← Back
Walk-up cooperative
2153 PACIFIC STREET
BROOKLYN · BIN 3038582
💬 Discuss this project
1910Year Built
4Stories
C6Building Class
R6Zoning
20,700 sfGross Floor Area
24Units
Rent Stabilized32 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 2149-53 PACIFIC ST HDFC · 7,350 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
Architecture
Roof4p · 1 filing · 3 docs
Bulkhead2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UPTOWN CONSTRUCTION SERVICE GROUP I109/18/2026
BLUFIN MANAGEMENT608/26/2026
2149-53 PACIFIC ST HDFC203/22/2026
2149- 53 PAIFIC HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEORGE J. XERAKIAS, PE107/15/2026
IVAN BRICE ARCHITECTURE106/10/2026
RONALD KRIGSMAN P.E.P.C.212/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A. HTG AND PLBG WORKS INCPlumbing207/08/2026
UPTOWN CONSTRUCTION SERVGeneral Contractor109/18/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RONALD KRIGSMAN P.E.P.C.1583212/05/2025
Building Lifecycle
All (98)Filed (4)Permit Issued (4)Signed Off (2)Violation (60)Inspection (2)Objection (20)Special Inspection (6)
09/17/2026
Permit issued — Sidewalk Shed
B01454598-I1-SH
07/31/2026
Objection resolved — Addressed
07/31/2026
Objection resolved — Resolved
07/31/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Addressed
07/17/2026
Permit issued — Suspended Scaffold
B01428506-I1-SC
07/15/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT (MATERIAL HOIST - COUNTERWEIGHTED SYSTEM). NO CHANGES IN THE EGRESS.
B01428506-I1
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/10/2026
Filed — Alteration
Full roof replacement and brick replacement. No change to use, egress, or occupancy.
B01360378-I1
06/02/2026
Signed off — Alteration
BOILER AND BURNER REPLACEMENT .
B01328019-I1
05/15/2026
Signed off — Alteration
GAS TO GAS REPLACEMENT . RECONNECT EXISTING GAS LINE TO REPLACEMENT BURNER AND REPLACE GAS TRAIN .
B01328512-I1
05/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/12/2025
Permit issued — Plumbing
B01328512-I1-PL
12/12/2025
Permit issued — Boiler Equipment
B01328019-I1-BE
12/05/2025
Filed — Alteration
BOILER AND BURNER REPLACEMENT .
B01328019-I1
12/05/2025
Filed — Alteration
GAS TO GAS REPLACEMENT . RECONNECT EXISTING GAS LINE TO REPLACEMENT BURNER AND REPLACE GAS TRAIN .
B01328512-I1
12/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
HOWARD KRIGSMAN
12/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
HOWARD KRIGSMAN
12/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
HOWARD KRIGSMAN
12/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
HOWARD KRIGSMAN
12/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
HOWARD KRIGSMAN
12/03/2025
Special inspection requirement — Maintenance information
HOWARD KRIGSMAN
11/20/2025
Violation issued (HPD, closed)
I
05/15/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, closed)
I
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/29/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
01/03/2022
Violation issued (ECB, closed)
Boilers
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/16/2021
Violation issued (HPD, closed)
A
09/15/2020
Violation issued (HPD, closed)
B
09/15/2020
Violation issued (HPD, closed)
B
09/15/2020
Violation issued (HPD, closed)
B
11/04/2019
Violation issued (HPD, closed)
I
12/17/2018
Violation issued (HPD, closed)
C
12/17/2018
Violation issued (HPD, closed)
B
12/17/2018
Violation issued (HPD, closed)
A
12/17/2018
Violation issued (HPD, closed)
B
08/13/2018
Violation issued (HPD, closed)
B
02/09/2018
Violation issued (HPD, closed)
B
02/01/2018
Violation issued (HPD, closed)
C
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedUPTOWN CONSTRUCTION SERV09/17/2026
DOB NOWSuspended ScaffoldPermit IssuedKNS BLDG RESTORATION INC07/17/2026
DOB NOWPlumbingSigned-offD.H. EAGLE PLUMBING, LLC12/12/2025
DOB NOWBoiler EquipmentSigned-offD.H. EAGLE PLUMBING, LLC12/12/2025
BISOTISSUEDNOVALEX CONTRACTING CORP10/02/2002
1 project · most recent 12/05/2025
Gas
FiledStatusContractorScope
12/05/2025Signed-offA. HTG AND PLBG WORKS INCGas
1 project · most recent 09/16/2026
FiledStatusContractorScope
09/16/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
1 project · most recent 07/15/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/15/2026Permit IssuedKNS BLDG RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/30/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/03/2025Tenant Protection Plan ComplianceHOWARD KRIGSMANspecial
12/03/2025Tenant Protection Plan ComplianceHOWARD KRIGSMANspecial
12/03/2025HVAC-R and service water heating system controlsHOWARD KRIGSMANenergy_progress
12/03/2025HVAC-R and service water heating equipmentHOWARD KRIGSMANenergy_progress
12/03/2025HVAC-R and service water piping design and insulationHOWARD KRIGSMANenergy_progress
12/03/2025Maintenance informationHOWARD KRIGSMANenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/19/2026B01328019-I1Request digital key ↗
08/19/2026B01328512-I1Request digital key ↗
08/16/2026B01360378-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026B01360378-S1Open ↗
08/16/2026B01360378-I1Open ↗
08/16/2026B01428506-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B01328019-I1Open ↗
09/23/2026B01328019-I1Open ↗
09/23/2026B01328019-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/30/2026B01328512-I1Open ↗
09/23/2026B01328019-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01328019-I1Open ↗
08/13/2026B01328512-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/19/2026B01328019-I1Open ↗
▸Other Documents3
▸DOB NOWCalculations1
08/16/2026B01428506-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B01360378-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026B01428506-I1Open ↗