DOB07/17/2006WORK W/O PERMIT(HAZARDOUS)TWO STORY FRAME EXT.APPX.20'X30LX2'H WITH NEW MASONARY PORCH APPX 25'LX20' AND MASONARY SHED 10FT WIDE BUILT AT REAR OF YARD WITHOUR A PERMIT.EXTENSION IS STUCCO SURFACED WITH 6/12 GABLED ROOF REMEDY:OBTAIN PERMIT /ARCHITECTUAL PLANS
DOB08/05/2005V-DOB VIOLATION - ACTIVE
DOB02/12/2004V-DOB VIOLATION - ACTIVE
ECB04/17/2010FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION. FOR ECB VIO # 34532273Y, ISSUED 7/17/06 FOR ILLEGAL WORK @ CELLEVEL. REM: COMPLY W/COMMISSIONER'S ORDER TO OBTAIN PERMIT; FILE CERTINothing owed — awaiting certificate of correction
ECB10/18/2008SEC 28-201.1 FAILURE TO COMPLY W/ COMMS ORDER TO CORRECT VIO#34532273YFOR WORK W/O PERMIT @ CELLAR NO RECORD OF CORRECTION REMEDY: COMPLY W/ COMMS ORDER & OBTAIN PERMITNothing owed — awaiting certificate of correction
ECB04/09/2008FAILURE TO COMPLY W/COMM'S ORDER TO CORRECT VIO #34532273Y FOR WORK W/O PERMIT AT CELLAR NO RECORD OF CORRECTION. REMEDY: COMPLY W/COMM'S ORDER & OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB11/20/2007FAILURE TO COMPLY W/COMMISSIONERS ORDER TO CORRECT NOV #34532273Y FOR WORK DONE W/O PERMITS.NO ACCESS TO PREMISES,NO CERT OF CORRECTION OR PERMITS FILED.COMPLIED W/THIS & PREVIOUS ORDERS FORTHWITH.Nothing owed — awaiting certificate of correction
ECB07/07/2007FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO CERTIFY CORRECTIONS.NOTED:NO COMPLIANCE TO PRIOR ECB#34532273Y FOR WORK W/O A PERMIT WHICH IS NOW IN DEFAULT.REMEDY:COMPLY W/COMMISSIONER'S ORDER TO CERTIFY CORRECTIONothing owed — awaiting certificate of correction
ECB03/22/2007FAILURE TO COMPLY W/ COMMISSIONER'S ORDERS TO OBTAIN A PERMIT TO CORRECT ECB #34532273Y FOR WORK W/O A PERMIT FOR EXTENSION & MASONRY SHED. @ TIME OF INSPECTION NO PERMIT ISSUED. REMEDY: COMPLY W/ COMMISSIONERNothing owed — awaiting certificate of correction
ECB11/22/2006FAILURE TO COMPLY W/ COMMISSIONER'S ORDER TO OBTAIN A PERMIT TO CORRECT ECB#34532273Y FOR WORK W/O A PERMIT FOR WORK W/O A PERMIT FOR EXTENSION & MASONRY SHED.AT TIME OF INSPECTION NO PERMIT ISSUED.Nothing owed — awaiting certificate of correction
ECB07/17/2006WK W/O PERMIT. HAZARD. 2STORY FRAME EXTENSION APPROX 20'W X30'L X2'H W/MASON PORCH APPROX 25'L X 20'W & MASON SHED 10'W X 12' X10'H BUILT @ REAR YARD W/O PERMIT. EXTENSION IS STUCCO SURFACE W 6/12 GABLE ROOF.Nothing owed — awaiting certificate of correction
ECB06/13/2006WORK W/O A PERMIT. (40% OF WORK COMPLETED) NOTED:CONSTRUCTION OF REAR DECK & ATTACHED STRUCTURE EXTENDING FROM REAR OF BLDG DECK IS 24FT X 20FT (APPROX) BRICK,STEEL BEAMS & CORRUGATED DECKING OBESERVEDNothing owed — awaiting certificate of correction
ECB06/13/2006FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME OF INSP.NOTED:FRONT & REAR VERTICAL EXTENSIONS CONSTRUCTED RECENTLY WERE TO BE LEGALIZED UNDER NON EXPIRED PERMIT 301632222. EXTENSIONS REMAIN & NO PLANSNothing owed — awaiting certificate of correction
ECB06/13/2006FAILURE TO MAINTAIN BLDG NOTED:DOWN SPOUT AT FRONT OF PREMISES TERMINATES ON BRICK PAVED SIDE YARD, SLOPED TOWARD SIDEWALK & STREET.REMEDY:INSTALL DRAINAGE SYSTEM SAFELY & PROPERLY AS REQUIREDNothing owed — awaiting certificate of correction
ECB08/04/2005WORK W/OUT PERMIT.EXPIRED PERMIT.UPON INSP AT ABOVE PROPERTY ALT WAS IN PROGRESS AND ALT PERMIT #301632222 WAS EXPIRED ON 5.21.05 AND DOB RECORDS SHOWS NO PERMIT HAS BEEN RENEWED.STOP ALL WORK! REMEDY:RENEW ALTNothing owed — awaiting certificate of correction
ECB08/04/2005WORK W/OUT PERMIT.UPON INSPP AT ABOVE PROPERTY NOTED:ALT WORK IN PROGRESS AND THERE ARE INSTALLED NEW PLUMBING FIXTURES IN BASEMENT NEW HOT AND COLD WATER PIPING AND DOB RECORDS SHOWS NO PLUMBING PERMIT HAS BEENothing owed — awaiting certificate of correction
ECB07/15/2005WORK WITHOUT A PERMIT.NOPTED:AT FRONT INSTALLED A CURB CUT APPROX 10'FT WIDE.REMEDY:OBTAIN PERMIT IF FEASIBLE OR RESTOERE TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
ECB09/09/2004FAILURE TO PROVIDE PLAN AT PREMISE AT TIME OF INSP: NOTED REAR EXTENTION 2 STORY APPROX 12 FT LONG X 18 FT WIDE STOP ALL WORK MAKE AREA SAFE REMEDY: STOP ALL WORK CALL DOB @ 718.802.3685 BEFORE RETURNING TO WORNothing owed — awaiting certificate of correction
ECB02/17/2004FAILURE TO PROVIDE APPROVED PLANS AT PREMISE AT TIME OF INSPECTION. NOTED: WORK IN PROGRESS AT 1ST AND 2ND FLOORS, INSTALLATION OF WOOD FLOOR AT 2ND STORY HALLWAYS AND WORKER AT 1ST FLOOR ONE MALE AND ONE FEMALNothing owed — awaiting certificate of correction