← Back
Two family frame
2155 73 STREET
BROOKLYN · BIN 3158703
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R5Zoning
2,480 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneralOther
Floor 23p · 2 filings · 16 docs
Floor 12p · 2 filings · 16 docs
Cellar3p · 2 filings · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/08/2024$1.7M—— → —$698/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI609/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394309/09/2024
Building Lifecycle
All (19)Filed (6)Permit Issued (2)Signed Off (2)Inspection (3)Special Inspection (6)
10/17/2024
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01006804-I1
09/26/2024
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01006802-I1
09/20/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/11/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
09/09/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01006802-P2
09/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/09/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/10/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/03/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01006804-P2
04/24/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01006802-P1
04/24/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01006804-P1
03/08/2024
Permit issued — Plumbing
B01006804-I1-PL
03/01/2024
Permit issued — General Construction
B01006802-I1-GC
02/23/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01006804-I1
02/23/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01006802-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG03/08/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC03/01/2024
1 project · most recent 02/20/2024
General Wiring
FiledStatusContractorScope
02/20/2024CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/20/2024Pass-Final General Construction Non-Directive 14PassView ↗
07/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/11/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/11/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/11/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
09/09/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/09/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/09/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B01006802-I1Request digital key ↗
08/25/2026B01006802-P2Request digital key ↗
08/25/2026B01006802-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B01006802-I1Open ↗
08/25/2026B01006802-P1Open ↗
08/25/2026B01006804-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026B01006802-I1Open ↗
08/30/2026B01006802-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026B01006802-I1Open ↗
08/30/2026B01006802-P2Open ↗