← Back
BuildNYC
Two stories - detached, small or mid-size
216 OAKWOOD AVENUE
STATEN ISLAND · BIN 5006945
💬 Discuss this project
1899Year Built
2Stories
A1Building Class
R3XZoning
1,272 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,875 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 28p · 1 filing · 15 docs
Floor 114p · 2 filings · 20 docs
Cellar13p · 2 filings · 20 docs
Site & exterior7p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
F360 Architecture412/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Up Design Services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
John PedullaGeneral Contractor303/21/2026
DPH Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jose A Santos PE3292112/20/2021
Building Lifecycle
06/07/2024
Failure to comply with zoning resolution front yard planting requirement. At time of inspection i observed /installed impervious concrete surface…
ECB violation · closed
12/14/2022
Filed — Alteration
proposal of plumbing fixtures at cellar and 1st floor levels
S00650260-P3
11/29/2022
Signed off — Alteration
proposed horizontal extension and interior renovation of existing one family dwelling as well as proposed rear deck@ osp
S00650139-I1
11/10/2022
Filed — Alteration
proposal of plumbing fixtures at cellar and 1st floor levels
S00650260-P1
11/09/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
24 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJohn Pedulla07/05/2022
DOB NOWPlumbingSigned-offDPH Plumbing & Heating06/08/2022
1 project · most recent 12/14/2022
Gas Water/Sanitary
FiledStatusContractorScope
12/14/2022Signed-offDPH Plumbing & HeatingGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/09/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/31/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2022Fail-Final General Construction Non-Directive 14FailView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
04/27/2022Fire-Resistant Penetrations and JointsJose Santosspecial
04/27/2022Energy Code Compliance InspectionsJose Cruzprogress
04/27/2022Fire-Resistance Rated ConstructionJose Cruzprogress
04/27/2022Interior lighting powerJose Cruzenergy_progress
04/27/2022Insulation placement and R valuesJose Cruzenergy_progress
04/27/2022Fenestration and door U-factor and product ratingsJose Cruzenergy_progress
04/27/2022Lighting in dwelling unitsJose Cruzenergy_progress
24 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account