← Back
Two family brick
2152 HAVILAND AVENUE
BRONX · Castle Hill-Unionport · BIN 2026428
💬 Discuss this project
1965Year Built
2Stories
B1Building Class
R5Zoning
2,000 sfGross Floor Area
2Units
7 Open Violations ▸FDNY Report ↗
Two family brick · 2,704 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR107/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281107/06/2026
Building Lifecycle
All (15)Filed (1)Violation (7)Special Inspection (7)
07/06/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 7 modules, 2.87 KW
X01426484-I1
07/06/2026
Special inspection requirement — Adhesive-Based Solar Pedestal Bonding Systems
Mina Makar
07/06/2026
Special inspection requirement — Post-installed Anchors
Mina Makar
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
07/06/2026
Special inspection requirement — Final
Mina Makar
07/06/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
06/14/2026
Violation issued (HPD, open)
B
06/14/2026
Violation issued (HPD, open)
B
06/14/2026
Violation issued (HPD, open)
B
06/14/2026
Violation issued (HPD, open)
B
06/14/2026
Violation issued (HPD, open)
B
06/14/2026
Violation issued (HPD, open)
B
06/14/2026
Violation issued (HPD, open)
B
Nothing on file for this building.
1 project · most recent 07/06/2026
FiledStatusContractorScope
07/06/2026Permit IssuedISLAND ELECTRIC CORP—
1 project · most recent 07/06/2026
FiledStatusContractorScope
07/06/2026——7 panels, 2.87 kw, 2,704 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/06/2026Adhesive-Based Solar Pedestal Bonding SystemsMina Makarspecial
07/06/2026Post-installed AnchorsMina Makarspecial
07/06/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
07/06/2026Fire-Resistant Penetrations and JointsMina Makarspecial
07/06/2026Energy Code Compliance InspectionsMina Makarprogress
07/06/2026FinalMina Makarprogress
07/06/2026Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026X01426484-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026X01426484-I1Open ↗
08/27/2026X01426484-I1Open ↗
08/27/2026X01426484-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026X01426484-I1Open ↗
08/27/2026X01426484-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026X01426484-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026X01426484-I1Open ↗