← Back
BuildNYC
Two family frame
2160 STORY AVENUE
BRONX · Castle Hill-Unionport · BIN 2022845
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R3-2Zoning
1,760 sfGross Floor Area
2Units
1 Active Violation ▸FDNY Report ↗
Two family frame · 2,575 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 25p · 1 filing · 11 docs
Floor 15p · 1 filing · 11 docs
Cellar3p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nta Design Group106/27/2025
AZ Professional Engineering207/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Team Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Piola Property ManagementGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AZ Professional Engineering766207/26/2023
Building Lifecycle
07/02/2025
Objection raised — Plumbing
06/27/2025
Filed — Alteration
APPLICATION FILED FOR RENOVATION OF FIRE DAMAGED DWELLING UNITS AS PER PLANS FILED. NO CHANGE IN USE , OCCUPANCY OR EGRESS.
X00711739-S1
08/13/2024
: work without permit; noted at cellar level erected full height partitions to create 2-piece bathroom. Installed water and waste lines for 2-piece…
ECB violation · open
08/30/2023
Closed: Due to fire
DOB violation · closed on the city's record
08/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
21 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPiola Property Management07/15/2022
1 project · most recent 06/27/2025
Water/Sanitary
FiledStatusContractorScope
06/27/2025——Water/Sanitary
3 projects · most recent 01/06/2023
General Wiring
FiledStatusContractorScope
01/06/2023CompleteJCS Electric Contrng—
10/18/2022CompleteJCS Electric ContrngGeneral Wiring
12/28/2021Permit IssuedAll Ways Electric Corp.w—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/02/2023Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
08/02/2023Structural Stability – Alterations of existing buildingsVIJAY KUMARspecial
07/26/2023Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
07/26/2023Structural Stability – Alterations of existing buildingsVIJAY KUMARspecial
11 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account