8 Open Violations ▸FDNY Report ↗
Two family brick · Owner of record: ADELPHI STREET, LLC · 2,000 sf lot · 1.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof9p · 4 filings · 20 docs
Floor 23p · 3 filings · 20 docs
Floor 13p · 1 filing · 14 docs
Cellar6p · 3 filings · 20 docs
Basement5p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW AMERICAN CONSTRUCTION INC407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/22/2025$5.6M—ADELPHI STREET, LLC → ADELPHI FG CG MG LLC$1,572/sf building
11/24/2020$3.1M—— → —$884/sf building
11/22/2019$2.1M—Private party → 216 ALDELPHI STREET LLC$585/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABS ENGINEERING, PLLC906/04/2024
ENTHINK ENGINEERS LLC107/20/2022
SILMAN211/19/2021
WALTER B. MELVIN ARCHITECTS, LLC109/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL ZENREICH ARCHITECT2203/21/2026
BOYD CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SF CONSTRUCTION SVCS INCGeneral Contractor3507/08/2026
BROOK PLUMBING & HTG CORPPlumbing607/08/2026
STIVAN PLBG & HTG INCPlumbing403/22/2026
TM SELECT ELECTRIC CORPElectrical103/22/2026
BROOK PLUMBING & HTG CORPFire Protection107/08/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABS ENGINEERING, PLLC4835906/04/2024
BLUE SKY DESIGN, INC.1908511/19/2021
Building Lifecycle
All (109)Filed (13)Permit Issued (21)Signed Off (6)Violation (9)Inspection (6)Objection (24)Special Inspection (30)
11/24/2025
Violation issued (HPD, open)
I
12/03/2024
Violation issued (HPD, open)
I
07/08/2024
Signed off — Alteration
Application being filed to show sprinkler work on floors Cellar, Basement, 001 thru 003 in conjunction with the complete renovation work as per plans filed herewith. No change in use, egress, or occupancy.
B00559321-I1
07/08/2024
Signed off — Alteration
Application being filed to show plumbing work being performed in the Cellar, Basement, 1st thru 3rd floors as per plans filed herewith. No change in use, egress,or occupancy.
B00559300-I1
06/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
06/21/2024
Special inspection requirement — Post-installed Anchors
Alex Schwartz
06/13/2024
Objection raised — Other
06/13/2024
Objection resolved — Addressed
06/04/2024
Filed — Alteration
Application being filed to show plumbing work being performed in the Cellar, Basement, 1st thru 3rd floors as per plans filed herewith. No change in use, egress,or occupancy.
B00559300-P4
05/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
05/23/2024
Special inspection requirement — Post-installed Anchors
Alex Schwartz
04/08/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/28/2023
Violation issued (HPD, open)
I
10/10/2023
Signed off — Alteration
Application being filed for the Mechanical work including newVRF system(s), boiler and kitchen,toilet & laundry exhaust systems. Natrual ventilation provided, refer to OT application drawings. No change in use, egress, or occupancy.
B00559269-I1
10/04/2023
Signed off — Alteration
Application being filed for the addition of new dunnage for MH units, new joists to support FDNY bridge over dunnage and new steel framed rear deck and stair to grade, supported on new concrete foundations. No change in use, egress, or occupancy.
B00619013-I1
07/19/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/17/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/17/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
05/03/2023
Permit issued — Mechanical Systems
B00559269-I1-MS
05/03/2023
Permit issued — Structural
B00619013-I1-ST
04/28/2023
Signed off — Alteration
B00565352-I1
04/10/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00776398-I1
03/24/2023
Filed — Alteration
Application being filed to show plumbing work being performed in the Cellar, Basement, 1st thru 3rd floors as per plans filed herewith. No change in use, egress,or occupancy.
B00559300-P3
02/22/2023
Special inspection requirement — Post-installed Anchors
Alex Schwartz
02/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
01/12/2023
Permit issued — Mechanical Systems
B00559269-I1-MS
01/12/2023
Permit issued — Structural
B00565352-I1-ST
01/12/2023
Permit issued — Structural
B00619013-I1-ST
01/03/2023
Permit issued — Plumbing
B00559300-I1-PL
01/03/2023
Permit issued — Sprinklers
B00559321-I1-EW-SP
11/17/2022
Violation issued (HPD, open)
I
11/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
10/03/2022
Special inspection requirement — Heating Systems
Alex Schwartz
10/03/2022
Special inspection requirement — Final
Alex Schwartz
10/03/2022
Special inspection requirement — Post-installed Anchors
Alex Schwartz
10/03/2022
Special inspection requirement — Mechanical Systems
Alex Schwartz
09/30/2022
Objection resolved — Addressed
09/30/2022
Objection resolved — Addressed
09/28/2022
Objection raised — Admin
09/28/2022
Objection raised — Scope
09/26/2022
Filed — Alteration
Application being filed to show plumbing work being performed in the Cellar, Basement, 1st thru 3rd floors as per plans filed herewith. No change in use, egress,or occupancy.
B00559300-P2
09/26/2022
Filed — Alteration
Application being filed for the Mechanical work including newVRF system(s), boiler and kitchen,toilet & laundry exhaust systems. Natrual ventilation provided, refer to OT application drawings. No change in use, egress, or occupancy.
B00559269-P1
09/26/2022
Filed — Alteration
Application being filed to show sprinkler work on floors Cellar, Basement, 001 thru 003 in conjunction with the complete renovation work as per plans filed herewith. No change in use, egress, or occupancy.
B00559321-P1
09/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
09/19/2022
Special inspection requirement — Post-installed Anchors
Alex Schwartz
09/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
09/19/2022
Special inspection requirement — Heating Systems
Alex Schwartz
09/19/2022
Special inspection requirement — Mechanical Systems
Alex Schwartz
09/19/2022
Special inspection requirement — Post-installed Anchors
Alex Schwartz
09/19/2022
Special inspection requirement — Final
Alex Schwartz
09/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
09/19/2022
Special inspection requirement — Post-installed Anchors
Alex Schwartz
09/19/2022
Special inspection requirement — Sprinkler Systems
Alex Schwartz
08/01/2022
Permit issued — Mechanical Systems
B00559269-I1-MS
08/01/2022
Permit issued — Structural
B00565352-I1-ST
08/01/2022
Permit issued — Structural
B00619013-I1-ST
07/20/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00776398-I1
07/20/2022
Permit issued — Sidewalk Shed
B00776398-I1-SH
06/15/2022
Permit issued — Structural
B00565352-I1-ST
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSF CONSTRUCTION SVCS INC05/03/2023
DOB NOWStructuralSigned-offSF CONSTRUCTION SVCS INC05/03/2023
DOB NOWMechanical SystemsSigned-offSF CONSTRUCTION SVCS INC01/12/2023
DOB NOWStructuralSigned-offSF CONSTRUCTION SVCS INC01/12/2023
DOB NOWStructuralSigned-offSF CONSTRUCTION SVCS INC01/12/2023
DOB NOWPlumbingSigned-offBROOK PLUMBING & HTG CORP01/03/2023
DOB NOWSprinklersSigned-offSHARP PLUMBING CORP01/03/2023
DOB NOWMechanical SystemsSigned-offSF CONSTRUCTION SVCS INC08/01/2022
DOB NOWStructuralSigned-offSF CONSTRUCTION SVCS INC08/01/2022
DOB NOWStructuralSigned-offSF CONSTRUCTION SVCS INC08/01/2022
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION07/20/2022
DOB NOWStructuralSigned-offSF CONSTRUCTION SVCS INC06/15/2022
DOB NOWMechanical SystemsSigned-offSF CONSTRUCTION SVCS INC06/15/2022
DOB NOWStructuralSigned-offSF CONSTRUCTION SVCS INC06/15/2022
DOB NOWMechanical SystemsSigned-offSF CONSTRUCTION SVCS INC05/17/2022
DOB NOWStructuralSigned-offSF CONSTRUCTION SVCS INC05/17/2022
DOB NOWStructuralSigned-offSF CONSTRUCTION SVCS INC05/17/2022
DOB NOWPlumbingSigned-offBROOK PLUMBING & HTG CORP02/02/2022
DOB NOWStructuralSigned-offSF CONSTRUCTION SVCS INC11/23/2021
DOB NOWMechanical SystemsSigned-offSF CONSTRUCTION SVCS INC11/10/2021
DOB NOWStructuralSigned-offSF CONSTRUCTION SVCS INC09/22/2021
BISOTISSUEDSF CONSTRUCTION SVCS INC08/14/2023
BISOTISSUEDSF CONSTRUCTION SVCS INC01/12/2023
BISOTISSUEDSF CONSTRUCTION SVCS INC07/29/2022
BISOTISSUEDSF CONSTRUCTION SVCS INC06/15/2022
BISOTISSUEDSF CONSTRUCTION SVCS INC05/17/2022
BISOTISSUEDSF CONSTRUCTION SVCS INC08/10/2021
3 projects · most recent 11/13/2023
General Wiring
FiledStatusContractorScope
11/13/2023CompleteTM SELECT ELECTRIC CORPGeneral Wiring
07/29/2022CompleteRICHARD NEU—
04/08/2022CompleteTM SELECT ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/17/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/29/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
06/21/2024Fire-Resistant Penetrations and JointsAlex Schwartzspecial
06/21/2024Post-installed AnchorsAlex Schwartzspecial
05/23/2024Fire-Resistant Penetrations and JointsAlex Schwartzspecial
05/23/2024Post-installed AnchorsAlex Schwartzspecial
02/22/2023Post-installed AnchorsAlex Schwartzspecial
02/22/2023Fire-Resistant Penetrations and JointsAlex Schwartzspecial
10/03/2022Fire-Resistant Penetrations and JointsAlex Schwartzspecial
10/03/2022Heating SystemsAlex Schwartzspecial
10/03/2022FinalAlex Schwartzprogress
10/03/2022Post-installed AnchorsAlex Schwartzspecial
10/03/2022Mechanical SystemsAlex Schwartzspecial
09/19/2022Fire-Resistant Penetrations and JointsAlex Schwartzspecial
09/19/2022Post-installed AnchorsAlex Schwartzspecial
09/19/2022Fire-Resistant Penetrations and JointsAlex Schwartzspecial
09/19/2022Heating SystemsAlex Schwartzspecial
09/19/2022Mechanical SystemsAlex Schwartzspecial
09/19/2022Post-installed AnchorsAlex Schwartzspecial
09/19/2022FinalAlex Schwartzprogress
09/19/2022Fire-Resistant Penetrations and JointsAlex Schwartzspecial
09/19/2022Post-installed AnchorsAlex Schwartzspecial
09/19/2022Sprinkler SystemsAlex Schwartzspecial
11/22/2021FinalANDREW RENFROEprogress
11/22/2021Post-installed AnchorsANDREW RENFROEspecial
11/22/2021Structural Steel - DetailsANDREW RENFROEspecial
11/22/2021Structural Wood FrameANDREW RENFROEprogress
Latest 25 of 39.
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/01/2026B00565352-I1Request digital key ↗
08/31/2026B00559269-I1Request digital key ↗
08/31/2026B00559300-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits17
▸DOB NOWLPC Approval/Permit10
08/13/2026B00559300-I1Open ↗
08/13/2026B00559300-P3Open ↗
08/13/2026B00559269-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
04/04/2023322030253Open ↗
07/15/2021322030253Open ↗
03/12/2021322030253Open ↗
Showing 3 of 5 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
07/15/2021322030253Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
07/15/2021322030253Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
09/16/2021322030253Open ↗
04/24/2020322030253Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00565352-I1Open ↗
08/31/2026B00559269-P1Open ↗
08/31/2026B00559269-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/27/2026B00619013-I1Open ↗
09/27/2026B00619013-I1Open ↗
09/02/2026B00619013-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/27/2026B00619013-I1Open ↗
09/02/2026B00619013-P1Open ↗
08/24/2026B00559269-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/05/2020322030253Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWFDNY: Letter of No Objection2
08/13/2026B00559321-P1Open ↗
08/13/2026B00559321-I1Open ↗
▸BISPLUMBING (PL) SIGNOFF1
01/26/2024322030253Open ↗
▸Safety & Tenant Protection2
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/21/2020322030253Open ↗
▸BISTenant Protection Plan and Notes1
03/05/2020322030253Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/31/2026B00559269-I1Open ↗
08/31/2026B00559300-P3Open ↗
08/31/2026B00559300-I1Open ↗
Showing 3 of 11 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
08/15/2022322030253Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/05/2021322030253Open ↗
04/24/2020322030253Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/26/2024322030253Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/26/2024322030253Open ↗
▸BISFENESTRATION AREAS1
01/26/2024322030253Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/26/2024322030253Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/26/2024322030253Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/26/2024322030253Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/26/2024322030253Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/05/2020322030253Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/26/2024322030253Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00559269-I1Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY8
09/24/2024322030253Open ↗
09/11/2024322030253Open ↗
08/16/2021322030253Open ↗
Showing 3 of 8 on file for this type
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/29/2024322030253Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/26/2024322030253Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/26/2024322030253Open ↗
▸BISSOIL REPORT1
04/24/2020322030253Open ↗
▸BISMECHANICAL SYSTEMS1
01/26/2024322030253Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/02/2024322030253Open ↗
▸BISLANDMARKS SIGNOFF1
01/29/2024322030253Open ↗
▸BISFINAL1
01/26/2024322030253Open ↗
▸BISLANDMARKS APPROVAL1
04/21/2020322030253Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/05/2021322030253Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
04/20/2020322030253Open ↗
03/05/2020322030253Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/26/2024322030253Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
05/05/2023322030253Open ↗
04/14/2023322030253Open ↗
09/16/2021322030253Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
03/26/2020322030253Open ↗
▸BISEFILING COVER SHEET1
03/05/2020322030253Open ↗
▸Other Documents2
▸BISSHUTOFF DAMPERS1
01/26/2024322030253Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/16/2021322030253Open ↗