Two family converted from one family
216 EAST 201ST STREET
BRONX · BIN 2017194
💬 Discuss this project
1915Year Built
2.5Stories
B3Building Class
R8Zoning
2,480 sfGross Floor Area
2Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Two family converted from one family · 2,250 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsTemporary personnel hoist installation2 filings
RoofNew 11-story Concrete Residential Building6p · 1 filing · 12 docs
BulkheadNew 11-story Concrete Residential Building12p · 2 filings · 20 docs
AtticInterior non-rated partition1 filing · 6 docs
Floor 11New 11-story Concrete Residential Building9p · 1 filing · 12 docs
Floor 10
Floor 9Temporary Needle Beam Installation1 filing
Floor 8Temporary Needle Beam Installation1 filing
Floor 7Temporary Needle Beam Installation1 filing
Floor 6Temporary Needle Beam Installation1 filing
Floor 5Temporary Needle Beam Installation1 filing
Floor 4
Floor 3
Floor 2New 11-story Concrete Residential Building5p · 2 filings · 12 docs
Floor 1New 11-story Concrete Residential Building8p · 2 filings · 12 docs
CellarInterior non-rated partition1 filing · 6 docs
Site & exteriorInstallation of temporary sidewalk shed3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SCG Realty2409/13/2026
SCG Capital2007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/13/2026$1.3M—Private party → 201 GG LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Soni Engineering Consulting1007/08/2026
Nikolai Katz Architect606/03/2026
Elevated Engineering NYC506/02/2026
CD Architect Studio108/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Innovative Construction NYCGeneral Contractor707/11/2026
Core Scaffold SystemsScaffold608/26/2026
Prime Piping & HeatingFire Protection306/28/2026
Trinchese ConstructionGeneral Contractor203/21/2026
Innovative Construction NYCScaffold206/27/2026
N Tech Design of AmericaGeneral Contractor107/08/2026
KmiScaffold107/08/2026
Prime Piping & HeatingPlumbing106/02/2026
M.R. Electrical ServiceElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161006/02/2026
CD Architect Studio2573108/06/2024
Building Lifecycle
All (96)Filed (23)Signed Off (2)Violation (20)Objection (18)Special Inspection (30)Tax Incentive (3)
05/02/2027
485-x construction completed
08/07/2026
Objection resolved — Addressed
08/07/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Vestibules
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Air barrier — testing
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
08/07/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
07/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01382716-P1
07/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01382733-P1
07/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01382726-P1
06/30/2026
Violation issued (ECB, closed)
Construction
06/30/2026
Violation issued (ECB, closed)
Construction
06/26/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01398893-P1
06/25/2026
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01397603-P1
06/22/2026
Violation issued (ECB, closed)
Unknown
06/18/2026
Objection raised — Other
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Shutoff dampers
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Duct leakage testing, insulation and design
SHAHRIAR QUAYYUM
06/03/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01197447-I1
X01197447-Z1
06/02/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01197447-I1
X01197447-P2
05/31/2026
Special inspection requirement — Footing and Foundation
SHAHRIAR QUAYYUM
05/25/2026
485-x registration filed
05/20/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01197447-I1
X01197447-P4
05/19/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01197447-I1
X01197447-P3
05/14/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01197447-I1
X01197447-P1
05/13/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01197447-I1
X01197447-P5
05/12/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01382716-I1
05/11/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01398893-I1
05/11/2026
485-x construction commenced
05/08/2026
Signed off — Full Demolition
Full demolition to a three story house
X01280067-I1
05/07/2026
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01397603-I1
04/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01382733-I1
04/07/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01382726-I1
02/09/2026
Objection resolved — Addressed
02/09/2026
Objection resolved — Addressed
09/22/2025
Filed — Full Demolition
Full demolition to a three story house
X01280067-I1
09/15/2025
Objection resolved — Addressed
09/02/2025
Objection raised — Other
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDSunco Capital06/26/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
08/07/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
08/07/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/07/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
08/07/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
08/07/2026MeteringSHAHRIAR QUAYYUMenergy_progress
08/07/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
08/07/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
08/07/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/07/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
08/07/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
08/07/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
08/07/2026VestibulesSHAHRIAR QUAYYUMenergy_progress
08/07/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
08/07/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/07/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
08/07/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
08/07/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
08/07/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
06/11/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
06/11/2026Shutoff dampersSHAHRIAR QUAYYUMenergy_progress
06/11/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
06/11/2026Duct leakage testing, insulation and designSHAHRIAR QUAYYUMenergy_progress
06/11/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
06/11/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
06/11/2026FinalSHAHRIAR QUAYYUMprogress
Latest 25 of 88.
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/26/2026X01382726-P1Request digital key ↗
08/26/2026X01382726-I1Request digital key ↗
08/26/2026X01382733-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/23/2023240350286Open ↗
▸BISWORK PERMIT APPLICATION1
06/26/2023240350286Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026X01197447-I1Open ↗
08/14/2026X01197447-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026X01197447-I1Open ↗
08/14/2026X01197447-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/06/2026240362889Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026X01197447-I1Open ↗
▸Seals & Professional Certifications67
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/14/2026X01197447-P7Open ↗
09/14/2026X01197447-P8Open ↗
08/26/2026X01382726-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026X01197447-P8Open ↗
09/23/2026X01197447-P7Open ↗
09/23/2026X01197447-S7Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026X01197447-P7Open ↗
09/04/2026X01197447-S6Open ↗
08/28/2026X01197447-S2Open ↗
Showing 3 of 15 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/23/2023240350286Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/23/2023240350286Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/28/2025240362889Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/23/2023240350286Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/18/2026X01280067-I1Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWWater Cut-Off1
08/18/2026X01280067-I1Open ↗
▸DOB NOWGas Cut-Off1
08/18/2026X01280067-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/18/2026X01280067-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026X01197447-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/16/2026X01197447-I1—
▸DOB NOWElectric Cut-Off1
08/18/2026X01280067-I1Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST2
12/15/2025240362889Open ↗
07/28/2025240362889Open ↗
▸DOB NOWStreet Tree Checklist2
08/16/2026X01197447-I1Open ↗
08/14/2026X01197447-P1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/15/2025240362889Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
06/26/2023240350286Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026X01197447-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026X01280067-I1Open ↗
08/13/2026X01032107-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/23/2023240350286Open ↗
▸DOB NOWRodent Control1
08/18/2026X01280067-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/18/2023240350286Open ↗
06/26/2023240350286Open ↗
06/23/2023240350286Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
06/23/2023240350286Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
09/18/2023240350286Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/18/2023240350286Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/23/2023240350286Open ↗
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT4
08/16/2026X01197447-P4Open ↗
08/16/2026X01197447-P3Open ↗
08/13/2026X01197447-S4Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/18/2023240350286Open ↗
06/26/2023240350286Open ↗
06/23/2023240350286Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/16/2026X01197447-S4Open ↗
08/13/2026X01197447-S3Open ↗
▸DOB NOWTR4: Test Report and Plot Diagram1
08/13/2026X01197447-S4Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/19/2023240350286Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
06/23/2023240350286Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/18/2023240350286Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
07/28/2025240362889Open ↗
06/23/2023240350286Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/28/2025240362889Open ↗
▸Other Documents15
▸DOB NOWProperty Ownership Certification3
08/16/2026X01197447-I1Open ↗
08/14/2026X01197447-P1Open ↗
08/13/2026X01280067-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/16/2026X01197447-I1Open ↗
08/14/2026X01197447-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026X01197447-I1Open ↗
08/14/2026X01197447-P1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/16/2026X01197447-S4Open ↗
08/16/2026X01197447-S3Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/06/2026240362889Open ↗
▸BISTax Abatement Miscellaneous1
09/19/2023240350286Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/28/2025240362889Open ↗
▸DOB NOWCommunity Board Notification1
08/18/2026X01280067-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/18/2026X01280067-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01280067-I1Open ↗