1940Year Built
2.5Stories
A1Building Class
R1-2Zoning
3,650 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 11,272 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction34p · 2 filings · 20 docs
Floor 2Under Construction42p · 1 filing · 20 docs
Floor 1Under Construction41p · 1 filing · 20 docs
CellarUnder Construction34p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KR DISIGN GROUP907/08/2026
YEHUDIT DAVID MOD CONSULT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHARLES DIEHL ARCHITECT LLC1006/09/2026
VIBRANCY CONSULTING CORPORATION101/08/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MOD CONSULTANTS LLCGeneral Contractor607/08/2026
KET ELECTRIC LLCElectrical103/22/2026
OAK & STONE DEMOLITIONGeneral Contractor107/08/2026
SUNATION SOLAR SYSTEMSGeneral Contractor109/30/2026
MILLER PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317612/11/2025
AA BUILDING & INSPECTION1519104/15/2024
Building Lifecycle
All (122)Filed (11)Permit Issued (7)Signed Off (1)Violation (1)Inspection (10)Objection (62)Special Inspection (30)
09/29/2026
Permit issued — Solar
Q01465580-I1-SL
07/13/2026
Special inspection requirement — Structural Steel - Details
07/13/2026
Special inspection requirement — Final
07/13/2026
Special inspection requirement — Structural Cold-Formed Steel
07/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/13/2026
Special inspection requirement — Concrete - Cast-In-Place
07/13/2026
Special inspection requirement — Masonry
07/13/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
06/23/2026
Objection resolved — Addressed
06/23/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
06/23/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
06/23/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
06/23/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Younes Abouyaala
06/23/2026
Special inspection requirement — Final
NAVEEN KUMAR
06/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
06/17/2026
Objection raised — Other
06/09/2026
Filed — Alteration
PROPOSED RELOCATION OF PLUMBING FIXTURES AT CELLAR; PROPOSED INSTALLATION OF PLUMBING FIXTURES AT 1ST FLOOR; PROPOSED RELOCATION AND INSTALLATION OF PLUMBING FIXTURES AT 2ND FLOOR; PROPOSED INSTALLATION OF A NEW DRYWELL AT OPEN SPACE.
Q01003443-P4
06/09/2026
Filed — Alteration
PROPOSED RELOCATION OF PLUMBING FIXTURES AT CELLAR; PROPOSED INSTALLATION OF PLUMBING FIXTURES AT 1ST FLOOR; PROPOSED RELOCATION AND INSTALLATION OF PLUMBING FIXTURES AT 2ND FLOOR; PROPOSED INSTALLATION OF A NEW DRYWELL AT OPEN SPACE.
Q01003443-P5
06/09/2026
Special inspection requirement — Masonry
06/09/2026
Special inspection requirement — Footing and Foundation
06/09/2026
Special inspection requirement — Structural Cold-Formed Steel
06/09/2026
Special inspection requirement — Concrete - Cast-In-Place
06/09/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/09/2026
Special inspection requirement — Final
06/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/09/2026
Special inspection requirement — Concrete - Cast-In-Place
06/09/2026
Special inspection requirement — Structural Steel - Details
06/09/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
06/09/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/09/2026
Special inspection requirement — Final
06/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
02/17/2026
Special inspection requirement — Interior lighting power
MAXIM KORNGOLD
02/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MAXIM KORNGOLD
02/17/2026
Special inspection requirement — Fenestration areas
MAXIM KORNGOLD
02/13/2026
Objection resolved — Addressed
02/02/2026
Objection raised — Cost
01/27/2026
Objection resolved — Addressed
01/06/2026
Objection raised — Other
12/11/2025
Filed — Alteration
PROPOSED RELOCATION OF PLUMBING FIXTURES AT CELLAR; PROPOSED INSTALLATION OF PLUMBING FIXTURES AT 1ST FLOOR; PROPOSED RELOCATION AND INSTALLATION OF PLUMBING FIXTURES AT 2ND FLOOR; PROPOSED INSTALLATION OF A NEW DRYWELL AT OPEN SPACE.
Q01003443-P3
12/05/2025
Permit issued — Mechanical Systems
Q01003443-S4-MS
12/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2025
Permit issued — General Construction
Q01003443-I1-GC
10/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/01/2025
Permit issued — Plumbing
Q01003443-S1-PL
09/05/2025
Filed — Alteration
PROPOSED RELOCATION OF PLUMBING FIXTURES AT CELLAR; PROPOSED INSTALLATION OF PLUMBING FIXTURES AT 1ST FLOOR; PROPOSED RELOCATION AND INSTALLATION OF PLUMBING FIXTURES AT 2ND FLOOR; PROPOSED INSTALLATION OF A NEW DRYWELL AT OPEN SPACE.
Q01003443-P2
08/22/2025
Signed off — Alteration
Temporary Construction Fence Installation
Q01159261-I1
08/13/2025
Objection resolved — Addressed
07/29/2025
Objection raised — Cost
07/14/2025
Filed — Alteration
PROPOSED RELOCATION OF PLUMBING FIXTURES AT CELLAR; PROPOSED INSTALLATION OF PLUMBING FIXTURES AT 1ST FLOOR; PROPOSED RELOCATION AND INSTALLATION OF PLUMBING FIXTURES AT 2ND FLOOR; PROPOSED INSTALLATION OF A NEW DRYWELL AT OPEN SPACE.
Q01003443-P1
06/13/2025
Violation issued (ECB, closed)
Construction
02/03/2025
Permit issued — Construction Fence
Q01159261-I1-FN
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNATION SOLAR SYSTEMS09/29/2026
DOB NOWMechanical SystemsPermit IssuedMOD CONSULTANTS LLC12/05/2025
DOB NOWGeneral ConstructionPermit IssuedMOD CONSULTANTS LLC11/03/2025
DOB NOWPlumbingPermit IssuedMILLER PLBG & HTG INC10/01/2025
DOB NOWConstruction FenceSigned-offOAK & STONE DEMOLITION02/03/2025
DOB NOWMechanical SystemsPermit IssuedMOD CONSULTANTS LLC10/30/2024
DOB NOWGeneral ConstructionPermit IssuedMOD CONSULTANTS LLC10/29/2024
BISPLISSUEDSIDERIS PLBG & HTG CORP11/14/2002
1 project · most recent 06/09/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/09/2026Permit IssuedMOD CONSULTANTS LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-2C20NA2 2 tons · Heat Pump Outdoor ×1
MXZ-4C36NA2 3 tons · Heat Pump Outdoor ×1
Ventilation
Panasonic FV-08VQ3 80 CFM · Exhaust Fan ×3
1 project · most recent 06/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/09/2026Permit IssuedROCKEFELLER PLMBG & HTG IGas, Storm, Water/Sanitary
2 projects · most recent 09/18/2026
General Wiring
FiledStatusContractorScope
09/18/2026Permit IssuedGALLANT ELEC'L CONST, INC—
11/20/2025CompleteKET ELECTRIC LLCGeneral Wiring
1 project · most recent 06/09/2026
Steel Masonry
FiledStatusContractorScope
06/09/2026Permit IssuedMOD CONSULTANTS LLCSteel, Masonry
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/24/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
07/13/2026Wall Panels, Curtain Walls, and Veneers—special
07/13/2026Structural Cold-Formed Steel—special
07/13/2026Structural Steel - Details—special
07/13/2026Structural Stability – Alterations of existing buildings—special
07/13/2026Concrete - Cast-In-Place—special
07/13/2026Masonry—special
07/13/2026Final—progress
06/23/2026Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
06/23/2026Footing and FoundationYounes Abouyaalaprogress
06/23/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
06/23/2026Subsurface Conditions – Fill Placement & In-Place DensityYounes Abouyaalaspecial
06/23/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
06/23/2026FinalNAVEEN KUMARprogress
06/09/2026Final—progress
06/09/2026Footing and Foundation—progress
06/09/2026Final—progress
06/09/2026Subsurface Conditions – Fill Placement & In-Place Density—special
06/09/2026Structural Stability – Alterations of existing buildings—special
06/09/2026Wall Panels, Curtain Walls, and Veneers—special
06/09/2026Excavations - Sheeting, Shoring, and Bracing—special
06/09/2026Concrete - Cast-In-Place—special
06/09/2026Concrete - Cast-In-Place—special
06/09/2026Masonry—special
06/09/2026Structural Cold-Formed Steel—special
06/09/2026Structural Stability – Alterations of existing buildings—special
Latest 25 of 75.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/21/2026Q01159261-I1Request digital key ↗
08/16/2026Q01003443-S4Request digital key ↗
08/16/2026Q01003443-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01003443-I1Open ↗
08/13/2026Q01003443-P3Open ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature38
09/01/2026Q01003443-I1Open ↗
09/01/2026Q01003443-I1Open ↗
09/01/2026Q01003443-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026Q01003443-I1Open ↗
08/29/2026Q01003443-P2Open ↗
08/29/2026Q01003443-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/16/2026Q01003443-S4Open ↗
08/16/2026Q01003443-P1Open ↗
08/16/2026Q01003443-P2Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/16/2026Q01003443-S4Open ↗
08/16/2026Q01003443-P1Open ↗
08/16/2026Q01003443-P2Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01003443-S2Open ↗
▸Other Documents8
▸DOB NOWPlot Diagram4
08/15/2026Q01003443-P4Open ↗
08/13/2026Q01003443-I1Open ↗
08/13/2026Q01003443-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026Q01003443-I1Open ↗
08/13/2026Q01003443-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01003443-I1Open ↗
08/13/2026Q01003443-P3Open ↗