latest 25 of 68.
▾Documents — 188 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/01/2026B00478220-P6Request digital key ↗
09/01/2026B00478220-P5Request digital key ↗
09/01/2026B00478220-P3Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
04/20/2015340242240Open ↗
02/26/2015340234044Open ↗
02/24/2015340233429Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
02/20/2025300714831Open ↗
03/29/2015340242240Open ↗
02/26/2015340234044Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications77
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026B00478220-P7Open ↗
09/19/2026B00478220-S3Open ↗
09/03/2026B00478220-S6Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/01/2026B00478220-S2Open ↗
09/01/2026B00478220-P6Open ↗
09/01/2026B00478220-P5Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
02/25/2016340242240Open ↗
02/25/2016340242240Open ↗
01/11/2016340233429Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026B00478220-P7Open ↗
09/03/2026B00478220-S6Open ↗
09/01/2026B00478220-S3Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
03/29/2015340242240Open ↗
02/26/2015340234044Open ↗
02/24/2015340233429Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
03/29/2015340242240Open ↗
02/26/2015340234044Open ↗
02/24/2015340233429Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
03/29/2015340242240Open ↗
02/26/2015340234044Open ↗
02/24/2015340233429Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/14/2011320279827Open ↗
03/18/2010320137062Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/14/2011320279827Open ↗
03/18/2010320137062Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/01/2026B00478220-S6Open ↗
09/01/2026B00478220-S4Open ↗
09/01/2026B00478220-S3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)3
05/10/2011320137062Open ↗
05/10/2011320137062Open ↗
04/20/2015340242240Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/14/2011320279827Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/25/2016340242240Open ↗
▸Energy Compliance10
▸DOB NOWEN2: As Built Energy Analysis.4
09/01/2026B00478220-S4Open ↗
09/01/2026B00478220-S3Open ↗
09/01/2026B00478220-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/25/2016340242240Open ↗
02/25/2016340242240Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/29/2015340242240Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/26/2015340234044Open ↗
▸BISNYCECC ANALYSIS1
03/29/2015340242240Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/25/2016340242240Open ↗
▸Inspections & Test Reports3
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
03/29/2015340242240Open ↗
02/26/2015340234044Open ↗
02/24/2015340233429Open ↗
▸Approvals, Objections & Sign-offs39
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
09/01/2026B00478220-P6Open ↗
09/01/2026B00478220-P5Open ↗
09/01/2026B00478220-P3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDEP Variance (V5) letter7
09/01/2026B00478220-S6Open ↗
09/01/2026B00478220-S4Open ↗
09/01/2026B00478220-S3Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
02/25/2016340242240Open ↗
01/11/2016340233429Open ↗
01/11/2016340234044Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/25/2016340242240Open ↗
01/11/2016340233429Open ↗
01/11/2016340234044Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
03/14/2011320279827Open ↗
03/18/2010320137062Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
02/25/2016340242240Open ↗
02/25/2016340242240Open ↗
03/18/2010320137062Open ↗
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET4
03/29/2015340242240Open ↗
02/26/2015340234044Open ↗
02/24/2015340233429Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
03/14/2011320279827Open ↗
03/18/2010320137062Open ↗
▸Other Documents3
▸BISFEE EXEMPTION DOCUMENTATION1
05/23/2013340064879Open ↗
▸BISOP-4 - Special Report1
06/04/2015340064879Open ↗
▸DOB NOWWaiver Document1
09/01/2026B00478220-S4Open ↗