Three families
215A PROSPECT AVENUE
BROOKLYN · BIN 3024153
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,169 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,594 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 21p · 1 filing · 18 docs
Floor 11p · 1 filing · 18 docs
Cellar1p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SDC203/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JC HI TECH INCGeneral Contractor107/08/2026
PRIME PIPING & HEATING INPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252203/18/2022
Building Lifecycle
All (24)Filed (2)Permit Issued (1)Signed Off (1)Violation (7)Objection (2)Special Inspection (11)
04/11/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/24/2023
Violation issued (HPD, closed)
A
02/09/2023
Signed off — Alteration
Amending the application to remove the Final Inspection as this application is not a Directive 14 Application and has to be Inspected by the Department Construction Unit
B00344578-I1
03/29/2022
Special inspection requirement — HVAC insulation and sealing
INDARDEO PARBHUNATH
03/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
03/29/2022
Special inspection requirement — Final
NAVEEN KUMAR
03/29/2022
Special inspection requirement — HVAC and service water heating system controls
INDARDEO PARBHUNATH
03/29/2022
Special inspection requirement — HVAC and service water heating equipment
INDARDEO PARBHUNATH
03/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
03/29/2022
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
03/24/2022
Objection resolved — Addressed
03/22/2022
Objection raised — Scope
03/18/2022
Filed — Alteration
Amending the application to remove the Final Inspection as this application is not a Directive 14 Application and has to be Inspected by the Department Construction Unit
B00344578-P1
03/01/2022
Violation issued (HPD, closed)
A
11/30/2021
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
11/30/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
11/30/2021
Special inspection requirement — Final
11/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
10/28/2021
Permit issued — Mechanical Systems
B00344578-I1-MS
04/12/2021
Violation issued (HPD, closed)
A
10/28/2020
Filed — Alteration
Amending the application to remove the Final Inspection as this application is not a Directive 14 Application and has to be Inspected by the Department Construction Unit
B00344578-I1
05/30/2018
Violation issued (ECB, closed)
Construction
02/24/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJC HI TECH INC10/28/2021
BISOTISSUEDKA HOME IMPROVEMENT NY IN07/17/2018
BISOTISSUEDJABUS BUILDING CORP05/22/2014
BISOTISSUEDAJV MANAGING & CONSTRUCT*06/27/2013
BISPLISSUEDCOLBREN PLBG & HTG INC03/29/1999
BISOTISSUEDOWNER03/09/1999
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
03/29/2022HVAC insulation and sealing INDARDEO PARBHUNATHenergy_progress
03/29/2022Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
03/29/2022FinalNAVEEN KUMARprogress
03/29/2022HVAC and service water heating system controls INDARDEO PARBHUNATHenergy_progress
03/29/2022HVAC and service water heating equipment INDARDEO PARBHUNATHenergy_progress
03/29/2022Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
03/29/2022Mechanical SystemsINDARDEO PARBHUNATHspecial
11/30/2021Mechanical SystemsINDARDEO PARBHUNATHspecial
11/30/2021Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
11/30/2021Final—progress
11/30/2021Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00344578-I1Request digital key ↗
08/15/2026B00344578-P1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
09/30/2019322010612Open ↗
01/17/2019300832231Open ↗
10/17/2018300832231Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
01/17/2019300832231Open ↗
11/26/2018300832231Open ↗
▸Seals & Professional Certifications20
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026B00344578-P1Open ↗
08/27/2026B00344578-P1Open ↗
08/27/2026B00344578-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026B00344578-P1Open ↗
08/27/2026B00344578-I1Open ↗
08/27/2026B00344578-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/30/2019322010612Open ↗
12/20/2018300832231Open ↗
07/25/2018300832231Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/08/2019322010612Open ↗
09/30/2019322010612Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00344578-P1Open ↗
08/13/2026B00344578-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/30/2019322010612Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
07/10/2014321201061Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/08/2019322010612Open ↗
07/10/2014321201061Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00344578-I1Open ↗
08/13/2026B00344578-P1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/08/2019322010612Open ↗
07/10/2014321201061Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00344578-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/17/2019300832231Open ↗
01/09/2019300832231Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
10/08/2019322010612Open ↗
▸BISSUPERSEDING LETTER1
07/18/2018300832231Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/10/2014321201061Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/10/2014321201061Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM3
01/24/2019300832231Open ↗
01/09/2019300832231Open ↗
10/17/2018300832231Open ↗
▸BISEFILING COVER SHEET2
09/14/2019322010612Open ↗
07/10/2014321201061Open ↗