← Back
Banking facility, with or without parking
216-19 JAMAICA AVENUE
QUEENS · Queens Village · BIN 4226366
💬 Discuss this project
1941Year Built
1Stories
K7Building Class
C4-2Zoning
7,640 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Banking facility, with or without parking · Owner of record: NORTH FORK BANK · 4,120 sf lot · 1.85 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Roof6p · 2 filings · 12 docs
Floor 118p · 1 filing · 9 docs
Basement1p · 1 filing · 3 docs
Site & exterior1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAPITAL ONE BANK503/22/2026
CAPITAL ONE N A307/08/2026
CAPITAL ONE, N.A.203/22/2026
NORTH FORK BANK203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEWTEC ENGINEERING112/18/2023
STONEFIELD ENGINEERING & DESIGN111/06/2023
TPG ARCHITECTURE, LLP111/01/2023
VINCENT J. LIOTTA P.E.106/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREGOR INDUSTRIES INCGeneral Contractor407/08/2026
PERRY MECHANICAL CONTRACTGeneral Contractor303/21/2026
INTEGRATED HVAC SYS & SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OBAID MIAN849112/18/2023
OUTSOURCE SPECIAL INSPECT2827211/06/2023
VINCENT J. LIOTTA P. E.1974106/27/2022
Building Lifecycle
All (30)Filed (4)Permit Issued (4)Signed Off (3)Violation (7)Special Inspection (12)
03/13/2024
Signed off — Alteration
BANK RENOVATION WORK TO INCLUDE INTERIOR DEMO & FIT OUT ON NON-LOAD BEARING PARTITIONS,CEILINGS,DOORS MODIFICATION & RELATED CONSTRUCTION AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00936967-I1
03/07/2024
Signed off — Alteration
Modification of existing entrance ramp and landings at accessible entrance as per plans filed herewith. No change in use, egress or occupancy.
Q00949379-I1
12/18/2023
Filed — Alteration
Replacement of existing air conditioning units. No change in use egress and occupancy.
Q00973258-I1
12/18/2023
Permit issued — Mechanical Systems
Q00973258-I1-MS
12/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
Obaid Mian
12/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Obaid Mian
12/13/2023
Special inspection requirement — Maintenance information
Obaid Mian
12/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
Obaid Mian
12/07/2023
Special inspection requirement — Final
Obaid Mian
12/07/2023
Special inspection requirement — Mechanical Systems
Obaid Mian
11/20/2023
Permit issued — General Construction
Q00949379-I1-GC
11/08/2023
Permit issued — General Construction
Q00936967-I1-GC
11/06/2023
Filed — Alteration
Modification of existing entrance ramp and landings at accessible entrance as per plans filed herewith. No change in use, egress or occupancy.
Q00949379-I1
11/01/2023
Filed — Alteration
BANK RENOVATION WORK TO INCLUDE INTERIOR DEMO & FIT OUT ON NON-LOAD BEARING PARTITIONS,CEILINGS,DOORS MODIFICATION & RELATED CONSTRUCTION AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00936967-I1
10/17/2023
Special inspection requirement — Lighting controls
JONAR MADRIAGA
10/17/2023
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
10/17/2023
Special inspection requirement — Interior lighting power
JONAR MADRIAGA
10/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
JONAR MADRIAGA
10/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
09/20/2023
Special inspection requirement — Final
JONAR MADRIAGA
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/28/2022
Signed off — Alteration
Q00712907-I1
07/05/2022
Permit issued — Mechanical Systems
Q00712907-I1-MS
06/27/2022
Filed — Alteration
Q00712907-I1
05/29/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPERRY MECHANICAL CONTRACT12/18/2023
DOB NOWGeneral ConstructionSigned-offGREGOR INDUSTRIES INC11/20/2023
DOB NOWGeneral ConstructionSigned-offGREGOR INDUSTRIES INC11/08/2023
DOB NOWMechanical SystemsSigned-offINTEGRATED HVAC SYS SVC07/05/2022
BISOTISSUEDMCCOLLISTERS TRANSPORTATI08/30/2018
BISMHISSUEDPERRY MECHANICAL CONTRACT05/01/2018
BIS—ISSUEDAMERICAN SIGN & ELECL CON11/28/2007
BIS—ISSUEDAMERICAN SIGN & ELECL CON11/28/2007
BIS—ISSUEDAMERICAN SIGN & ELECL CON03/23/2000
BIS—ISSUEDAMERICAN SIGN & ELECL CON03/23/2000
BISOTISSUEDECG CONTRACTING INC.11/18/1998
BISBLISSUEDMC READY & RICE PLG08/22/1990
BISPLISSUEDMC READY & RICE PLG08/22/1990
1 project · most recent 12/18/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/18/2023Permit IssuedPERRY MECHANICAL CONTRACTHeating and Air Conditioning Systems
Heat / Cool
Lg LUU480HV 48,000 BTU · Vrf Outdoor ×2
LVN480HV 1,400 CFM · Vrf Indoor ×2
York NL180C00D2BAA2 6,000 CFM · Fan Coil Indoor ×1
YC180C00A2AA5 181,000 BTU · Condensing Unit ×1
2 projects · most recent 11/21/2023
General Wiring
FiledStatusContractorScope
11/21/2023Permit IssuedPOWERONE ELECT'L CONTRGGeneral Wiring
02/04/2018CompleteCORP. ELEC'L TECHNOLOGIES—
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/13/2023HVAC-R and service water heating equipmentObaid Mianenergy_progress
12/13/2023HVAC-R and service water piping design and insulationObaid Mianenergy_progress
12/13/2023Maintenance informationObaid Mianenergy_progress
12/13/2023HVAC-R and service water heating system controlsObaid Mianenergy_progress
12/07/2023FinalObaid Mianprogress
12/07/2023Mechanical SystemsObaid Mianspecial
10/17/2023Lighting controlsJONAR MADRIAGAenergy_progress
10/17/2023Energy Code Compliance InspectionsJONAR MADRIAGAprogress
10/17/2023Interior lighting powerJONAR MADRIAGAenergy_progress
10/02/2023Fire-Resistance Rated ConstructionJONAR MADRIAGAprogress
10/02/2023Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
09/20/2023FinalJONAR MADRIAGAprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Capital One BankOffice—
Project Q00973258 Alteration · Permit Entire · 12/18/2023
Capital OneOfficeFloor 1
Project Q00936967 Alteration · LOC Issued · 11/01/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00712907-I1Request digital key ↗
08/23/2026Q00936967-I1Request digital key ↗
08/23/2026Q00949379-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
08/28/2018440505614Open ↗
04/30/2018440479581Open ↗
▸BISWORK PERMIT APPLICATION2
08/28/2018440505614Open ↗
04/30/2018440479581Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature10
09/12/2026Q00973258-I1Open ↗
09/12/2026Q00973258-I1Open ↗
09/12/2026Q00973258-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00712907-I1Open ↗
08/23/2026Q00936967-I1Open ↗
08/13/2026Q00973258-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/21/2019440505614Open ↗
03/21/2019440505614Open ↗
03/21/2019440505614Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/28/2018440505614Open ↗
04/30/2018440479581Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/28/2018440505614Open ↗
04/30/2018440479581Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/28/2018440505614Open ↗
04/30/2018440479581Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/12/2026Q00973258-I1Open ↗
08/25/2026Q00936967-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00712907-I1Open ↗
08/23/2026Q00936967-I1Open ↗
08/13/2026Q00973258-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/28/2018440505614Open ↗
04/30/2018440479581Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/10/2019440505614Open ↗
03/21/2019440505614Open ↗
03/21/2019440505614Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/28/2018440505614Open ↗
04/30/2018440479581Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/21/2019440505614Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/30/2018440479581Open ↗
▸BISNYCECC ANALYSIS1
08/28/2018440505614Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/28/2018440505614Open ↗
04/30/2018440479581Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/06/2019440505614Open ↗
03/21/2019440505614Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
04/10/2019440505614Open ↗
03/21/2019440505614Open ↗
08/28/2018440505614Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
08/28/2018440505614Open ↗
04/30/2018440479581Open ↗
▸BISADDITIONAL INFORMATION1
12/18/2018440505614Open ↗
▸BISBOROUGH INTAKE FORM1
03/21/2019440505614Open ↗